Laserfiche WebLink
2020 System Development Fee Calculations <br />Permit #: PW1909-078 <br />Additional Notes: <br />Project Address: 2410 Railway Ave <br />Project Name: Penske Truck Leasing/Servicing <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Prepared By: Thad Newport Date: 7/9/2020 <br />Outside City Limits? No *Adds a 25% Surcharge <br />Supportive Housing Credit? No *Reduces by 80% <br />lReviewed By: Sabrina Fandler Date: 7/9/2020 <br />Fee Calculations: <br />Water & Sewer System Development Fees: <br />Domestic Meter: Fee Calculation (Before Credit): <br />Credit Calculations (Up to 3 meters for Meter -Based Calculation or 3 previous building uses for Administrative Guidelines -Based Calculation): <br />*Subject to Administrative Guidelines Proposed Building Use: <br />Office Previous Bldg Use #1: No Other Use Previous Bldg Use #2: No Other Use <br />Previous Bldg Use #3: <br />No Other Use <br />ProposedUnit Measure: <br />14,500 Sq. Ft. Unit Measure for Use #1: - None Unit Measure for Use #2: - None <br />Unit Measure for Use #3: <br />- None <br />Note: Meter Size Used for Proposed Meter Size: <br />2" Credited Meter #1 Size: None Credited Meter #2 Size: None <br />Credited Meter #3 Size: <br />None <br />Calculation Water Fee: <br />$21,702.00 Water Credit #1: $0.00 Water Credit #2: $0.00 <br />Water Credit #3: <br />$0.00 <br />Sewer Fee: <br />$28,086.00 Sewer Credit #1: $0.00 Sewer Credit #2: $0.00 <br />Sewer Credit #3: <br />$0.00 <br />Total Fees Due: Add to Utility <br />Permit for Domestic Meter <br />$21,702.00 <br />This fee reflects credit for existing water meter <br />Permit #: U Water Sys Dev Fee Total: <br />$28,086.00 <br />This fee reflects credit for existing water meter <br />Sewer Sys Dev Fee Total: <br />Total: <br />$49, 788.00 <br />Irrigation Meter: Fee Calculation (Before Credit): <br />Credit Calculations: <br />Proposed Meter Size: <br />2"1 Credited Meter Size: None <br />Water Fee: <br />$21,702.00 Water Credit: $0.00 <br />No Sewer Fee: <br />$0.00 No Sewer Credit: $0.00 <br />Total Fees Due: Add to Utility Permit for Irrigation Meter <br />Permit #: U Water Sys Dev Fee Total: <br />$21,702.00 <br />This fee reflects credit for existing water meter <br />No Sewer Sys Dev Fee: <br />$0.00 <br />Irrigation meters are only subject to the water portion of system development fees <br />Total: <br />$21,702.00 <br />Fire Meter: Proposed Meter Size: <br />8" <br />For informational purposes only <br />Permit #: U No Sys Dev Fees: <br />$0.00 <br />1 Fire meters are not subject to system development fees <br />Stormwater System Development Fees: <br />Permit #: PW1909-078 Type of Construction: New Construction/Redevelopment <br />Square Feet of New Plus Replaced Hard Surfaces: <br />204,152 SF <br />Stormwater System Dev Fee: <br />$52,242.75 Add this fee to the Building Permit (or Public Works Permit if there is no building permit for the project) <br />