My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 RAILWAY AVE 2025-08-15
>
Address Records
>
RAILWAY AVE
>
2410
>
2410 RAILWAY AVE 2025-08-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 7:57:05 AM
Creation date
4/6/2023 12:02:49 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
642
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />PENSKE TRUCK LEASING EVERETT ONSITE IMPROVEMENTS <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN <br />Sitts & Hill Engineers, Inc. <br />Job Number 17,710 <br />BMP C101: Preserving Natural Vegetation <br />Purpose <br />The purpose of preserving natural vegetation is to reduce erosion wherever practicable. <br />Limiting site disturbance is the single most effective method for reducing erosion. For <br />example, conifers can hold up to about 50 percent of all rain that falls during a storm. Up <br />to 20-30 percent of this rain may never reach the ground but is taken up by the tree or <br />evaporates. Another benefit is that the rain held in the tree can be released slowly to the <br />ground after the storm. <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Conditions of Use <br />Natural vegetation should be preserved on steep slopes, near perennial and intermittent <br />watercourses or swales, and on building sites in wooded areas. <br />. As required by local governments. <br />. Phase construction to preserve natural vegetation on the project site for as long as <br />possible during the construction period. <br />Design and Installation Specifications <br />Natural vegetation can be preserved in natural clumps or as individual trees, shrubs and <br />vines. <br />The preservation of individual plants is more difficult because heavy equipment is gen- <br />erally used to remove unwanted vegetation. The points to remember when attempting to <br />save individual plants are: <br />. Is the plant worth saving? Consider the location, species, size, age, vigor, and the <br />work involved. Local governments may also have ordinances to save natural veget- <br />ation and trees. <br />. Fence or clearly mark areas around trees that are to be saved. It is preferable to <br />keep ground disturbance away from the trees at least as far out as the dripline. <br />Plants need protection from three kinds of injuries: <br />• Construcbon Equipment- This injury can be above or below the ground level. <br />Damage results from scarring, cutting of roots, and compaction of the soil. Placing <br />a fenced buffer zone around plants to be saved prior to construction can prevent <br />construction equipment injuries. <br />. Grade Changes - Changing the natural ground level will alter grades, which affects <br />the plant's ability to obtain the necessary air, water, and minerals. Minor fills usu- <br />ally do not cause problems although sensitivity between species does vary and <br />should be checked. Trees can typically tolerate fill of 6 inches or less. For shrubs <br />2014 Stormwater Management Manual for Western Washington <br />Volume 11- Chapter 4 - Page 266 <br />SITTS & HILL ENGINEERS, INC. 17 <br />TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.