Laserfiche WebLink
PENSKE TRUCK LEASING EVERETT ONSITE IMPROVEMENTS <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN <br />Sitts & Hill Engineers, Inc. <br />Job Number 17,710 <br />• Any quarry spalls that are loosened from the pad, which end up on the roadway <br />shall be removed immediately. <br />• If vehicles are entering or exiting the site at points other than the construction <br />entrance(s), fencing (see BMP C103) shall be installed to control traffic. <br />• Upon project completion and site stabilization, all construction accesses intended <br />as permanent access for maintenance shall be permanently stabilized. <br />2014 Stormwater Management Manual for Westem Washington <br />Volume II - Chapter 4 - Page 272 <br />SITTS & HILL ENGINEERS, INC. <br />TACOMA, WASHINGTON <br />22 <br />