My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 RAILWAY AVE 2025-08-15
>
Address Records
>
RAILWAY AVE
>
2410
>
2410 RAILWAY AVE 2025-08-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 7:57:05 AM
Creation date
4/6/2023 12:02:49 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
642
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />PENSKE TRUCK LEASING EVERETT ONSITE IMPROVEMENTS <br />CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN <br />Sitts & Hill Engineers, Inc. <br />Job Number 17,710 <br />manent stabilization measures (such as pavement, riprap, gabions, or geotextiles) <br />which will prevent erosion. <br />Design and Installation Specifications <br />Seed retention/detention ponds as required. <br />Install channels intended for vegetation before starting major earthwork and hydroseed <br />with a Bonded Fiber Matrix. For vegetated channels that will have high flows, install <br />erosion control blankets over hydroseed. Before allowing water to flow in vegetated <br />channels, establish 75 percent vegetation cover. If vegetated channels cannot be estab- <br />lished by seed before water flow; install sod in the channel bottom --over hydromulch <br />and erosion control blankets. <br />. Confirm the installation of all required surface water control measures to prevent <br />seed from washing away. <br />. Hydroseed applications shall include a minimum of 1,500 pounds per acre of <br />mulch with 3 percent tackifier. See BMP C121: Mulching (p.284) for specifications. <br />. Areas that will have seeding only and not landscaping may need compost or meal - <br />based mulch included in the hydroseed in order to establish vegetation. Re -install <br />native topsoil on the disturbed soil surface before application. <br />. When installing seed via hydroseeding operations, only about 1 /3 of the seed actu- <br />ally ends up in contact with the soil surface. This reduces the ability to establish a <br />good stand of grass quickly. To overcome this, consider increasing seed quantities <br />by up to 50 percent. <br />. Enhance vegetation establishment by dividing the hydromulch operation into two <br />phases: <br />1. Phase 1- Install all seed and fertilizer with 25-30 percent mulch and tackifier <br />onto soil in the first lift <br />2. Phase 2- Install the rest of the mulch and tackifier over the first lift <br />Or, enhance vegetation by: <br />1. Installing the mulch, seed, fertilizer, and tackifier in one lift. <br />2. Spread or blow straw over the top of the hydromulch at a rate of 800-1000 <br />pounds per acre. <br />3. Hold straw in place with a standard tackifier. <br />Both of these approaches will increase cost moderately but will greatly improve <br />and enhance vegetative establishment The increased cost may be offset by the <br />reduced need for <br />2014 Stonnwater Management Manual for Westem Washington <br />Volume II - Chapter 4 - Page 279 <br />SITTS & HILL ENGINEERS, INC. 29 <br />TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.