Laserfiche WebLink
lizi <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> PLUMB 02- <br /> 10/28/2022 10/28/2022 GROUND JASON APPROVAL see notes <br /> WORK/SLAB MORRISSEY <br /> Notes: <br /> 10/26/2022 9:17 PM PIPEX INC <br /> Contact Name:PIPEX INC <br /> Site Address:7825 EVERGREEN WAY <br /> Phone:4253094475 <br /> e-Mail:Info@pipexpro.com <br /> -Under slab DWV ok.Make sure to wrap pipe penetrations through concrete with approved foam wrap or a sleeve. <br /> 12/12/2022 12/12/2022 PLUMB 03-ROUGH JASON CORRECTION <br /> IN MORRISSEY REQUIRED see notes <br /> Notes: <br /> 12/10/2022 12:00 PM Hrach Voskanian <br /> Contact Name:Hrach Voskanian <br /> Site Address:7825 evergreen way,Everett wa 98203 <br /> Phone:2062341141 <br /> e-Mail:hrachv@gmail.com <br /> -Insulate all hot lines per UPC and WSEC 609.11 Insulation of Potable Water Piping 609.11.1 Insulation Requirements****Domestic hot water piping <br /> shall be insulated.-Confirm how recirc system is going to work especially in regards to hand wash sinks.Need hot water to fixtures in 30 seconds or <br /> less.-Confirm how water distribution system was sized.Which sizing chart in the UPC was used.Upsize water supply per UPC if needed.-Put waste <br /> system on test through the roof per chapter 7 UPC. <br /> 12/21/2022 12/21/2022 PLUMB 03-ROUGH JASON APPROVAL see notes <br /> IN MORRISSEY <br /> Notes: <br /> 12/20/2022 1:53 PM Hrach Voskanian <br /> Contact Name:Hrach Voskanian <br /> Site Address:7825 evergreen way ne <br /> Phone:2062341141 <br /> e-Mail:hrachv@gmail.com <br /> -Rough DWV and water piping ok.Partition wall,above grid and bathroom walls. <br /> 12/21/2022 12/21/2022 PLUMB 08-FINAL JASON CORRECTION see notes <br /> MORRISSEY REQUIRED <br /> Notes: <br /> -Replace non drainage fittings on front hand wash sink and vent below flood level on three compartment sink.UPC chap 7 and 9.-Install 3"branch line <br /> clean-out on drain for three compartment sink per UPC chap 7.-Make sure to plumb drain connections to grease interceptor per the manufacturers <br /> instructions with an indirect hub drain per the UPC and health department. <br /> 1 <br /> Printed:Thursday,23 March,2023 2 of 3 rk <br /> SUPERION <br />