Laserfiche WebLink
• <br /> 60 MIL TPO MECH. <br /> ATTACHED <br /> 0.5" HIGH DENSITY COVER_BOARD MECH. ATTACHED 4/////////////////////////// <br /> TWO LAYERS OF 3.1" <br /> POLYISOCYANURATE <br /> INSULATION <br /> NEW WOOD DECKING TO MATCH <br /> EXISTING. FASTEN 12" O.C. INTO-- EXISTING WOOD <br /> EACH CROSS SUPPORT DECKING <br /> P.T.2X6. INSTALL 2' O.C. ACROSS ° IW <br /> SHORT DIMENSION OF THE ° II <br /> OPENING AND PICTURE FRAME ° IN <br /> ON INTERIOR OF OPENING <br /> --1 ry <br /> METAL JOIST HANGER. FASTEN <br /> PER MANUFACTURERS <br /> RECOMMENDATIONSrAik <br /> EXISTING FRAMING <br /> NOTES: <br /> 1. REMOVE EXISTING CURB, FLASHING, AND CANT DOWN TO THE <br /> EXISTING DECKING. <br /> 2. PAINT THE NEW FRAMING AND DECKING TO MATCH THE EXISTING <br /> INTERIOR COLOR SCHEME PRIOR TO INSTALLATION. <br /> ce,clfied ©2022 Roof Management, Inc DWN JOB FRED MEYER STORE #95 TITLE 022-163 <br /> WBEN P.O. BOX 265 DLC ABANDONED CURB <br /> Womenl Business Enrrprur SECTIONS A—G <br /> 00 TM GOSHEN,1 KY 40026228-7298 DATE EVERETT, WA. DETAIL D — 9 <br /> MANAGEMENT,INC. (502) 1/11/2022 <br />