My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8530 EVERGREEN WAY FRED MEYER 2023-04-06
>
Address Records
>
EVERGREEN WAY
>
8530
>
FRED MEYER
>
8530 EVERGREEN WAY FRED MEYER 2023-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 1:49:16 PM
Creation date
4/6/2023 1:48:18 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8530
Tenant Name
FRED MEYER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOF PLAN NOTES: • <br /> 1. REMOVE & REPLACE ALL WOOD PIPING SUPPORTS WITH NEW DURA—BLOCK PIPING SUPPORTS WITH UNI—STRUT BEARING SURFACE OVER TPO WALK PADS. ALL RELATED PIPE <br /> STRAPS & FASTENERS TO BE INCLUDED FOR INSTALLATION. SPACING FOR SUPPORTS TO BE AS FOLLOWS FOR ELECTRICAL & PLUMBING SUPPLY LINES & CONDUITS: <br /> —6' O.C. FOR METAL CONDUITS & PVC(ELECTRICAL) & " & 1"(PLUMBING). <br /> —8' O.C. RIGID METAL(ELECTRICAL) & 1i" OR GREATER(PLUMBING). <br /> —4' O.C. 0.5"(PLUMBING). <br /> —12" O.C. FROM ANY DIRECTIONAL CHANGE & JUNCTION BOX. <br /> 2. THE ROOFING CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE RE—CALIBRATION OF SATELLITE DISHES CAUSED BY EQUIPMENT MOVES DURING CONSTRUCTION OR DAMAGE <br /> CAUSED DURING THE CONSTRUCTION PROJECT. REMOVE OBSOLETE SATELLITE EQUIPMENT UPON WRITTEN APPROVAL FROM FRED MEYER ENGINEERING. MIN. 7 DAY NOTICE IS <br /> REQUIRED PRIOR TO EQUIPMENT MOVES. <br /> 3. THE ROOFING CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIRED MECHANICAL AND ELECTRICAL MODIFICATIONS, DISCONNECTS AND RECONNECTS. REPLACE <br /> MISSING VENT COVERS, LIDS, OR CAPS ON HVAC EQUIPMENT. FLASHING HEIGHTS TO BE RAISED TO 8" MIN. <br /> 4. INSTALL NEW 2'X2'X1.5" CONCRETE 8,000 PSI DIAMOND TREAD PAVERS OVER HOT AIR WELDED TPO WALK PADS AT THE SIDE OF THE ROOF HATCH WITH THE GATE AND AT <br /> THE TOP AND BOTTOM OF ACCESS LADDERS. <br /> 5. INSTALL STAINLESS STEEL HARDWARE CLOTH SCREENS ON ALL PLUMBING VENTS. SECURE WITH S/S PIPE CLAMPS. EXTEND VENTS REQUIRED TO MIN. 12" REQUIREMENT. <br /> 6. INSTALL NEW 24 GAUGE TPO CLAD SHEET METAL SLEEVES AND 24 GA. PREF. GALV. STORM COLLARS AT HEAT VENT STACKS AND GOOSE NECK VENTS. SLEEVES ARE TO <br /> EXTEND 8" ABOVE THE FINISHED ROOF SURFACE & BE FULLY FIELD WRAPPED. CURBED VENT STACKS ARE TO BE FLASHED PER DETAIL D-8 AND RECEIVE NEW STORM <br /> COLLARS. <br /> 7. INSTALL HOT AIR WELDED TPO WALK PADS AROUND ALL MOTORIZED UNITS, AT ROOF DRAINING DOWNSPOUTS & IN THE LOCATIONS SHOWN ON THE ROOF PLAN. <br /> 8. INSTALL HOT AIR WELDED TPO WALK PADS UNDER SATELLITE DISH AND ANTENNA FRAMES. <br /> 9. SINGLE PENETRATIONS ARE TO BE FIELD WRAPPED & COVERED WITH NEW 24 GA. PREF. GALV. STORM COLLARS SEALED WITH POLYURETHANE CAULKING. <br /> 10. APPLY TWO COATS OF SAFETY YELLOW PAINT TO GAS LINES. DO NOT PAINT THE GAS LINE REGULATORS OR VALVES. <br /> 11. INSTALL THE FOLLOWING FIXFAST ITEM IN THE AREA SHOWN ON THE ROOF PLAN <br /> —TWO KATTGUARD NON—PENETRATING ROOF HATCH GUARDRAIL WITH GATES ON LADDER SIDE(FIELD VERIFY). <br /> —ONE KATTCLIMB RL22 ANGLED VERTICAL FIXED ALUMINUM LADDER POWDER COATED TO MATCH APPROVED SHEET METAL COLOR(FIRESTONE UNA—CLAD BONE WHITE) WITH <br /> PARAPET PLATFORM, WITH NON—PENETRATING WEIGHTED BASES OVER TPO WALK PADS AND REQUIRED ACCESSORIES TO CONNECT TO THE EXISTING LADDER. <br /> 12. INSTALL THE SPECIFIED WEATHER HEAD FLASHING AND REROUTE THE EXISTING CABLES/CONDUIT THROUGH THE NEW FLASHINGS. <br /> 13. EXTEND THE GAS LINE PENETRATIONS TO PROVIDE PROPER FLASHING OF THE PIPE BELOW THE COUPLING, AND PROPER PIPE ELEVATION FOR NEW SUPPORTS. <br /> 14. INSTALL 24 GA. PREF. GALV. CAP FLASHING TO REPLACE THE EXISTING AND MATCHING SHEET METAL CLADDING TO COVER THE WALL SUPPORT. <br /> 15. PROVIDE AND INSTALL ROOF PRODUCTS, INC. MODEL RPES-3 EQUIPMENT SUPPORT RAILS UNDER THE EXISTING UNITS/EQUIPMENT. FULLY FIELD FLASH OVER THE RAILS WITH <br /> THE SPECIFIED 60 MIL. TPO FLASHING. INCLUDE ALL WORK REQUIRED TO DISCONNECT AND RECONNECT THE EXISTING UNITS INCLUDING ALL ELECTRICAL AND MECHANICAL <br /> WORK. SCHEDULE WITH STORE OPERATIONS FOR DISCONNECTIONS AND DOWNTIME FOR THE EQUIPMENT. THE WORK IS TO INCLUDE ANY TEMPORARY EQUIPMENT TO MAINTAIN <br /> STORE OPERATIONS. <br /> 16. INSTALL TPO CLAD BOX CLOSURES FLASHED TO THE TPO WALL AND FIELD MEMBRANE OVER THE EXPOSED ANGLE IRON SUPPORTS. <br /> 17. INSTALL BASE TIE—IN, TPO FLASHING, AND TPO CLAD METAL EDGE FLASHING ALONG THE ROOF ELEVATION TRANSITION. FASTEN METAL FLASHING STAGGERED 3" O.C. <br /> 18. REMOVE ABANDONED CURBS & PENETRATIONS & PATCH ROOF PER DETAIL D-9. <br /> 19. INSTALL 0.5" IN 12" TAPERED POLYISOCYANURATE CRICKETS BEHIND ALL CURBS 24" & WIDER UNDER THE COVER BOARD LAYER. FLASHING HEIGHT SHALL BE ADDED TO <br /> ACCOUNT FOR THE CRICKET HEIGHT. 8" MIN. FLASHING HEIGHT REQUIRED. <br /> 20. INSTALL MANUFACTURER'S SAFETY YELLOW STRIP AT 6' FROM THE INTERIOR OF ANY PARAPET WALL LESS THAN 42" HIGH OR ANY OPEN PERIMETER WITH A 4' OR GREATER <br /> DROP. <br /> 21. ROOFING CONTRACTOR IS RESPONSIBLE FOR PROTECTING JOBSITE MATERIALS, PROPER EQUIPMENT & MATERIALS STORAGE IN THE APPROVED AREAS ONLY, AND USE OF A <br /> FLAGGER/SPOTTER FOR GROUND MOVING EQUIPMENT. <br /> certified ©2022 Roof Management, Inc DWN JOB FRED MEYER STORE #95 TITLE <br /> WBEN P.O. BOX 265 DLC ROOF PLAN NOTES <br /> «:omens 13„=,,,es,s,,,.•,�„s SECTIONS A—G <br /> oo TM GOSHEN, KY 40026 DATE EVERETT, WA. RMI #022- 163 <br /> MANAGEMENT,INC. (502) 228-7298 1/11/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.