Laserfiche WebLink
Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 1/17/2020 1/17/2020 ELEC 09-FINAL MIKE BEARDA CORRECTION <br /> REQUIRED <br /> Notes: <br /> Multiple breakers required for shared neutrals.Load calculation for panel. <br /> 1/27/2020 1/28/2020 ELEC 09-FINAL MIKE BEARDA CORRECTION <br /> REQUIRED <br /> Notes: <br /> AM Inspection requested <br /> (1/28/2020 10:40 AM MCB) <br /> Land neutral on bar.Load calculation still required. <br /> 2/26/2020 2/26/2020 ELEC 09-FINAL MIKE BEARDA CORRECTION <br /> REQUIRED <br /> Notes: <br /> Wire panel correctly <br /> 3/4/2020 3/4/2020 ELEC 09-FINAL MIKE BEARDA APPRVD PERMIT OK TO MOVE TO 4TH PER MB <br /> FINAL <br /> Notes: <br /> PM Inspection requested <br /> 3/4/2020 3/4/2020 ADMIN USE ONLY** KATHY COLLISON APPROVAL <br /> Notes: <br /> 4 <br /> Printed: Friday, 17 March, 2023 2 of 2 SUPERION <br />