GENERAL CONDITIONS FOR THE DIVISION 1 GENERAL REQUIREMENTS DIVISION 2 -SITE WORK DIVISION 3-CONCRETE DIVISION 5-METALS ]�
<br /> CONTRACT FOR CONSTRUCTION I.SCOPE 10.PROTECTION AND CLEAN-UP 1.DEMOLITION REFER TO STRUCTURAL DRAWINGS FOR CONCRETE SPECIFICATIONS OP EXA
<br /> ALL OF THE WORK UNDER EACH HEADING OF THESE SPECIFICATIONS SHALL BE THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER PROTECTION OF ADJACENT PROVIDE DEMOUTON AND REMOVAL OF STRUCTURES,PAVEMENT,SIDEWALKS,CURBS, 1.STEEL FRAMING ` TO
<br /> GOVERNED BY THE GENERALCONDITONS,SPECIAL PROVISIONS,THE DRAWINGS AND ITEMS AND SURFACES FROM DAMAGE RESULTING FROM THE FURMSHING OR ETC.AND THE CAPPING OFEXISTNG MITES.REMOVE ABOVE GRADE AND BELOW ARTICLE 1-GENERAL PROVISIONS THE SPECIFICATIONS,AS WELL AS THE FOLLOWING GENERAL REQUIREMENTS INSTALLATION OF HIS WORK AND SHALL PROMPTLY REPLACE,ATHES OWN COST,SUCH GRADE IMPROVEMENTS AND REMOVE GROWTH AND VEGETATION ATTHE SITE. DIVISION 4-MASONRY REFERENCE STRUCTURAL DRAWINGS FOR STEEL FRAMING SPECIFICATIONS ir (111) tit
<br /> DAMAGED WORK HE SHALL ALSO BE RESPONSIBLE FOR THE PROPER PROTECTION OF •A
<br /> 1.THE STANDARD FORM OF GENERAL CONDITIONS,CURRENT EDITION OF THE THE WORK UNDER EACH HEADING OF THESE SPECIFICATIONS SHALL INCLUDE ALL LABOR, HIS AND OTHERS WORK FROM DAMAGE BY ANY INCLUDING FREEZING OR OVERHEATING. COMPLY WITH ALL APPLICABLE CODES,ORDINANCES,REGULATIONS AND STANDARDS.IN 1.GENERAL NOTES 2.MISCELLANEOUS METALS
<br /> AMERICAN INSTITUTE OFARCHITECTS,DOCUMENT NO.A-201,ARE HEREBY MADE MATERIAL,EQUIPMENT AND SERVICES NECESSARY FOR AND SAID HEADING AS INDICATED USE PLASTIC COVERING OVER FURNITURE,DISPLAY CASES,EQUIPMENT AND FINISHES, CASE OFCONFUCT THE MORE STRINGENT REQUIREMENT SHALL GOVERN.
<br /> A PART OF THESE SPECIFICATIONS AND SHALL APPLY THE SAME AS IF REPEATED ON THE DRAWINGS,SET FORTH IN THESPECIRCARONS,OR OTHERWISE REQUIRED. THE CONTRACTOR SHAD.REMOVE ALL DEBRIS FROM THE PREMISES ON A DAILY BASIS; ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE REQUIREMENTS OF ALL CUSTOM FABRICATE FERROUS METAL ITEMS 16 GAUGE AND HEAVER REFER TO
<br /> HERE IN FULL COPIES OF SAME SHALL BE ON FILE AT THE OFFICE OF THE ALL DUST AND CONSTRUCTION DEBRIS ARE TO BE REMOVED.ANY BROKEN,DAMAGED, SCHEDULE AND EXECUTE ALL WORK IN A CAREFUL MANNER WITH ALLCONSWERARON LOCAL CODES AND STANDARDS. DRAWINGS AND DETAILS.
<br /> ARCHITECT. WORT(DONE HEREUNDER INCLUDES FURNISHING ALL LABOR,MATERIAL SERVICES,AND MARRED,UNCLEAN,OR OTHERWISE IMPERFECT WORK SHALL BE CORRECTED BY THE FOR NEIGHBORS AND THE PUBUC TO PREVENT INJURY TO PERSONS OR PROPERTY. /t��
<br /> 2.ALL INTERESTED PARTIES SHALL BE GOVERNED BY THOSE GENERAL EQUIPMENT NECESSARY AND/OR INCIDENTAL TO PERFORM ALL WORK THROUGH THE CONTRACTOR BEFORE HIS WORK SHALL BE CONSIDERED COMPLETE USE DUST CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDmONS ON THE JOB SITE AND 3,METAL STUDS _7
<br /> PROPERCOMPLETIONOFALLWORKAS MAY BE FURTHER SPECIFIED AND/OR SHOWN ON BARRIERS. PRIOR TO ALLDEMOLTTON WORK CAREFULLY INSPECT THE ENTIRE SITE AND ALL REPORT ANY ERRORS,OMISSIONS,CR POSSIBLE DISCREPANCIES TO THE ARCHITECT _i
<br /> CONDITIONS IN ALL MATTERS PERTAINING TO THIS PROJECT,DURING THE THE PUNS,OR OTHERWISE REQUIRED. OBJECTS TO BEDEMOUSHEDANO/OR LEFT INTACT AND DETERMINE AN ORDERLY AND PANDA EXPRESS PRIOR TO COMMENCING ANY WORK SPECIAL CARE SHALL BE GIVEN , i`_
<br /> PERIOD OF CONSTRUCTION,AND PARTICIPATION N THE PROJECT WILL BE UPON COMPLETION OF THE WORK CONTRACTOR SHALL CLEAN INTERIOR AND EXTERIOR SEQUENCE FOR THEDEMOLEON.LOCATE ALL EXISTING UDUEYUNES AND DETERMNE TO THE SITEAND BUILDING LAYOUT THEREON. INSTALL METAL FRAMING SYSTEMS IN ACCORDANCE WITH MANUFACTURERS PRINTED OR
<br /> CONSIDERED PRESUMPTIVE EVIDENCE OF THEPARTCIPANTS FULL 2.CONFLICTS BETWEEN DOCUMENTS OF ALL GLASS AND GLAZING,FLOORS,WALLS ANDCDUNG SURFACES,ELECTRICAL THE REQUIREMENTS FOR DISCONNECTION AND CAPPING.LOCATE ALL ACTIVE UOLITY WRITTEN INSTRUCTIONS AND RECOMMENDATIONS,UNLESS OTHERWISE INDICATED. �SE K��
<br /> UNDERSTANDING OF,AND AGREEMENT WITH,THE CONDITIONS OF THE FIXTURES,MECHANICAL EQUIPMENT,ETC.;IT IS NECESSARY TO REMOVE ALL DIRT, UNES TRAVERSING THE SITEAND DETERMINE THE REQUIREMENTS FOR PROTECTION. INSTALL CONTINUOUS TRACK-SEED TO MATCH STUDS.SECURE TRACKS AS
<br /> REFERENCED GENERAL CONDITIONS. IN CASE OF CONFLICT BETWEEN DRAWINGS AND SPECIFICATIONS THE CONTRACTOR WILL STAINS,AND MARKS.THE SIGNS,GLASS AND WOOD SHALL BE CLEANED AND POLISHED. - THE CONTRACTOR SHALL PROVIDE SAFE AND ADEQUATE BRACES AND CONNECTIONS TO RECOMMENDED BY STUD MANUFACTURER FOR'TYPE OF CONSTRIUCTSSNINVOLVED.
<br /> SUPPORT THE COMPONENT PARTS OF THE STRUCTURE VOL THE STRUCTURE ITSELF
<br /> BE DEEMED TO HAVE ESTIMATED ON,AND AGREED TO PROVIDE,THE GREATEST THE STORE SHALL BE MADE CLEANAND FIT FOR IMMEDIATE OCCUPANCY BY AN PROTECTION:THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR PROTECTION OF (INCLUDING THE FLOOR AND ROOFDIAPHRAGMS)SCOMPLETE ENOUGH TO ADEQUATELY
<br /> 3.THE GENERAL CONDITIONS,SPECIAL PROVISIONS,GENERAL REQUIREMENTS, QUA4TTYAND BETTER W ULS QUALITY M4TER AND WORK INDEPENDENT CLEANING AGENT,WITH THE APPROVAL OF PANDA EXPRESS,AT THE EXISTING BUILDINGS,SURRWNDINGPROP ERtt AND ALL PERSONS.THE CONTRACTOR SUPPORT ITSELF.
<br /> SET STUDS PLUMB,EXCEPT AS NEEDED FOR DIAGONAL BRACING OR REQUIRED FOR PANDA RESTAURANT GROUP INC.
<br /> AND TECHNICAL SPECIFICATIONS,ALONG WITH THE OTHER CONDITIONS WHICH CONTRACTOR'S EXPENSE. SHALL ALSO PROVIDE ALL SHORING,TEMPORARY BARRICADES AND TEMPORARY NONPLUMB WALLS OR WARPED SURFACES. 1683 Walnut Grove Ave.
<br /> FOLLOW,AND AS PROVIDED,AS WELL AS ALL APPLICABLE PROVISIONS OF THE INCLUDE GENERAL CONSTRUCTION,ELECTRICAL,PLUMBING,HVAC,AND INSTALLATION OF ENCLOSURES AS NECESSARY TO PROTECT ADJACENT PROPERTY FROMDAAAGE.
<br /> SPECIFICATIONS,FORM A PART OF THE CONTRACT AND SHALL GOVERN EACH ALL SUCH WORK EXCEPT AS HEREINAFTER MAY BE REQUIRED. GENERAL CONTRACTOR SHALL SUPERVISE AND SCHEDULE PROPER INSTALLATION OF ALL OPTIONS,IFPRONDED HEREIN,ARE NOTED FOR CONTRACTORS CONVENIENCE HE Rosemead,California
<br /> CONTRACTOR ENGAGED IN WORK ON THE PROJECT WHETHER THEWORK BE PARTS OF WORK PERTAINING TO A FINISHED PRODUCT BY HIM OR BRINE OWNER. TAKE ALL MEANS NECESSARY TO PREVENT THE SPREAD OF DUST DURING DEMOLITION SHALL BE RESPONSIBLE FOR ALL CHANGES NECESSARY,SHALL COORDINATE ALL INSTALL SUPPLEMENTARY FRAMING,BLOCKING AND BRACING IN METAL FRAMING SYSTEM 91770
<br /> LET UNDER SEPARATE CONTRACTS OR UNDER A SINGLE CONTRACT. aITEMS FURNISHED BY PANDA AND INSTALLED BY GENERAL CONTRACTOR OPERATIONS.THOROUGHLY MOAMENAR GROUND SURFACES AS OFTEN AS REQUIRED DETAILS,AND SHALL OBTAIN ALL REQUIRED APPROVALS WHENEVER WALL OR PARTITIONS ARE INDICATED TO SUPPORT FIXTURES,EQUIPMENT,
<br /> GENERAL CONTRACTORSRWLL SUPERVISE AND SCHEDULE PROPER INSTALLATION OF ALL TO PREVENT DUST BEING A NUISANCE TO THE PUBUC,NEIGHBORS AND THE SERVICES,CASEWORK,HEAVY TRIM AND FURNISHINGS AND SIMILAR WORK Telephone:626.799.9896
<br /> 4.BASIC DEFINITIONS: T SHALL BE THE CONTRACTORS SOLE RESPONSIBILITY TO RECEIVE,CHECK AND PARTS OF WORK PERTAINING TO ARNISHED PRODUCT BY CONTRACTOR, CONCURRENTPERFORMAN'CE OF OTHER WORK ON THE SITE ARCM-ONCOSTS OF ADDITIONAL DESIGN WORK NECESSITATED BY SELECTION OF ARCM-ON OR FaDsimlle:626.372.8288
<br /> THE CONTRACT DOCUMENTS CONSIST OF THE AGREEMENT BETWEEN OWNER CONRRM THE ARRWAL IN 000D ORDER,OF All ITEMS CALLED FOR TO BE FURNISHED BY SUBCONTRACTORS OR PANDA EXPRESS. DUE TO ERRORS OR OMISSIONS IN CONSTRUCTION,SHALL BE BORNE BY THE SECURE STUDS TO TOP AND BOTTOM RUNNER TRACKS BY BITER WELDING OR SCREW
<br /> AND CONTRACTOR,CONDITIONS OF THE CONTRACT AND ALL DOCUMENTS PANDAEJPRESS AND INSTALLED BY TIE CONRIACTOR. PRESERVE IN OPERATNGCONDMON ALL ACTIVE CRIMES TRAVERSING THE SITE AND CONTRACTOR. FASTENING AT BOTH INSIDE AND OUTSIDE FLANGES.
<br /> LISTED BELOW. II.GUARANTEE WARRANTY REQUIRED FOR FUTURE OPERATOR OF THE NEW STORE AND SURROUNDING
<br /> THE CONTRACTOR SHALL NOTIFY PANDAIXPRESS(IN WRING)OF ANY SUCH ITEMS PROPERTIES 2.MANUFACTURED MASONRY VENEER INSTALL HORIZONTAL STIFFENERS IN STUD SYSTEM AS REQUIRED,SPACE(VERTICAL All ideas,designs,arrangement and plans indicated or
<br /> THE CONTRACT DOCUMENTS SHALL INCLUDE:DRAWINGS AS LISTED IN THE MSSINGOR DAMAGED WITHIN 3 DAYS OFRECEMNG DATE FAILURE TO SO NOTIFY THE CONTRACTOR SHALL GUARANTEE THE WORK TO BE FREE FROM DEFECTS OF DISTANCE)AT NO MORE THAN4',6.O.C. represented by M'sWaving are the property of Panda
<br /> INDEX OF THIS SET.SPECIFICATION DIVISION 1-16 INCLUSNE.ALL MODIFICATIONS PANDA EXPRESS WILL BE CONSIDERED PROOF PRESUMPTIVE THAT ALL SAID RENTS HAVE MATERIALS OR WORKMANSHIP,INCLUDING DISCOLORATION,RATTING AND LEAKING,FOR COORDINATE DISCONNECTING,REMOVING,PLUGGING,ABANDONING AND RELOCATING Express Inc.and teem created for use on this specific project
<br /> ISSUED AFTER EXECUTION OF THE CONTRACT.EQUIPMENT INSTALLATION HAND ARRNED UNDAMAGED,AND IN THE PROPER QUARRIES,AND IT SHALL THEN BE THE A PERIOD OF ONE YEAR FROM TIE DATE OFRNAL PAYMENT.APPLICATION BY THE MIUTESWITH LOCAL UTILITY COMPANIES OR OTHER GOVERNING AGENCIES. IN'CLUDESPORTUND CEMENT BASED MANUFACTURED STONE VENEER AND TRIM. None of these ideas,designs,errangemenls or plans may be
<br /> BOOK. CONTRACTOR'S RESPONSIBILITY(AT HIS OWN COST)TO PROMPTY REORDER,REPLACE CONTRACTOR FOR FINAL PAYMENT SHALL BE CONSIDERED AS PRESUMPTNE EVIDENCE 4.EXTERIOR AWMNUM AWNINGS used disclosed to an use by y person,firm,or corporation
<br /> AND/OR REPAIR ANY SUCH ITEMS NEEDED FOR THE PROPER COMPLETION OFHES OF HIS FULL UNDERSTANDING OF AND AGREEMENT WITH CONDITIONS OF THE ASBESTOS ABATEMENT:REFER TO ASBESTOS CONTAINING MATERIAL(ACM)REPORT FOR COMPLY MTH ALL STANDARDS REFERENCED BY TIEMINUFACTURER COMPLY WDHALL Without Mewriten permission of Panda Express Inc.
<br /> 5.PHRASES USED IN THE SPECIFICATIONS ARE DEFINED AS FOLLOWS: PROJECT,ON THE AGREED TO DATE OF COMPLETION. GUARANTEE PROVISION,AND HE SHALL REMOVE AND REPLACE WITH NEW,AT HIS OWN COMPLETE DESCRIPTION OF MATERIALS IDENTIFIED.THE CONTRACTOR SHALL COMPLY APPLICABLE BUILDING CODES.
<br /> HAS SHOWN-AS SHOWN ON THE ACCOMPANYING DRAWINGS. EXPENSE ALL SUCH WORK OR MATERIALS FOUND BYPANDADPRESS'S WITH ALL LOCAL,STATE AND FEDERAL RULES AND REGULATIONS FOR THE PROPER
<br /> 4.MEASUREMENTS REPRESENTATNE TO BEDEFECTNE WITHIN THE GUARANTEE PERIOD. PROTECTION,REMOVAL AND DISPOSAL OF ANY ASBESTOSCONTRMNG MATERIAL SUBMIITALS:SUBMIT MANUFACTURER'S PRODUCT BATAAN°VERIFICATION SAMPLES OF
<br /> 'PROVIDE'-PROWDEAND INSTALL COMPLETE,WITH ALL NECESSARY ACCESSORIES AND THE SELECTED STONE AND MORTAR MATERIALS AS SELECTED BY PANDA
<br /> INCIDENTAL MATERIALS AND SUPPLIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AN ACCURATE TAKING OF JOB 12 SUBCONTRACTORS POLLUTION CONTROL TIE CONTRACTOR IS RESPONSIBLE FOR ENSURING TRUCKS REVISIONS:
<br /> SITE MEASUREMENTS,VERIFYING SAME,AND PROMPTLY FURNISHING EXACT JOB LEAVING AND ENTERING THE SITE DO NOT DROP DEMOLITION DEBRIS OR DIRT ONTO WARRANTIES:SUBMTMANUFACTURERSAND INSTALLER'S WARRANTIES UPON"PROVIDED BY OWNER,MATERIALS OR GOODS WILL BEDELNERED F.O.B.JDBSITE BY SITE MEASUREMENTS TO ALL PARTIESREQINRING SAME.CONTRACTOR MUST THE CONTRACTOR AGREES THAT HE IS FULLY RESPONSIBLE TO THE OWNER FOR THE PUBUC STREETS. WARRANTIES:
<br /> SUBITMANUFACTURE SAND INSTALER'S WARANTESAPONND
<br /> THE OWNER AT NO EXPENSE TO THE GENERAL CONTRACTOR.UNLOADING,STORAGE, NOTIFY PANDA EXPRESS AND THE ARCHITECT OF ANY DISCREPANCIES ACTS AND OMISSIONS OF HIS SUBCONTRACTORS AND OF PERSONS DIRECTLY EMPLOYED COMPLETION
<br /> FTHE
<br /> HEJOA.AFTER ACCEPTANCESHALL CVE PANDA IN
<br /> LIM
<br /> INSTALLATION,AND/OR ASSEMBLY OF ITEMS'PROVIDED BY OWNER'SHALL BE BY IMMEDIATELY.THE CONTRACTOR SHALL CHECK SALES CASEWORK SHOP BY HIM.NOTHING CONTAINED IN THE CONTRACT DOCUMENTS SHALL CREATE ANY THE CONTRACTOR IS RESPONSIBLE FOR THE PREVENTION OF SOIL EROSION AND SILT
<br /> GENERAL CONTRACTOR UNLESS OTHERWISE NOTED. DRAWINGS A$TO CORRECT ANGLES AND FIT TO THE EXISTING SPACE AS CONTRACTUAL RELATION BETWEEN ANY SUBCONTRACTOR AND PANDA EXPRESS.THE FROM LEAVING THE SIRE.
<br /> 'INSTALL'-INSTALL ITEMS,COMPLETE,PROVIDING ALL INCIDENTAL AND NECESSARY SHOWN.THE CONTRACTOR SHALL PERMANENTLY LAYOUT THE CASEWORK ON CONTRACTOR SHALL COOPERATE WITH PANDA AND OTHER CONDUCTORS PERFORMING QUALITY ASSURANCE:
<br /> SUPPLIES AND MATERIALS. THE FLOOR PRIOR TO THE CONSTRUCTION OF WALL,CEILING,LIGHT FIXTURES, WORK UNDER SEPARATE CONTRACTS TO ENSURE PROJECT PROGRESS ACCORDING TO RWNG EASEMENTS 8 VOIDS:COMPLETELY FILL BELOW GRADE AREA AND VOIDS INSTALLERQUAOFICATONS:EXPERIENCED MASON FAM5UAR WITH INSTALLATION
<br /> ETC. SCHEDULE.THE CONTRACTOR SHALL COORDINATEWORKFORTHE VARIOUS TRADES RESULTING FROM THE DEMOLITION OF THE STRUCTURE ANDURURES. PROCEDURES FOR MANUFACTURED VENEER.CERTIFICATIONS REQUIRED PER
<br /> 'GENERAL CONTRACTOR'.THE GENERAL CONTACTOR OR ANY OR ALL OF HIS VARIOUS INCLUDING PANDA EOPRESS'SVENDORS. MANUFACTURERS STANDARDS.
<br /> SUBCONTRACTORS. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS, REFER TO THE GEO-TECHNICAL REPORT FOR TILL MATERIAL AND PLACEMENT METHODS.
<br /> LARGER SCALE DRAWINGS SHALL TAKE PRECEDENCE OVER SMALLER SCALE 13.TEMPORARY FACILITIES PUCE FILL,COMPACT AND GRADE THE SURFACE TO MEET ADJACENT GRADES AND AS MANUFACTURER
<br /> 'OWNER'-ALL GENERAL CONDITIONS REFERENCES TO'OWNER.SWILL REFER TO PANDA DRAWINGS, SHOWN ON THE DRAWINGS. REFERENCE'EXTERIOR FINISH SCHEDULE'SHEETG005
<br /> EXPRESS,INC. PROVIDE AND COMPLETE ALL PRELIMINARY WORK AND TEMPORARY CONSTRUCTION
<br /> S.SUBSTITUTIONS REQUIRED AS INDICATED AND REQUIRED DISPOSAL OF DEMOLISHED MARERNLS
<br /> 'CONTRACTOR"AND-GENERAL CONTRACTOR'AS STATED IN THESE DOCUMENTS REFER A REMOVE FROM SITE AND LEGALLY DISPOSE ALL RUBBISH,DEBRIS AND ALL MATERIALS STONE VENEER TYPE AND FINISH: ISSUE DATE:
<br /> TO THE SAME ENTRY. BIDDERS MAY OFFER SUBSTITUTIONS FOR ANY ITEM SPECIFICATION BY TEMPORARY BARRICADES: RESULTING FROM THEDEMOLIT1ON OPERATIONS. REFERENCE'EXTERIOR FINISH SCHEDULE'SHEETG{g5
<br /> SUBMITTING IN WRITING AS OUTLINED IN SPACE PROVIDED ON PROPOSAL FORM. INSTALL TEMPORARY BARRICADE AS REQUIRED BY CITY OFFICIALS OR MALL _
<br /> ARTICLE 2-INSURANCE MANAGEMENTIN MANNER STIPULATED BY SAME 2 EARTHWORK MORTAR MORTAR ALL JOINTS.USE MORTAR COMPLYING WITH ASTM STANDARDS:
<br /> IT SHALL BE UNDERSTOOD BY ALL HEREIN CONCERNED THAT ANY PROPOSAL CEMENT ASTM C270;UME ASTM C207;SAND ASTM CIA:WATER SHALL BE POTABLE.
<br /> THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE REQUIRED TO OBTAIN THE SUBSTITUTION SHALL HAVE THE WRITTEN APPROVAL OF ARCHITECTANUIOR LIGHT AND POWER SHALL BE PROVIDED BY ELECTRICAL CONTRACTOR OR REUSE LOCATE EXISTING UNDERGROUND UTUTIES BY CAREFUL HAND EXCAVATION PREPACKAGED LATEX PORTLAND CEMENT MORTAR SHALL COMPLY WITH ANSI A11B.4.
<br /> FOLLOWING INSURANCES,AND AT THEIR REQUEST FURNISH EVIDENCE TO PANDA OWNER'S REPRESENTATIVE,BEFORE BEING USED BY CONTRACTOR,OTHERWISE EXISTING FROM LOCATION OF LANDLORD'S SERVICE AND PAY ALL COST FOR SAME,FOR BEFORE STARTING EARTHWORK OPERATIONS.IF UTILITIES ARE TO REMAIN IN
<br /> EXPRESS.ALL INSURANCE SHALL NAME PANDA RESTAURANT GROUP,INC.,AND THE IT WILL BE ASSUMED THAT THE CONTRACTOR'S TOTAL BID S BASED UPON THE ALL CONTRACTORS)TO SUBJECT SPACE. PLACE,PROVIDE PROTECTION FROM DAMAGE DURING CONSTRUCTION PROVIDE COLORED MORTAR ASSELECTED BY PANDA COLOR FIGMENT SHALL COMPLY
<br /> ARCHTECTS.ASAGRITONAL INSURED PARTIES. MATERIAL OR ITEM OF EQUIPMENT SPECIFIED, OPERATIONS.CONTACT LOCAL UTILITY COMPANY FOR INFORMATION REGARDING WITH ASTM C970,MINERAL OXIDE PIGMENTS.
<br /> WATER SUPPLY: UNDERGROUND UTILITIES.
<br /> 111J1===
<br /> WORKMAN'S COMPENSATION INSURANCE IN ACCORDANCE WITH THE LAWS OF THE STATE S.EXAMINATION OF SITE AND BUILDING THE CONTRACTORSFWI MAKE ALL NECESSARY ARRANGEMENTS FOR PERMANENT
<br /> IN WHICH THE PROPERTY IS LOCATED AND PANDA EXPRESS REQUIREMENTS.PANDA WATER SERVICE WATER METER,AND PRESSURE REGULATOR FORALL PURPOSES OF SHOULD UNCHARTED OR INCORRECTLY CHARTED PIPING OR OTHER UTILITIES BE EXECUTION:PREPARE SUBSTRATE IN ACCORDANCE WITH MANUFACTURER'S
<br /> EXPRESS SHALL KEEP A COPY IN FILE ALL TIME BEFORE SUBMITTING A PROPOSAL,EACH BIDDER SHALL EXAMINE ALL DOCUMENTS,VISIT CONSTRUCTION,PAYING ALL COSTS IN CONNECTONWITHSRME,AND FOR ALL WATER ENCOUNTERED DURINGEXCAVATON,CONSULT THE OWNERIMMEDMTELY FOR INSTALLATION INSTRUCTIONS.
<br /> THE SITE,VERIFYING ANY SPECIAL CHARGES OR REQUIREMENTS,COMPARING EACH TO USED.THIS SHALLINCWDE ALL MEANS OF CONVEYING SAME TO PLACE WHERE °RECTONS AS TO PROCEDURES.REPAIR DAMAGED UTILITIES TO THE SATISFACTION OF
<br /> COMPREHENSNE GENERALUABILRY INSURANCE INCLUDING CONTACTUALLUBIUTY THE OTHER AND INFORMING THEMSELVES OF ALL CONDITIONS UNDER WHICH WORK S TO REQUIRED. THEURUTY OWNER.COOPERATE WITH THE OWNER AND PUBUC AND PRNATE UTILITY EXAMINE SUBSTRATES UPON WHICH WORK WILL BE INSTALLED.COORDINATE WITH
<br /> WITH LIMITS SET FORTH BY THE PANDA EXPRESS. BE PERFORMED.INCLUDE ALL RELEVANT MATTERS WHICH MAY AFFECT THE WORK OR COMPANIES IN KEEPING SERVICES AND FACILITIES IN OPERATION GENERA CONTRACTOR TO REMEDY ANY UNSATISFACTORY SUBSTRATES.NOTIFY PANDA DRAWN BY:
<br /> THE BIDDING.EACH BIDDER SHALL BASE MS PROPOSAL ON MATERIAL,METHODS ANDIOR ELECTRICITY: EXPRESS IN WRITING OF ANY UNSATISFACTORY SUBSTRATES.COMMENCEMENT OF
<br /> AUTOMOBILE MISERY INSURANCE INCWDING CONTRACTUAL URBNTY AS SET FORTH BY EQUIPMENT COMPLYINGWIM THE SPECIFICATIONS AND DRAWINGS. THE CONTRACTOR SHALL MAKE ALL NECESSARY APPLICATIONS,PAY ALL DUES AND BARRICADE OPEN EXCAVATION AND POST WITH WARNING UGHTS FOR THE SAFETY OF WORK BY THE INSTALLER SHALL INDICATE HIS ACCEPTANCE OF THE SUBSTRATE
<br /> THE PANDA EXPRESS. CHARGES,OBTAIN NECESSARY PERMITS,PROVIDE AND MAINTAIN ELECTRICAL ENERGY PERSONS,OPERATING WARNING LIGHT DURING HOURS OF DUSK TO DAWN EACH DAY.
<br /> THE WORDS'THE CONTRACTOR SHALL'ARE INTENTIONALLY OMITTED FROM THE FROM DEVELOPERS PERMANENT ELECTRICAL FACIUTES FORUGMNG,POWER FOR AU. INSTALL ALL WORK IN CONFORMANCE WITH THE MVMA(MASONRY VENEER
<br /> BUILDER'S RISK INSURANCE IN RE AMOUNT OF THE ESTIMATED COST OF THE PROJECT. SPECIFICATIONS.WHERE DIRECTIONS OR INSTRUCTIONS ARE STATED,WITHOUT ELECTRIC TOOLS AND EQUIPMENT REQUIRED IN CONSTRUCTION OF ALL BRANCHES OF PROTECT STRUCTURE,UTILILIES,SMEWAJJ(S,PAVEMENTS,AND OTHER FACILITIES MANUFACTURERS ASSOCIATION)INSTALLATION GUIDE FOR ADHERED CONCRETE PANDA PROJECT#: 1291
<br /> SPECIFIC REFERENCE AS TO WHO S RESPONSIBLE,THE INFERENCE IS INTENDED TO BE THE WORK AND PAY FOR ALL CURRENT USED. IMMEDIATELY ADJACENT TO EXCAVATIONS.FROM DAMAGES CAUSED BY SETTLEMENT, MASONRY VENEER'.
<br /> THE CONTRACTOR AGREES TO INDEMNIFY AND SAVE HARMLESS PANDA EXPRESS,ITS THE CONTRACTOR FOR THE WORK IN THE SPECIFICATION SECTION IN WHICH THE LATERAL MOVEMENT,UNDERMINING.WASHOUT AND OTHER HAZARDS. ARCH PROJECT#:
<br /> AGENTS,SERVANTS,AND EMPLOYEES,AND THE OWNERS ARCHITECT AND ENGINEER DIRECTIONS OR INSTRUCTIONS ARE INTENDED. FIRE PROTECTION:
<br /> FROM AND AGAINST ANY AND ALL LABILITY OR DAMAGE TO PROPERTY OCCASIONED BY OWNER'S CONTRACTOR SHALL PROVIDE FIRESXRNGUISHERS WITHIN THE PREMISES AS ALL ELL AND BACK FILL SHALL BE SELECTED FILL MATERIAL COMPACTED AS NOTED IN PROTECT ADJACENT WORK FROM CONTACT WITH MORTAR
<br /> ANY ACT OR OMISSION OF THE CONTRACTOR,HIS SUBCONTRACTORS,SERVANTS,OR 7.CODES AND STANDARDS REQUIRED BY CODE AND/OR INSURANCE COMPANIES,OR VERIFY THAT ONE S EXISTING IN THE SOILS REPORT.GRADING PLAN AND EARTHWORK SPECIFICATIONS SHALL USE
<br /> EMPLOYEES,INCLUDNG ANY AND ALL EXPENSE,LEGAL OR OTHERWISE.WHICH MAY BE THE CASE OF REMODELING.DISCONNECT AND SEAL MURES SERVING STRUCTURE TO NONIXPANSION FILL MATERIALAT BUILDING AREA AND UNDER WALKS.ALLCOMPACTION INSTALL AND CLEAN STONE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS FOR
<br /> INCURRED BY PANDA EXPRESS,TTSAGENTS SERVANTS,OR EMPLOYEES IN THE DEFENSE ALL WORK,MATERIALS AND INSTALLATION SHALL BE IN STRICT ACCORDANCE WITH ALL BEDEMOUSHED.PRIOR TO START OFDEMOUTON WORK SHALL BE SUPERVISED AND CERTIRW BY LICENSED SOILSENGINEFRAND STANDARD GROUTED INSTALLATION.
<br /> OF ANY CLAIM.SETTLEMENT OR SUIT. ORDINANCES,STATE AND LOCAL BUILDING CODES,LATEST EDITION,OF THE AUTHORITIES CERTIFICATION REPORT SHALL BE SUBMITTED TO PANDA EXPRESS PRIOR TO PLACING OF
<br /> HAVING JURISDICTION. 14.STRICTLY PROHIBITED WORK AND PRACTICES CONCRETE. MANUFACTURER'S mELD SERVICE REPRESENTATNE SHALL MAKE ONE SITE VAR FOR
<br /> ARTICLE3 EXTRA WORK INSTALLATION INSPECTION AND CONSULTATION BEFORE MORE THAN 20%OFTHE GARY WANG
<br /> DESIGN LOADS:LOADS AND CODE RESTRICTIONS FOR ALL DESIGN CONSIDERATIONS INSTALLATION OF ANY COMBUSTIBLE MATERIALS ABOVE FINISHEDCHLINGS OR IN ANY 3.ASPHALT AND CONCRETE PAVING MATERIAL IS INSTALLED.
<br /> 'LAW AND ALL WORK WHICH IS PERFORMED BY RE CONTACTOR,OR BY ANY SHALL CONFORM TO THE LOCAL AND STATE CODES,AND ALL GOVERNING CODES. OTHER CONCEALED,NONSPRINKLERED SPACE k d &ASSOCIATES.INC.
<br /> SUBCONTRACTOR.WITHOUTHAGNG SPECIFIC APPROVAL FROM PANDA EXPRESS IN (REFER TO CIVIL DRAWINGS FOR SPECIFICATIONS)
<br /> WRITING,SHALL BE PERFORMED BY SAID CONTRACTOR AT HS OWN REK WITHOUT ANY &PERMITS IMPOSING ANY STRUCTURAL LOAD,TEMPORARY OR PERMANENT,ON ANY PART OF THE SEE GRADING AND PAVING PORTION OF SITE PREPARATION PROCEDURES ON THE SIRE a CONCRETE MASONRY UNITS(MAUI •
<br /> tone Corporate Center Dr.,Sulte 550
<br /> OBLIGATION OR RESPONSIBILITY OF PANDA EXPRESS OR ME ARCHITECT.ALL WORK WORK OR STRUCTURE WITHOUT APPROVAL AND/OR GRADING PLAN.
<br /> WHICH IS ABOVE AND BEYOND THE SCOPE OF THE DRAWINGS AND SPECIFICATIONS,OR THE CONTRACTOR SHALL BE RESPONSIBLE FOR THEPROPERAPPLICATON FOR AND REFER TO STRUCTURAL DRAWINGS FOR CONCRETE MASONRY UNITS EMU) Monterey Part,CA Bt]54
<br /> ANY PART OF THE CONSTRUCTION DOCUMENTS,MUST BE SPECIFICALLY AUTHORIZED BY SECURING OF ALL NECESSARY TRADE PERMITS,AS WELL AS THE OBSERVANCE OF ALL ATTAGNNGANY WORK TO METAL DECK OR HANGING FROM PLUMBING AND SPRINKLER MATERIALS: SPECIFICATIONS TEL:(626)268-6898 FAIT,(626)768-7101
<br /> PANDA EXPRESS INWRfING.ALL REQUESTS FOR ADDITIONAL PAYMENTS MUST BE APPLCABLE CRY,COUNTY,STALE AND FEDERAL LAWS,REGULATIONS OR ORDINANCES PIPING OR CONDUIT. 1)BASE COURSE:AS NOTED ON CIVIL DRAWINGS title://WwWennoxano.cam
<br /> APPROVED BY THE OWNER PRIOR TO THE START OF THAT WORK. AND SHALL INCWDE IN THEIR PROPOSAL COST OF SAME 2)PRIME COAT:MC850OR MC-70 PER ASPHALT INSTITUTE IPSTMD2027-76) —
<br /> 1&POLLUTION CONTROLS 3/SURFACE COAT:AS NOTED ONCML DRAWINGS
<br /> 2.THE FOLLOWING GENERAL REQUIREMENTS SUPPLEMENT AND/OR SUPERSEDE THE &INSTALLATION OF MATERIALS AND EQUPMENT 4)PAVEMENT MARKINGS,PARKING STALL STRIPES SHALL BE AS NOTED ON CML
<br /> FOREGOING GENERAL AND SUPPLEMENTARYCONDIONS FOR CONTRACT WORK AND USE WATER SPRINKLING,TEMPORARY ENCLOSURES,AND OTHERSURASLE METHODS TO DRAWINGS
<br /> ARE HEREBY CONSIDERED A PART OF THE CONTRACT DOCUMENTS. ATTENTION IS HEREBY DIRECTED TO THEFOLLOWINO REQUIREMENT FOR EACH PRIME UNIT DUST AND DIRT RISING AND SCATTERED IN AR TO LOWESTPRACTCAL LEVEL. 5)SEAL COAT:FOGSEAL BY KOPPERS COMPANY. ��
<br /> AND SUBCONTRACTOR:THAT THE APPLICATION OF A MATERIAL AND/OR EQUIPMENT REM COMPLY WITH GOVERNING REGULATIONSPERTAMNG TOHMRONMENTAL PROTECTION.
<br /> TO UNSATISFACTORY WORK INSTALLED BY OTHERS,CONSTITUTES ACCEPTANCE OF THAT DO NOT USE WATER WHEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS PROVIDE ALL ASPHALT AND CONCRETE WORK COMPLETE,AS SHOWN ON THE DRAWINGS
<br /> WORK AND ASSUMPTION OF FULL RESPONSIBILITY FOR PNIORTO STARTING THE SPECIFIC SUCH AS RE,FLOODNGAND POLLUTION HEREIN SPECIFIED,INCLUDING CONCRETE FORM WORK,REINFORCEMENT DOWELS AND ��
<br /> APPLICATION NOTIFY IN WRITING THEARCMTECTANDIOR OWNER'S REPRESENTATNE OF ACCESSORIES,CONCRETE MMED,PLACE,RNISHED AND CURED.
<br /> ANY DEFECT OR DEFICIENCY WHICH WOULD IMPAIR COMPLETE AND SATLSFACTORY CLEAN ADJACENT STRUCTURES AND IMPROVEMENTS OF DUST,DIRT AND DEERS CAUSED
<br /> PPPUCA1pNOOR INSTALLATION OF HIS WORK OR GUARANTEE. BY DEMOLITION OPERATIONS,AS DIRECTED BY ARGHRECTOR GOVERNING AUTHORITIES. EXRERIOR WALKS AND RAMPS TO BE LLGHTBft00M TEATURERMSH,UNLESS NOTED
<br /> RETURN ADJACENT AREAS TO CONDITION EXISTING PRIOR TO START OF WORK. OTHERWISE. >
<br /> MANUFACTURER'S INSTRUCTIONS:
<br /> WHERE INSTALLATIONS INCLUDE MANUFACTURED PRODUCTS,COMPLY WITH TB.TURNOVER REQUIREMENTS MIRROR FLATNORK AND CURBS-PROVIDE EXPANHONCONTRACRON JOINT AT20'0' p /�
<br /> MANUFACTURER'S TO THEAPPEIXTENTTHESE ARE
<br /> MORE
<br /> E EkECOMOR MORE STRINGENT
<br /> RING FOR ON CENTER MAXIMUM AND CONTROL.IOIMATSITY ON CENTER MA%IMUM. ���@^�e _��
<br /> MANUFLATIORTO THEEXTBLETHESE PALENSREDRECOMMEDATIONRMCENTTHAN I.THE CONTRACTOR SHALL ARRANGE FOR ALL INSPWTOliSAND FURNISH OWNERS
<br /> REQUIREMENTS INDICATED IN THE CONTACT DOCUMENTS. REPRESENTATIVE WITH THE CERTIFICATE OF OCCUPANCY.G.C.ISALSO TO PROVDEA
<br /> IYPEWRTTEN UST OFNAMES,ADDRESSES AND PHONE NUMBERS OF ALL 4.TERMITE CONTROL
<br /> PROVIDE ATTACHMENT AND CONNECTION DEVICES AND METHODS FOR SECURING WORK SUB-CONTRACTORS AND MATERIAL SUPPLIERS.
<br /> PROPERLY AS ITS INSTALLED;TRUE TO UNE AND LEVEL,AND WITHIN RECOGNEED QUAUTY ASSURANCE:CONFORM TO STATE,LOCAL,AND ALL OTHER
<br /> INDUSTRY TOLERANCES IF NOT OTHERWISE INDICATED.ALLOW FOR EXPANSIONS AND 2.THE CONTRACTOR SHALL BE RESPONSIBLE FORHAAN'G THE ENTIRE STORE CLEAN AND REGULATIONS FOR THE USE AND APPLICATION OF TOXICANT CHEMICALS.
<br /> BUILDING MOVEMENTS. SPOTLESS AT THE TIME OF FURNITURE INSTALLATION AND ATTIURNOVER. APPLICATOR SHALL BE A COMPANY SPECIALIZING IN SOIL TREATMENT FOR PANDA EXPRESS
<br /> TERMITE CONTROL WITH FIVE YEARS EXPERIENCE AND UCENSED FOR PROJECT C/Nf-RGJJ
<br /> VISUAL EFFECT: 3.PRIOR TO THE STORE OPENING,CONTRACTOR IS TO ARRANGE FOR AN INDEPENDENT LOCATION.SUBMIT COMPLETE PRODUCT DATA AND MANUFACTURER'S
<br /> PROVIDE UNIFORM JOINT WIDTHS IN EXPOSED WORK,ORGANIZED FOR BEST POSSIBLE BALANCING CONTRACTOR TO BALANCE THE HVAC SYSTEM AND PROVIDE COPY OF THE INSTRUCTIONS.INDICATE CANTON REQUIREMENTS. DUAL-MART CENTER
<br /> VISUAL EFFECT.REFER QUESTIONABLE VISUAL-EFFECT CHOICES TO BALANCING REPORT TO OWNERS REPRESENTATIVE WARRANTY:FURNISH FIVE YEAR WARRANTY AGAINST INVASION OR 11610 EVERGREEN WAY
<br /> ARCHRECTIOWNER'S REPRESENTATIVE FOR FINAL DECISION RECHECK MEASUREMENTS PROPAGATION OF SUBTERRANEAN TERMITES,DAMAGE TO BUILDING OR EVERETT,WA 98204
<br /> AND DIMENSIONS OF THE WORK,AS AN INTEGRAL STEP OF STARTING EACH 4.CONTRACTOR TO TURN OVER ALL KEYS TO THE OWNER'S REPRESENTATNE AND CONTENTS CAUSED BY TERMITES.INCLUDE COST FOR REPAIRS TO BUILDINGS
<br /> INSTALLATION, MARKNG EACH KEY FOR IDENTIFICATION.THE CONTRACTOR SHALL SEAL THE OR CONTENTS SO CAUSED.CERTIRCATION OF TREATMENT SHALL BE PROVIDED
<br /> CLOCKS,THERMOSTATS,ETC.PER OWNER'S REPRESENTATIVE'S REQUIREMENTS IN CLOSEOUT DOCUMENTS AT G.C.EXPENSE
<br /> MOUNTING HEIGHTS:
<br /> WHERE MOUNTING HEIGHTS ARE NOT INDICATED,MOUNT INDIVIDUAL UNITS OF WORK AT 5.THE CONTRACTOR SHALL EXPLAIN THE OPERATION OF ALL MECHANICAL SYSTEMS TO PRODUCTS:PROVIDE WATER EMULSION MATERIALS MANUFACTURED BY ONE OF
<br /> INEUSTRWRECOGNIZED STANDARD MOUMNGHRGHTS FOR APPLICATIONS INDICATED. THE OWNER'S REPRESENTATNE AND PROVIDING COPIES OF OPERATION,MAINTENANCE THE FOLLOWING:BASE TERMIDOR;DOW AGRO SCIENCES EQUITY 1.0 PERCENT;
<br /> REFER QUESTIONABLE MOUNTING HBGHT CHOICES TOARCHRECTOWNERS AND WARRANTY MANUALS. OR OTHER PRODUCT SUBSTITUTIONS IF APPROVED IN WRITING BY PANDA.
<br /> REPRESENTATNE FOR RNALDECSION.CONFORM WITH APPLICABLE ACCESSIBILITY
<br /> CODES WHERE REQUIRED. EXECUTION:VERIFY EXISTING CONDITIONS BEFORE STARTING WORK.APPLY IN A oOA
<br /> 1
<br /> ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS,STATE AND
<br /> FEDERAL LAWS AND OSHA REGULATIONS.COORDINATE INSTALLATION WITH /V,
<br /> ROUGH GRADING TO AVOID DISTURBANCES TO TREATED SOIL RETREAT ANY
<br /> DISTURBED SOIL DO NOT PERMIT SOIL GRADING OVER COMPLETED WORK.
<br /> TREATMENT SCHEDULE TREAT SOIL AT THE FOLLOWING LOCATIONS: SPECIFICATIONS
<br /> UNDER FOOTINGS;UNDER SLABS ON GRADE;BOTH SIDES OF FOUNDATION
<br /> WALLS;AND SOIL WITHIN 10 FEET OF BUILDING PERIMETER FORA DEPTH AS
<br /> RECOMMENDED BY THE MANUFACTURER FOR THE REGION WHERE PROJECT IS
<br /> LOCATED.
<br />
|