My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
>
Address Records
>
RUCKER AVE
>
3632
>
THE LANDING AT PORT GARDNER
>
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 3:14:26 PM
Creation date
4/6/2023 3:10:05 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3632
Tenant Name
THE LANDING AT PORT GARDNER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC ORKS PERMIT ate Applied: 7/27/2018 <br /> City of Everett Permit Services Public Works Permit#: PW1807-044 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: PW1805-050 <br /> Everett,WA 98201 Planning Reference#: <br /> V4",44 (425)257-8810 Public Works Fee: $500 <br /> 3 1 JUL 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MTT CONSTRUCTION LLC CHARLIE MORGAN AND ASSOCIATES, LLC <br /> 16000 CHRISTENSEN RD SUITE 150 <br /> SEATTLE, WA, 98188 , , <br /> PHONE: PHONE: <br /> TAX PARCEL ID#: 00451401301700 SITE ADDRESS: 3632 RUCKER AVE <br /> DESCRIPTION: TESC, CLEARING, MASS GRADING FOR NEW 51 UNIT APT COMPLEX <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Install and maintain erosion control measures per City of Everett Standards and approved TESC Plan, and/or as directed <br /> by the Public Works Inspector. Remove upon completion of the project prior to final approval of the permit. <br /> 5. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 6. It is the applicant/owner's responsibility to ensure that stormwater runoff from this site will be managed in a manner that <br /> does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the improvements <br /> located therein. <br /> 7. Any temporary construction related discharge to the City's sewer system must be approved and permitted by the Everett <br /> Industrial Pretreatment Division 425-257-8240. <br /> 8. This permit if for TESC, CLEARING, MASS GRADING ONLY---All other infrastructure construction will be authorized <br /> under a separate civil site permit. <br /> 7.33 <br /> Public Works Permit Fee Breakdown: r"a <br /> Erosion Control $200.00 r <br /> Grade/Fill/Excavate (3500 CY) $275.00 p_.1--'1"-i <br /> Land/lot Machine Clearing $25.00 c � <br /> m-) <br /> I <br /> I LA <br /> 1-•• <br /> CO <br /> 0 <br /> rat <br /> CJ1(.31 p • <br /> G -- •` <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS 1— <br /> The undersigned owner/applicant hereby agrees to hold and 1ve <br /> 7-31-2018 harmless the City of Everett from any and all claims for damages,costs, <br /> expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> App •ved for Const cti.n (Pu•lic Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace p " ; sett,/damaged thereby. <br /> 7131 FINAL INSPECTION Date <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.