Laserfiche WebLink
IECO <br /> :5N51GHT ENGINEERING CO. <br /> STORMWATER SITE PLAN <br /> For <br /> The Landing at Port Gardner <br /> 1-17\ ri r 7 <br /> Prepared for 1 <br /> aCI 1 6 73 <br /> City of Everett <br /> \21 <br /> 2930 Wetmore Ave r- F. <br /> 1TY • <br /> Everett, WA-98201 c <br /> Permit itviL;es <br /> 425.257.8700 <br /> Applicant/Owner: Contact: <br /> MTT Construction, LLC Brian R. Kalab, P.E. <br /> 16000 Christensen Rd, Suite 150 P.O. Box- 1478 <br /> Seattle, WA 98188 Everett, WA-98206 <br /> Contact: Debra Purcell 425.303.9363 <br /> Project Site Location: <br /> 3632 Rucker Ave <br /> Everett, WA 98201 <br /> IECO Project: 17-0891 <br /> Certified Erosion and Sedimentation Control Lead: <br /> Brian R. Kalab, P.E. <br /> Stormwater Site Plan Prepared By: <br /> Jacob D. Mealey, P.E. <br /> R. <br /> Stormwater Site Plan Preparation Date: 11?* WIt <br /> September 2, 2018 <br /> Date Revised: September 25,2018 <br /> , ,fi4t1 <br /> Approximate Construction Date: <br /> Nov 1, 2019 4>r, <br /> (*lAi.; <br /> P.O Box 1478 • Everett, WA 98206 • P: 425 303.9363 <br /> F: 425.303.9362 • infognsightengineering.net <br />