Laserfiche WebLink
• <br /> BMPs C150, C160, and C162 shall be used to manage the project. <br /> Erosion and sediment control BMPs for this project have been designed based on the <br /> following principles: <br /> Design the project to fit the existing topography, soils, and drainage patterns; Emphasize <br /> erosion control rather than sediment control; Minimize the extent and duration of the area <br /> exposed; Keep runoff velocities low; Retain sediment on site; Thoroughly monitor site and <br /> maintain all ESC measures and Schedule major earthwork during the dry season. The <br /> SWPPP shall be modified as necessary to include additional or modified BMPs designed to <br /> correct problems identified. Revisions to the SWPPP shall be completed within seven (7) <br /> days following the inspection. <br /> Element#13 —Protect On-site Stormwater Management BMPs for Runoff from Roofs <br /> and Other Hard Surfaces <br /> Onsite stormwater management for the roof and driveway area will be provided by a Storm <br /> tank system that will outlet into the City's combined sewer system. <br /> Insight Engineering Co. -Stormwater Site Plan 09/10/18 <br /> - 16- <br />