My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
>
Address Records
>
RUCKER AVE
>
3632
>
THE LANDING AT PORT GARDNER
>
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 3:14:26 PM
Creation date
4/6/2023 3:10:05 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3632
Tenant Name
THE LANDING AT PORT GARDNER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> CITY OF EVERETT STORMWATER MANAGEMENT MANUAL <br /> 3. If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded <br /> area protected. <br /> 3.2.10 BMP C123: Plastic Covering <br /> Purpose <br /> Plastic covering provides immediate, short-term erosion protection to slopes and disturbed areas. <br /> Conditions of Use <br /> 1. Plastic covering may be used on disturbed areas that require cover measures for less than 30 days, <br /> except as stated below. <br /> 2. Plastic is particularly useful for protecting cut and fill slopes and stockpiles. Note: The relatively <br /> rapid breakdown of most polyethylene sheeting makes it unsuitable for long-term(greater than <br /> 6 months) applications. <br /> 3. Clear plastic sheeting can be used over newly-seeded areas to create a greenhouse effect and <br /> encourage grass growth if the hydroseed was installed too late in the season to establish <br /> 75 percent grass cover, or if the wet season started earlier than normal. Clear plastic should not <br /> be used for this purpose during the summer months because the resulting high temperatures can <br /> kill the grass. <br /> 4. Due to rapid runoff caused by plastic sheeting, this method shall not be used upslope of areas that <br /> might be adversely impacted by concentrated runoff. Such areas include steep and/or unstable <br /> slopes. <br /> 5. While plastic is inexpensive to purchase,the added cost of installation, maintenance, removal, <br /> and disposal can make this an expensive material. <br /> 6. Whenever plastic is used to protect slopes,water collection measures must be installed at the base <br /> of the slope. These measures include plastic-covered berms, channels, and pipes used to covey <br /> clean rainwater away from bare soil and disturbed areas. At no time is clean runoff from a plastic <br /> covered slope to be mixed with dirty runoff from a project. <br /> 7. Other uses for plastic include: <br /> a. Temporary ditch liner <br /> h. Pond liner in temporary sediment pond <br /> c. Liner for permed temporary fuel storage area if plastic is not reactive to the type of fuel <br /> being stored <br /> d. Emergency slope protection during heavy rains <br /> e. Temporary drainpipe ("elephant trunk")used to direct water. <br /> Design and Installation Specifications <br /> 1. Plastic sheeting shall have a minimum thickness of 0.06 millimeters. <br /> 2. If erosion at the toe of a slope is likely,a gravel berm,riprap, or other suitable protection shall be <br /> installed at the toe of the slope in order to reduce the velocity of runoff. <br /> 3. Plastic slope cover must be installed as follows: <br /> a. Run plastic up and down slope,not across slope <br /> b. Plastic may be installed perpendicular to a slope if the slope length is less than 10 feet <br /> Volume II—Construction Stormwater Pollution Prevention <br /> 3-18 <br /> You created this PDF from an application that is not licensed to print to novaPDF printer(http://www.novapdf.com) <br />
The URL can be used to link to this page
Your browser does not support the video tag.