Laserfiche WebLink
• <br /> 29 0.0120 0.0064 <br /> 30 0.0117 0.0064 <br /> 31 0.0115 0.0064 <br /> 32 0. 0113 0.0064 <br /> 33 0.0113 0.0064 <br /> 34 0. 0112 0. 0063 <br /> 35 0.0111 0.0062 <br /> 36 0.0107 0.0061 <br /> 37 0.0102 0.0060 <br /> 38 0.0100 0.0060 <br /> 39 0.0100 0.0060 <br /> 40 0.0100 0.0059 <br /> 41 0.0097 0.0059 <br /> 42 0.0096 0. 0058 <br /> 43 0.0093 0.0058 <br /> 44 0.0091 0.0058 <br /> 45 0.0091 0.0057 <br /> 46 0.0089 0.0057 <br /> 47 0.0089 0.0056 <br /> 48 0.0089 0.0056 <br /> 49 0.0087 0.0055 <br /> 50 0.0086 0.0054 <br /> 51 0.0084 0. 0054 <br /> 52 0.0084 0.0054 <br /> 53 0.0082 0. 0053 <br /> 54 0.0080 0.0053 <br /> 55 0.0077 0. 0053 <br /> 56 0.0074 0.0052 <br /> 57 0.0071 0.0052 <br /> 58 0.0071 0. 0052 <br /> 59 0.0067 0.0050 <br /> 60 0.0062 0. 0048 <br /> 61 0.0028 0.0043 <br /> Stream Protection Duration <br /> POC #1 <br /> The Facility PASSED <br /> The Facility 1 -SS Jr- <br /> Flow(cfs) Predev Mit Percentage Pass/Fail <br /> 0.0061 17920 16750 93 Pass <br /> 0.0065 15133 7848 51 Pass <br /> 0.0069 12731 4229 33 Pass <br /> 0.0072 10611 4023 37 Pass <br /> 0.0076 8902 3835 43 Pass <br /> 0.0080 7510 3672 48 Pass <br /> 0.0083 6410 3529 55 Pass <br /> 0. 0087 5418 3358 61 Pass <br /> 0.0091 4596 3131 68 Pass <br /> 0. 0094 3906 2941 75 Pass <br /> 0.0098 3364 2770 82 Pass <br /> 0.0101 2915 2513 86 Pass <br /> 0.0105 2532 2271 89 Pass <br /> 0.0109 2184 2086 95 Pass <br /> Insight Engineering Co. -Stormwater Site Plan 09/10/18 <br /> -26- <br />