My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
>
Address Records
>
RUCKER AVE
>
3632
>
THE LANDING AT PORT GARDNER
>
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 3:14:26 PM
Creation date
4/6/2023 3:10:05 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3632
Tenant Name
THE LANDING AT PORT GARDNER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. Each stormwater system is unique and multiple criteria can affect maintenance frequency <br /> such as: <br /> a) System Design: pre-treatment/no-pretreatment, inlet protection, stand alone <br /> device. <br /> b) Surface Area Collecting From: hardscape,gravel, soil. <br /> c) Adjacent Area: soil runoff, gravel,trash. <br /> d) Seasonal Changes:fall-leaves,winter-salt/cinders. <br /> b. Second year plus; establish an annual inspection frequency based on the information collected <br /> during the first year.At a minimum an inspection should be perform semi-annually. <br /> c. Seasonal change; regional areas affected by seasonal change(spring, summer,fall, winter) may <br /> require additional inspections at the change of seasons in addition to semi-annually. <br /> 2. Inspect: <br /> a. Inspection ports. <br /> b. Inflow and outflow points including the inlet/manhole and pipes. <br /> c. Discharge area. <br /> 3. Identify and Report maintenance required: <br /> a. Sediment and debris accumulation. <br /> b. System backing up. <br /> c. Flow rate change. <br /> Maintenance Procedures: <br /> 1. Conform to all local, state and federal regulations. <br /> 2. Determine if maintenance is required. If a pre-treatment device is installed,follow manufacturer <br /> recommendations. <br /> 3. Using a vacuum pump truck evacuate debris from the inflow and outflow points. <br /> 4. Flush the system with clean water forcing debris from the system.Take care to avoid extreme direct <br /> water pressure when flushing the system. <br /> 5. Repeat steps 3 and 4 until no debris is evident. <br /> These maintenance guidelines were written by Brentwood Industries, Inc.with the express purpose of <br /> providing helpful hints.These guidelines are not to be construed as the only Brentwood approved <br /> methods for StormTankTM system maintenance or the final authority in system maintenance. Check with <br /> the stormwater system owner/project engineer for their contract/specification requirements and or <br /> recommendations. Contact your local StormTankTM distributor or Brentwood Industries for additional <br /> technical support if required. <br /> C� BRENTWOOD <br /> Revision: 610 Morgantown Road,Reading,PA 19611 <br /> 9/12/13 P:610-374-5109 F:610-736-1280 Email:Stormwater@brentwoodindustries.com 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.