My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
>
Address Records
>
RUCKER AVE
>
3632
>
THE LANDING AT PORT GARDNER
>
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 3:14:26 PM
Creation date
4/6/2023 3:10:05 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3632
Tenant Name
THE LANDING AT PORT GARDNER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Summary, pg 1 PROJ-SUM <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Oct 2017 <br /> General Info Project Title: Landing at Port Gardner Date 10/5/2018 <br /> PROD-SUM form Project Street Address: 3650 Rucker Ave For Building Department Use <br /> shall be provided as Project City,County,Zip: Everett,WA 98204 <br /> a cover sheet for all <br /> compliance form Project Owner or Rep: MTT Holdings <br /> submittals.Project - <br /> Title shall match Jurisdiction: <br /> project plans title <br /> block. <br /> Project Description New Construction and Additions <br /> Select all that apply to the El New Building ❑ Building Addition <br /> scope of project. <br /> Select Addition+Existing Existing Building Retrofit <br /> or Alteration+Existing if <br /> the existing building will be ❑Alteration ❑Change of Occupancy ❑Change in Space Conditioning <br /> combined with the addition <br /> or alteration to demonstrate <br /> compliance per Section ❑ Historic Building <br /> C502.1 or C503.1. <br /> Building Elements Scope-Select all that apply <br /> ❑All 0 Building Envelope ❑Mechanical Systems <br /> ❑Service Hot Water Systems ❑ Lighting Systems ❑Electrical Systems <br /> O All Commercial ® Group R-R2,R3,&R4 0 Mixed Use <br /> over 3 stories and all R1 <br /> Mixed Use-Building is greater than three stories above grade and it has both Commercial and Group <br /> Occupancy Type R occupancies. <br /> Mixed Occupancy-Building is three stories or less above grade and it has both Commercial and <br /> Group R2,R3 or R4 occupancies.Select All Commercial to document compliance for the commercial <br /> areas of the building. The residential spaces shall comply with the WSEC Residential Provisions. <br /> Select all that apply to the scope of project <br /> 0 Fully Conditioned ❑ Semi-heated2 ❑Refrigerated Spaces <br /> (Warehouse and/or Walk-in') <br /> ❑ Low Energy Space Category3 <br /> Space Conditioning <br /> Categories Eligible Low Energy Spaces <br /> ❑ Unconditioned ❑ Low energy heating/cooling capacity <br /> ❑Wireless service ❑ Greenhouse ❑Equipment building <br /> equipment shelter <br /> Floors Above <br /> Floor Area and Grade Building Gross Conditioned Floor Area Project Gross Conditioned Floor Area <br /> Stories 3 <br /> 0 Compliance Method 1 -General C Compliance Method 2-Total Building Performance <br /> Compliance Method 1-Projects shall demonstrate compliance with all applicable mandatory and <br /> prescriptive requirements of this code. Refer to C401.2,Item 1 for more information.Compliance forms to <br /> General Compliance include with a Prescriptive submittal:All applicable ENV,LTG,and MECH. <br /> Path Compliance Method 2-Projects complying via total building performance(TBP)shall include a summary of <br /> results from a whole building energy model per Section C407 and shall demonstrate compliance with all <br /> applicable mandatory provisions in this Code.Refer to Section C401.2,Item 2 for more information. <br /> Compliance forms to include with a TBP submittal:PROJ-SUM, ENV-CHK,LTG-EXT, LTG-CHK,and all <br /> MECH forms except MECH-ECONO and MECH-VENT(pending). <br /> Note 1-Refrigerated Spaces-They shall comply with the envelope and refrigeration equipment requirements in Section C410. Warehouse <br /> coolers and freezers shall also comply with the envelope requirements in C402. C410 takes precedent for overlapping requirements. <br /> Note 2-Semi-heated Spaces-If heated with equipment other than electric resistance may take an exemption for wall insulation.All other <br /> envelope assemblies shall comply with the thermal envelope provisions. <br /> Note 3-Exemptions For Low Energy Spaces-Low Energy spaces are exempt from all provisions in WSEC Section C402 Building Envelope, <br /> however all other applicable provisions in the Code do apply including lighting,mechanical,service water heating,etc. <br /> Note 4-Eligible Space Conditioning For Low Energy Greenhouses-Greenhouses are defined as spaces that maintain a specialized sunlit <br /> environment that is used exclusively for cultivation,protection and maintenance of plants.Cooling with outside air and/or evaporative <br /> cooling,and any form of heating equipment,are allowed under the Low Energy Greenhouse category.Greenhouses with cooling <br /> equipment that requires a condensing unit are NOT eligible. <br /> I / /f <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.