My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
>
Address Records
>
RUCKER AVE
>
3632
>
THE LANDING AT PORT GARDNER
>
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 3:14:26 PM
Creation date
4/6/2023 3:10:05 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3632
Tenant Name
THE LANDING AT PORT GARDNER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 5/29/2018 <br /> ,littimi City of Everett Permit Services Public Works Permit#: PW1805-050 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: B1805-043 <br /> Everett,WA 98201 Planning Reference#: <br /> 7viiiigi.j.7- <br /> (425) 257-8810 Public Works Fee: $1539.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MTT CONSTRUCTION LLC CHARLIE MORGAN AND ASSOCIATES, LLC <br /> 16000 CHRISTENSEN RD SUITE 150 <br /> SEATTLE, WA, 98188 , <br /> PHONE: 2067957738 PHONE: <br /> TAX PARCEL ID#: 00451401301700 SITE ADDRESS: 3632 RUCKER AVE <br /> DESCRIPTION: SITE WORK FOR NEW 51 UNIT APT COMPLEX <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 12/26/2018.Approved plans must <br /> remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction to set up a pre- <br /> construction consultation.All inspections must be formally requested. See the attached handout for phone number and online instructions <br /> to Request an Inspection. .� {i: ; <br /> 6. Discharge of Construction Stormwater to the combined sewer system requires a Discharge Authorization. Contact-fndu$ al ':..d <br /> Pretreatment at 425-257-8240 to initiate the process. , -, , " <br /> 7. City of Everett Water Department crews shall make all connections to City water main at owner/contr ' or's_gxi r se.Tins work to be <br /> under separate Utility Permits to be purchased at the Permit Services Counter per a cost estimate by th&SNat_ [ 4p tme ;Work shall <br /> be scheduled 4-6 weeks in advance. i=: <br /> 8.Work to install/upgrade the pedestrian signal pushbuttons is required and shall be performed under a separate deferred grmi p <br /> submittal. '= <br /> 9.All unused driveway approaches on this project's street frontages shall be removed and replaced with fuIrt eight curb, gutter and'-- <br /> sidewalk per city of Everett standards. <br /> z. <br /> 9.Where existing sidewalk is removed/replaced and there exists underground power for street lights and/o 'ttaffic signal wire, deveI j er <br /> shall coordinate with city and install new conduit and wires to meet city requirements at developers experisek;,i ,,,, . l ; <br /> 10.As-builts of storm, sanitary sewer, and water systems will be required to be submitted to the PW Ins ator: f Design and <br /> Construction Standards and Specifications for Development prior to final approval/close out of the permit:.;0^y 4-'";1!_:1 -, <br /> 11.A Landscape Inspection is required by the Planning Department prior to final by the Public Works In*e`ct'af:C-dngict the F Ia rj <br /> Department at 425-257-8731 to schedule the inspection. --i'+3 <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Schedule a Final inspection forii4is <br /> permit when all items have been completed. <br /> Public Works Permit Fee Breakdown: <br /> Paving (800SF) $45.00 <br /> PW Plan Review $498.00 <br /> PW Site Inspection $996.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> 9„4„4,, 12/26/2018 harmless the City of Everett from any and all claims for damages,costs, <br /> expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date I ' <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.