Laserfiche WebLink
Field Report Report#: 80196 <br /> A.A.R.Testing Laboratory, Inc.7126 180th Ave.N.E., Park 180,Suite C101, Redmond,WA 98052 <br /> Phone 425.881.5812 Fax 425.881.5441 <br /> Client: MTT Project Number: 18-889 <br /> 1600 Christensen Road, Permit#: B1805-043 <br /> Suite 150 <br /> Seattle,WA 98188 Project Name: The Landing at Port Gardner <br /> Contact: Kjell Lindberg(kjell@mttholdings.com) <br /> Address: 3650 Rucker Avenue <br /> City: Everett <br /> Inspection Performed: Lateral Framing <br /> Date: 8/7/2019 Time: Temperature: <br /> Location: All levels <br /> Documents Referenced: Simpson holdown lay-out and DCI correction list <br /> Re-inspection, report#80191 dated 8/5/2019 <br /> Contractor installed the missing (3) holdown runs in southwest unit per Simpson holdown lay-out. <br /> Compression studs verified on previous inspection. Pins can be pulled at contractor's discretion. <br /> Correction list from Engineer's walk-though on 6-19-2019: <br /> Item #1 - Holes in floor diaphragm being covered with plates or decking replaced. <br /> Item #6 -(3)2x4s added each side of beam <br /> Item #8 -Truss kickers were added where parallel to walls at 6' on center <br /> Item #9 -A35 also placed to connect wall section to roof to shear walls below <br /> Item#10-Web stiffeners placed in-between floor joist were specified. <br /> Note: Conforming. <br /> Distribution: ,d1 Distribute Client ❑ Distribute Contractor <br /> 1 Distribute Engineer ❑ Distribute Owner Inspector: Young, Noah <br /> Iv] Distribute Municipality❑ Distribute Other Reviewed by: Christensen,Chris <br /> Distribute Architect ❑ Distribute Other <br /> All reports are considered confidential and are the property of the client and A.A.R.Testing Laboratory, Inc. <br /> Reproduction except in full without the written consent of A.A.R.Testing is strictly forbidden <br /> t <br /> _'ice <br />