My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
>
Address Records
>
RUCKER AVE
>
3632
>
THE LANDING AT PORT GARDNER
>
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 3:14:26 PM
Creation date
4/6/2023 3:10:05 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3632
Tenant Name
THE LANDING AT PORT GARDNER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Field Report Report#: 80196 <br /> A.A.R.Testing Laboratory, Inc.7126 180th Ave.N.E., Park 180,Suite C101, Redmond,WA 98052 <br /> Phone 425.881.5812 Fax 425.881.5441 <br /> Client: MTT Project Number: 18-889 <br /> 1600 Christensen Road, Permit#: B1805-043 <br /> Suite 150 <br /> Seattle,WA 98188 Project Name: The Landing at Port Gardner <br /> Contact: Kjell Lindberg(kjell@mttholdings.com) <br /> Address: 3650 Rucker Avenue <br /> City: Everett <br /> Inspection Performed: Lateral Framing <br /> Date: 8/7/2019 Time: Temperature: <br /> Location: All levels <br /> Documents Referenced: Simpson holdown lay-out and DCI correction list <br /> Re-inspection, report#80191 dated 8/5/2019 <br /> Contractor installed the missing (3) holdown runs in southwest unit per Simpson holdown lay-out. <br /> Compression studs verified on previous inspection. Pins can be pulled at contractor's discretion. <br /> Correction list from Engineer's walk-though on 6-19-2019: <br /> Item #1 - Holes in floor diaphragm being covered with plates or decking replaced. <br /> Item #6 -(3)2x4s added each side of beam <br /> Item #8 -Truss kickers were added where parallel to walls at 6' on center <br /> Item #9 -A35 also placed to connect wall section to roof to shear walls below <br /> Item#10-Web stiffeners placed in-between floor joist were specified. <br /> Note: Conforming. <br /> Distribution: ,d1 Distribute Client ❑ Distribute Contractor <br /> 1 Distribute Engineer ❑ Distribute Owner Inspector: Young, Noah <br /> Iv] Distribute Municipality❑ Distribute Other Reviewed by: Christensen,Chris <br /> Distribute Architect ❑ Distribute Other <br /> All reports are considered confidential and are the property of the client and A.A.R.Testing Laboratory, Inc. <br /> Reproduction except in full without the written consent of A.A.R.Testing is strictly forbidden <br /> t <br /> _'ice <br />
The URL can be used to link to this page
Your browser does not support the video tag.