My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4836 GLENHAVEN DR 2023-04-06
>
Address Records
>
GLENHAVEN DR
>
4836
>
4836 GLENHAVEN DR 2023-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 3:31:46 PM
Creation date
4/6/2023 3:31:37 PM
Metadata
Fields
Template:
Address Document
Street Name
GLENHAVEN DR
Street Number
4836
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in PUBLICOVORKS PERMIT •DateApplied: 8/8/2022 <br /> City of Everett Permit Services Public Works Permit#: PW2208-005 <br /> EVERETT 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett, WA 9821 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $567.04 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> WALDEN DAROLD T TRUST DAROLD WALDEN <br /> 4836 GLENHAVEN DR 4836 GLENHAVEN DR <br /> EVERETT,WA,98203-1737 EVERETT,WA,98203-1737 <br /> PHONE: PHONE: <br /> TAX PARCEL ID#:00456700004000 SITE ADDRESS:4836 GLEN HAVEN DR <br /> DESCRIPTION: REPAVE EXISTING DRIVEWAY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at <br /> all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br /> SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed b the Ti W <br /> Inspector. . <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impd910-6'si:ItfaG s wfll be-managed on- <br /> site in a manner that does not adversely affect neighboring properties,including the City's right-of-way p`fid/oilcgas rr1enfs and.the <br /> improvements located therein. "" �' `' <br /> 11. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall e obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic control p(an;to be <br /> submitted for the area of requested closure.Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for thiZDermit when all items have Teen <br /> completed. -s.-c, _ <br /> 13. All work constructed within the public right-of-way must be removed or relocated at the owner's expensOitt e C):tj:ever requires use of <br /> the right-of-way for municipal purposes. °: "..' =: ,::::., <br /> Public Works Permit Fee Breakdown: <br /> ... <br /> Paving(1,800 SF) $45.00 AUGPW Plan Review $20.00 A 0 8 2022 <br /> PW Site Inspection $20.00 <br /> Stormwater System Development Fee $482.04 CITY op E VERETT <br /> Permit Se <br /> City of Everett Official Use Only IaVIVLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> may arise because of installation and maintenance of the <br /> �j����Z L improvement or other right-of-way use here to applied for and further <br /> O agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> _APPLICANT/JOB SITE COPY TREASURER ADDRESS FILE <br />
The URL can be used to link to this page
Your browser does not support the video tag.