Laserfiche WebLink
mil <br /> izi <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 9/20/2022 9/20/2022 BLDG 08-FRAMING RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 9/16/2022 3:26 PM John Galt <br /> Contact Name:John Galt <br /> Site Address:927 GRAND AVE <br /> Phone:4253672622 <br /> e-Mail:jegalt755@gmail.com <br /> Need mechanical rough in approval.Upload letter from engineer for use of screws in lieu of Simpson hanger. <br /> BLDG 09-FIRE <br /> 9/21/2022 9/21/2022 STOPPING/BLOCKIN RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> G REQUIRED <br /> Notes: <br /> 9/16/2022 3:26 PM John Galt <br /> Contact Name:John Galt <br /> Site Address:927 GRAND AVE <br /> Phone:4253672622 <br /> e-Mail:jegalt755@gmail.com <br /> DO NOT INSULATE. <br /> Mechanical rough in required and framing approval. <br /> BLDG 09-FIRE <br /> 9/30/2022 9/30/2022 STOPPING/BLOCKIN RAKEEB KHAN APPROVAL <br /> G <br /> Notes: <br /> 9/30/2022 9/30/2022 BLDG 08-FRAMING RAKEEB KHAN APPROVAL See notes <br /> Notes: <br /> 9/28/2022 2:19 PM John Galt <br /> Contact Name:John Galt <br /> Site Address:927 GRAND AVE <br /> Phone:4253672622 <br /> e-Mail:jegalt755@gmail.com <br /> See attached engineer letter. Note:if insulation is provided between rafter space and full depth of insulation extends over the wall top plate then OK to <br /> reduce to R-38(WSEC Table R402.1.1 note e)but provide 1 inch air space above the insulation. Minimum R-49 in all other areas. <br /> Verify baffles are in place during insulation inspection. Framing for door landings to be checked at final. <br /> D <br /> Printed: Friday, 24 February, 2023 3 of 5 04, <br /> SUPERION <br />