My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3618 SHORE AVE 2023-10-24
>
Address Records
>
SHORE AVE
>
3618
>
3618 SHORE AVE 2023-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 9:12:44 AM
Creation date
4/7/2023 7:27:25 AM
Metadata
Fields
Template:
Address Document
Street Name
SHORE AVE
Street Number
3618
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
411, • <br /> Cindy Bergsma <br /> From: Andrew Huang <br /> Sent: Wednesday, March 31, 2021 2:59 PM <br /> To: Lee Michaelis <br /> Cc: Thad Newport <br /> Subject: RE: PW2011-016 <br /> Lee, <br /> I've created a public works permit PW2011-016 for the public improvements(driveway,frontage, utilities,etc.). I'll <br /> review the Short Plat drawings you attached for public works and send you my comments soon. <br /> I do see some hard copy drawings for the building on Lot#2, as part of C2010-002. You are allowed to have a building <br /> permit for a single lot before the Short Plat and PW permits are approved. Please email me pdfs of the drawings and <br /> calculations if you'd like to proceed with the review of C2010-022. Note that you run the risk of constructing the <br /> building in a location that doesn't meet final Short Plat requirements. <br /> Before we review a building permit for the 2nd lot(Lot# 1),you would need to construct the public improvements in <br /> PW2011-016 or bond 120%of the cost of these improvements. <br /> Thanks, <br /> Andrew Huang, P.E., LEED AP BD+C <br /> L1.11I Technician I Permit Services <br /> 425.257.8810,Option 6 1425.257.8976 direct 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT everettwa.gov/permits <br /> COVID-19 Update: Please reference our website& online resources for updates to our service <br /> during the COVID-19 pandemic. Due to limited staff and increased volumes, response times have increased <br /> and may take as long as 3—5 business days. Your patience is appreciated as we respond in the order received. <br /> Thank you and stay well. <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> From: Lee Michaelis<lee.michaelis@pugetsoundplanning.com> <br /> Sent:Tuesday, March 30, 2021 9:39 AM <br /> To:Andrew Huang<AHuang@everettwa.gov> <br /> Subject: RE: PW2011-016 <br /> Andrew, <br /> I have a process question for you. I am attaching the civil plans and drainage report for the Building Permit that was <br /> submitted as you requested, each one titled with Building Permit. <br /> However,the short plat has since received preliminary approval and the civil plans and drainage report have been <br /> revised based on conditions of preliminary approval. I am also attaching the updated short plat documents, each one <br /> titled with Short Plat in the filename. The updated ones should probably be used for review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.