Laserfiche WebLink
Other Hard Surfaces: <br /> Permeable Pavement- Infeasible as are all infiltration BMP's for this site per the professional <br /> opinion of Nelson Geotechnical Engineers and not required to be evaluated as the project does <br /> not trigger flow control. <br /> Sheet Flow and Concentrated Flow Dispersion- The proposed 1,198 sf driveway on lot 1 will <br /> route flows to a catch basin which will direct flows along with rooftop runoff to stormdrain <br /> utility in Shore Ave. The future 1,145 sf driveway on lot 2 will sheet flow runoff into a <br /> catchbasin which will also route flows to the utility in Shore Ave. <br />