Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 5/27/2022 5/31/2022 ELEC 06-ROUGH IN MIKE BEARDA PARTIAL <br /> APPROVAL <br /> Notes: <br /> RYANM@PHASE3ELECTRIC.COM <br /> (5/31/2022 8:30 AM MCB) <br /> OK walls <br /> (5/31/2022 9:42 AM MCB) <br /> Ok walls <br /> 9/22/2022 9/22/2022 ELEC 05-SERVICE MICHAEL NO ACCESS eTRAKiT Inspection Request <br /> WICKLANDER <br /> Notes: <br /> 9/21/2022 6:23 PM PHASE 3 ELECTRIC LLC <br /> Contact Name:PHASE 3 ELECTRIC LLC <br /> Site Address:7705 EVERGREEN WAY UNIT G4 <br /> Phone:4253877091 <br /> e-Mail:RYANM@PHASE3ELECTRIC.COM <br /> 9/27/2022 9/27/2022 ELEC 10-FINAL STEVE BANKS COVERED W/O eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 9/26/2022 5:37 PM PHASE 3 ELECTRIC LLC <br /> Service/Final Inspection <br /> Contact Name:PHASE 3 ELECTRIC LLC <br /> Site Address:7705 EVERGREEN WAY UNIT G4 <br /> Phone:4253877091 <br /> e-Mail:RYANM@PHASE3ELECTRIC.COM <br /> Open up the ceiling for visual inspection there was never a ceiling T grid approval given.Energize the west portion of the space for testing for finals.No <br /> x-ray at this time just a disconnect. <br /> 9/27/2022 9/27/2022 ELEC 05-SERVICE STEVE BANKS APPROVAL <br /> Notes: <br /> 125 amp service to old portion of the space. <br /> 9/29/2022 9/29/2022 —7ELEC 10-FINAL STEVE BANKS PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 9/27/2022 9:03 PM PHASE 3 ELECTRIC LLC <br /> Contact Name:PHASE 3 ELECTRIC LLC <br /> Site Address:7705 EVERGREEN WAY UNIT G4 <br /> Phone:4253877091 <br /> e-Mail:RYANM@PHASE3ELECTRIC.COM <br /> Partial final approval everything complete except x-ray and label on panels service one of two and two of 2 etc. <br /> 9/29/2022 9/29/2022 ELEC 07-TGRID STEVE BANKS I APPROVAL <br /> Notes: <br /> I <br /> Printed:Thursday,23 February, 2023 2 of 3 rk <br /> SUPERION <br />