My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10115 HOLLY DR OLIN FIELDS APTS 2023-04-07
>
Address Records
>
HOLLY DR
>
10115
>
OLIN FIELDS APTS
>
10115 HOLLY DR OLIN FIELDS APTS 2023-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 8:43:02 AM
Creation date
4/7/2023 8:26:34 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
10115
Tenant Name
OLIN FIELDS APTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT# (39-C 0 - 43 8 <br /> BUILDING PLANNING <br /> Intake OK by: Date: Intake OK by: VIs Assign To: Date: 21 Dot 242, <br /> Intake Comments: Intake Comments: <br /> Zone utt4 <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use <br /> ❑ Route to Residential Building Residential Use I.Av14;•Noah) 1411•- <br /> ❑ Make this a"W" Permit • Proposed No. of Dwelling Units: <br /> Bldg/TI/Addn/Rem Size Total No.of Dwelling Units: <br /> Garage/Accessory Struct.Size — Planning/Landscape Inspection Required before Final? DYes No <br /> Number of Stories "In Lieu"Fee:Type: Amount$ <br /> Basement RI No DYes , Fin/Unfin s School Impact Fee: Total $ <br /> Type of Construction V'e= Calculated: Credit: <br /> Occupancy Group L1 ❑Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 1/1/2022: <br /> Fire Sprinklers: ❑Update Existing ONew System R1Not Req'd Park Impact Fee Total$ <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): - <br /> Fire Alarm: DUpdate Existing ONew System IX Not Req'd Permit Technicians:Apply Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: 0 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? DYes t1 No 0 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I RCW 64.55 docs required prior to final? DYes J1 No 0 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total $ 41, Additional Notes: <br /> Approved By:9)„ ; . v" Date: 24.0 a 24) - . <br /> PUBLIC WORKS. <br /> Additional Notes: c'v«^•kk- ftreMt+P. e= Intake OK by:-1171-3i Date: 10 i fl `-►2Z- <br /> �,vtyvR.c resst'S Intake Comments: PW Worksheet Needed if: <br /> t1c5 ►�•& .S est?L ❑Sys Dev Eval ❑Traffic Mit Eval <br /> Approved By: Afil Date: ((./9f'2 ❑Site Work or Drainage Proposed <br /> r ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate/Deferred Submittals Required: ❑Route this folder for PW Review at end ---PW Review Worksheet <br /> El Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ODeferred <br /> ❑This Permit is Approved by Public Works <br /> Fire Dept.Fees: ❑ See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑A Separate PW Permit is Required (Permit#: PW <br /> . -Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> Approved By: 1�9(/V� Date: I I -O ❑Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> 1YrOblic Works has no scope---PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: � i c+ Jt -t41....1.... <br /> Approved By: Date: Approved By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.