Laserfiche WebLink
PUBLIC WORKS PERMIT Date: 2/24/2016 <br /> Public WorksPermt#: P1602-048City of EverettPublicWorks Department3200Cedar StretParentPermt#:11111:.;:;.: <br /> Everett, A 9821(425) 257-8810PlanningReference#: SEPA15-001�18vOWNER NAME AND ADDRESS: PPANTKULAGA AHMET& SEVALA KULAGA AHMET& SEVALA <br /> 1205 130TH ST SE UNIT A 1205 130TH ST SE UNIT A <br /> EVERETT WA 98208 EVERETT WA 98208 <br /> PHONE: 4255016441 PHONE: 4255016441 <br /> TAX PARCEL ID# 28041200302700 SITE ADDRESS: 8307 5TH AVE W <br /> PW SITE FOR NEW 13 UNIT TOWNHOMES <br /> DEMO EX SFR FOUNDATION AND BUILD 13 UNIT MULTI-FAMILY TOWNHOMES. <br /> 14PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. An irrigation system is required for all landscaped areas and shall be installed prior to 1-. ; r....`;"_`,..., . ---issuance of a Certificate of Occupancy for any building. The applicant shall provide i�,,,�7 e-:�E::-c1=:'Z. :s:T =:! ';design of the proposed irrigation system to the Planning Department in advance of s i=Tl : :.:�: -- ;=a i, ' Winstallation in order to ensure it will meet zoning standards. This shall be submitted with "=°7.::-"-' ,-';f� .:. <br /> building permit application.5. Site Civil Work to be done per plans approved by the City of Everett Public Works , <br /> Department dated 10/5/2016.6. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 'aOprior to starting construction and with all other inspection requests. ;,;:. ;Mr8. Keep City streets clean at all times. No dirt/mud/rocks/debris to be tracked onto ::„_) , -„roadway. ,�-3 :: .-.,.i..— .-Lr� Z <br /> 9. Seasonal limitations strictly apply to this project for erosion and sedimentation control;.Th!'!-- ,n;: y?°-.a ;, ONo earthwork shall take place during the wet season from October 1st-April 30th 'yea" ' ""�` `"' -'without prior approval from the Public Works Inspector and any other authoriating 6*jursdiction <br /> Public Works Permit Fee Breakdown: O <br /> Erosion Control $50.00 <br /> Asphalt Paving $45.00 <br /> Grading/Fill/Excavation $90.00 <br /> PW Plan Review $1,032.98 <br /> PW Slte Inspection $2,065.95 ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> jj <br /> ai61,tha_ <br /> l0 _Sa causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> Approved for Construction Date remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date 16,,,77),,,,,4,e, fii /�Approved as Constructed Signature of Applicantate <br /> 365 <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 1111 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> 64 <br />