Laserfiche WebLink
im• <br /> Permit Inspections <br /> VERETT City of Everett <br /> WASHINGTON <br /> 2/4/2020 2/4/2020 BLDG 08-FRAMING KURT KECK CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> 2/3/2020 6:02 PM AGA REAL ESTATE LLC <br /> Contact Name:AGA REAL ESTATE LLC <br /> Site Address:10721 19TH AVE SE UNIT B <br /> Phone:2068300126 <br /> e-Mail:agabuilt@gmail.com <br /> 3/5/2020 3/5/2020 BLDG 08-FRAMING KURT KECK CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> 3/4/2020 6:27 PM AGA REAL ESTATE LLC <br /> Contact Name:AGA REAL ESTATE LLC <br /> Site Address:10721 19TH AVE SE UNIT B <br /> Phone:2068300126 <br /> e-Mail:agabuilt@gmail.com <br /> (3/5/2020 10:40 AM KMK) <br /> 1.Provide approved drawings for roof change <br /> 2.Complete plumbing groundwork inspection <br /> 3.Complete all previous corrections <br /> Leave all areas open for inspection.Do not cover. <br /> 3/12/2020 3/12/2020 BLDG 08-FRAMING KURT KECK NOT READY See previous corrections <br /> Notes: <br /> 3/10/2020 6:36 PM AGA REAL ESTATE LLC <br /> Contact Name:AGA REAL ESTATE LLC <br /> Site Address:10721 19TH AVE SE UNIT B <br /> Phone:2068300126 <br /> e-Mail:agabuilt@gmail.com <br /> 3/24/2020 3/24/2020 BLDG 08-FRAMING KURT KECK CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> 3/19/2020 4:42 PM AGA REAL ESTATE LLC <br /> Contact Name:AGA REAL ESTATE LLC <br /> Site Address:10721 19TH AVE SE UNIT B <br /> Phone:2068300126 <br /> e-Mail:agabuilt@gmail.com <br /> (3/24/2020 1:27 PM KMK) <br /> Partial framing inspection: <br /> 1.Check all anchor bolts.(minimum 2 per plate and no less than 12"from end). <br /> 2.Pre-rock at 2nd floor party wall behind mini-split mechanical to maintain fire separation <br /> 3.Fire block lid of wall chase behind shower head in master bath. <br /> 4.Prep for Fire Department inspection for"freeze protection":Insulate ONLY garage lid and spray foam at 3rd floor ceiling per plan.Then call Fire Dept <br /> for inspection regarding"freeze protection". <br /> 5.Recall for framing inspection when the above work is done. <br /> Printed:Wednesday, 22 March,2023 6 of 11 <br /> "FT <br /> SUPERION <br />