My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1920 MERRILL CREEK PKY 2023-04-07
>
Address Records
>
MERRILL CREEK PKY
>
1920
>
1920 MERRILL CREEK PKY 2023-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 12:02:10 PM
Creation date
4/7/2023 12:00:37 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1920
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> Michael Frei, President <br /> Facility Planning Services LLC <br /> 9805 NE 116th Street#7417,Kirkland,WA 98034 <br /> Cell: 206-799-5857 <br /> Web: www.facilityplanningservices.com <br /> From: Drew Martin<dmartin@everettwa.gov> <br /> Sent:Wednesday,July 20, 2022 9:12 AM <br /> To: Ed Minshull <edm@Imueller.com> <br /> Cc: Barry Chan<chan@mriconstructors.com>; Mike Frei<mike@facilitvplanningservices.com>; 'Ryan Hoggatt' <br /> <rhoggatt@umci.com> <br /> Subject: RE: [EXTERNAL] RE: City of Everett Permit Services: 1920 Merrill Creek Parkway(B2205-071) - First Building <br /> Review <br /> Hello, Ed. <br /> I reviewed the information. These comments are itemized with the original comments: <br /> 1. I can redline the plans to clarify new vs existing racks. <br /> 2. Please provide a foundation detail that I can attach to the drawings. It doesn't need any title block or other <br /> framing. I'm going to tape it into the set. Preferably a reasonable scale (example- 1/4"), and forward so that it <br /> will print at the correct scale. <br /> 3. I'm not clear how there is no uplift force. These are tall, heavy racks with a narrow base in at least one <br /> direction. That usually results in some level of net uplift. I'll have to review the calculations again. If the <br /> engineer has not yet included any overturning calculations using the required criteria (see comment below),this <br /> should be submitted for review. Note that the ACI criteria requires the overstrength factor to be applied to the <br /> seismic component prior to counteracting with the dead load (i.e., QE-D); a common mistake is applying the <br /> overstrength factor to the net result which is not correct(i.e., NOT(E-D)0). <br /> Drew Martin, P.E., S.E. <br /> gmAssociate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/T: 8 am - 12 pm & 1 pm—3 pm;Tu: 1:00pm-3:00pm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> From: Ed Minshull<edm@Imueller.com> <br /> Sent:Wednesday,July 20, 2022 6:43 AM <br /> To: Drew Martin<dmartin@everettwa.gov> <br /> Cc: Barry Chan<chan@mriconstructors.com>; Michael Frei<mike@facilityplanningservices.com>; 'Ryan Hoggatt' <br /> <rhoggatt@umci.com> <br /> Subject: RE: [EXTERNAL] RE: City of Everett Permit Services: 1920 Merrill Creek Parkway (B2205-071) -First Building <br /> Review <br /> Hi Drew, <br /> I want to make sure you received this. The tenant would like to start fencing soon to secure their product when they <br /> move into the building. Your help would be appreciated to get this phase permitted. <br /> Thank you, <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.