Laserfiche WebLink
PUBLIAVORKS PERMIT <br /> City of Everett Permit Services •Date Applied: 2/22/2018 <br /> Public Works Permit#: PW1802-030 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> (425) 257-8810 Public Works Fee: $8,937.30 <br /> 2 5 JAN 4-ui►� <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> WONG ALVIN &TINA KOO JAMESON ROSS <br /> 16309 SE 7TH ST <br /> BELLEVUE, WA, 98008 , , <br /> PHONE: PHONE: 4252522153 <br /> TAX PARCEL ID#: 28052000203400 SITE ADDRESS: 10725 19TH AVE SE <br /> DESCRIPTION: SITE WORK FOR 12 NEW TOWNHOMES <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans, SWPPP, and drainage report approved by the City of Everett Public Works Department dated <br /> 1/14/2019.Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request <br /> all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be <br /> under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall <br /> be scheduled 3-4 weeks in advance. <br /> 7. Shop drawings for the flow control riser shall be submitted to and approved by City of Everett Public Works prior to ordering the riser. <br /> 8.As-builts of storm, sanitary sewer, and water systems will be required to be submitted to the PW Inspector per City Design and <br /> Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 9. On-site water main will be staked within an easement to the City. The easement documentation will be submitted to the City prior to <br /> issuance of permits and must be recorded by the project team with a copy of the recorded document submitted to the City prior to final <br /> approval/close out of the permit. <br /> 10. A 1-year Warranty Bond in the amount of 10% of the construction costs for all public improvements shall be submitted to the City <br /> prior to final approval/close out of the permit. <br /> 11.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the City <br /> prior to final approval/close out of the permit. <br /> 12.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. Schedule the existing <br /> Planning Landscape inspection under"My Active Inspections" in your dashboard on the Online Permitting Portal. <br /> 13. Final approval of the project will be subject to an executed and recorded maintenance agreement substantially the same as agreed to <br /> during permit review. <br /> 14.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 22-Site Final within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> Public Works Permit Fee Breakdown: <br /> Paving (5,400SF) $45.00 \-\ <br /> Erosion Control $200.00 <br /> Grade/Fill/Excavate(645CY) $170.00 JAN 2 5 2019 <br /> PW Plan Review $1,793.49 _J <br /> PW Site Inspection $3,586.98 <br /> Stormwater System Development Fees(12,632) $3,141.83 CITY OF EVERETT <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF eiikt61074§rvices <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> / CIS �/� expenses,or causes of action that may arise because of installation and <br /> a maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace p blic property damaged thereby. <br /> AWP <br /> FINAL INSPECTION Date �� ZiOt� <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> f/LE <br />