"PA,,/-A <br /> • 4 <br /> PUBLIC WORKS <br /> s. <br /> b. Please see all redlines on the attached plans for required corrections in addition to all <br /> comments listed below. Frequently, redlines will be stand-alone and will not have an <br /> associated item in this corrections letter.Likewise,comments below may not have associated <br /> redlines. Please indicate to the City that all redlines have been adequately addressed by <br /> providing checkmarks or notes next to the City's redlines to indicate that it has been picked <br /> up or to answer a reviewer's question. A comment response letter can also be included with <br /> your resubmittal to address the comments below(handwritten remarks under each comment <br /> on this letter are perfectly acceptable). The below listed sheets have redlines. <br /> i. Sheet 2 of 5 <br /> 2. Planning Department corrections were previously sent and must be addressed. See attached for <br /> reference. If you have any questions regarding these comments, please contact Kelsey Heyd with <br /> the City of Everett Planning Department(425-257-7275 or KHeyd@everettwa.gov). <br /> a. These Planning comments/corrections are in relation to both the civil plan set and building <br /> plan sets provided. Additional comments or corrections may be required upon review of <br /> the requested information. <br /> 3. The comments below were generated from this project's Stormwater Reviewer. If you have any <br /> questions regarding these comments,please contact Erik Emerson with the City of Everett Surface <br /> Water Division(425-257-8995 or EEmerson@everettwa.gov). <br /> a. The section addressing MR5 should note that a small amount of permeable pavers will <br /> be used as a voluntary measure and will be modeled as landscape. <br /> b. Please provide existing and proposed site maps identifying land cover associated with <br /> the summary tables in the text, flow patterns and drainage systems in accordance with <br /> the Stormwater Site Plan requirements <br /> c. As noted in previous review comments,please provide the O&M manual as a separate <br /> document with appropriate cover and summary. Include the following summary <br /> information in the introduction: <br /> i. "The requirement for the O&M Manual to be retained on or within reasonable <br /> access to the site;" This comment does not appear to have been addressed. <br /> ii. "The requirement to transfer the O&M Manual to any new property owner along <br /> with the property, and" This comment does not appear to have been addressed. <br /> iii. "The requirement that a log of maintenance activity be kept and made available <br /> for inspection by the City upon request. The log must indicate what O&M <br /> actions were taken." <br /> d. As discussed with the designer the calculations provided cannot be verified. It appears <br /> that the design will not meet the flow control standard as currently shown. Please <br /> provide a flow control design which meets the standard and verifiable calculations to <br /> match. <br /> e. The project geotechnical report(s) should be included as an appendix to the stormwater <br /> site plan. <br /> f. On the site grading plan there is insufficient detail to determine how the surface will <br /> drain. It appears that some areas will be extremely flat(0.2% slope)to the point where it <br /> is unlikely that the paving can be constructed to prevent puddles from forming. See <br /> attached markups for locations of concern. <br /> g. How will runoff from the western portion of the site be collected and routed to the <br /> stormwater facility. As currently shown it appears that there is no mechanism to collect <br /> Page 2 of/1/ <br />