My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10725 19TH AVE SE 2023-04-07
>
Address Records
>
19TH AVE SE
>
10725
>
10725 19TH AVE SE 2023-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 2:42:41 PM
Creation date
4/7/2023 1:52:09 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10725
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inflow Area= 0.024 ac.100.00%Impervious, Inflow Depth> 1.65- <br /> Inflow = 0.07 cfs @ 11.92 hrs, Volume= 0.003 of <br /> Outflow = 0.07 cfs @ 11.93 hrs. Volume= 0.003 af, Atten=0%, Lag=0.4 min <br /> Routing by Stor-Ind+Trans method,Time Span=5.00-20.00 hrs.dt=0.05 hrs <br /> Max.Velocity=1.87 fps, Min.Travel Time=0.3 min <br /> Avg.Velocity=0.60 fps, Avg.Travel Time=0.9 min <br /> Peak Storage=1 cf @ 11.93 hrs <br /> Average Depth at Peak Storage=0.11' <br /> Bank-Full Depth=0.67' Flow Area=0.3 sf, Capacity=1.21 cfs <br /> 8.0' Round Pipe <br /> n=0.013 Corrugated PE,smooth interior <br /> Length=33.0' Slope=0.0100 7 <br /> Inlet Invert=459.80', Outlet Invert=459.47' <br /> MR#8 - Wetlands Protection <br /> No wetlands have been identified on or adjacent this site. <br /> MR#9 - Operation and Maintenance <br /> G. Maintenance and Operation Plan <br /> The City of Everett requires the owner or operator of the project drainage facility to maintain <br /> the facility in accordance with the City Maintenance Checklists. <br /> The following pages contain maintenance needs for components included in the project that <br /> are part of a drainage system. Those components must be contained within the project's <br /> Maintenance Plan. The property owner shall plan to complete a checklist for all system <br /> components on the following schedule: <br /> (M)Monthly from October through April. <br /> (A)Once in late summer(preferably September). <br /> (S)After any major storm(use 1 inch in 24 hours as a guideline). <br /> Photocopies of these pages shall be used and checked off for the problems looked for each <br /> time an inspection is completed. Comments on problems found and actions taken shall be <br /> noted. Some items do not need to be looked at every time an inspection is done. The <br /> suggested frequency at the left of each item shall be used as a guideline for inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.