My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10721 19TH AVE SE Geotech Report 2023-04-07
>
Address Records
>
19TH AVE SE
>
10721
>
Geotech Report
>
10721 19TH AVE SE Geotech Report 2023-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 2:12:14 PM
Creation date
4/7/2023 2:11:13 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10721
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation NGA File No. 1014317 <br /> Zerzura Townhome Development November 9,2017 <br /> Everett,Washington Page 13 <br /> USE OF THIS REPORT <br /> NGA has prepared this report for Mr. Ross Jameson and his agents, for use in the planning and design of <br /> the proposed development on this site only. The scope of our work does not include services related to <br /> construction safety precautions and our recommendations are not intended to direct the contractors' <br /> methods, techniques, sequences, or procedures, except as specifically described in our report for <br /> consideration in design. There are possible variations in subsurface conditions between the explorations <br /> and also with time. Our report,conclusions, and interpretations should not be construed as a warranty of <br /> subsurface conditions. A contingency for unanticipated conditions should be included in the budget and <br /> schedule. <br /> We recommend that NGA be retained to provide monitoring and consultation services during <br /> construction to confirm that the conditions encountered are consistent with those indicated by the <br /> explorations, to provide recommendations for design changes should the conditions revealed during the <br /> work differ from those anticipated, and to evaluate whether or not earthwork and foundation installation <br /> activities comply with contract plans and specifications. We should be contacted a minimum of one week <br /> prior to construction activities and could attend pre-construction meetings if requested. <br /> Within the limitations of scope, schedule, and budget, our services have been performed in accordance <br /> with generally accepted geotechnical engineering practices in effect in this area at the time this report was <br /> prepared. No other warranty,expressed or implied, is made. Our observations, findings,and opinions are <br /> a means to identify and reduce the inherent risks to the owner. <br /> o-o-o <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.