My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10721 19TH AVE SE 2023-04-07
>
Address Records
>
19TH AVE SE
>
10721
>
10721 19TH AVE SE 2023-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 2:36:50 PM
Creation date
4/7/2023 2:34:25 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10721
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Envelope Summary ENV-SUM <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Oct 2017 <br /> Project Info Project Title: Zezura Townhomes-North Building Date 08/09/2018 <br /> Applicant Info. Company Name: For Building Department Use <br /> Provide contact Company Address: <br /> information for <br /> individual who can Applicant Name: <br /> respond to inquiries <br /> about information Applicant Phone: <br /> provided. Applicant Email: <br /> Project Description 0 New Building ❑ Addition ❑ Alteration ❑ No Envelope Scope <br /> Envelope Project Scope ❑ All Commercial 2 Group R-Commercial ❑ Mixed Use-Commercial+Group R <br /> Select all that apply. <br /> ❑ Semi-heated ❑ Refrigerated Cooler ❑ Refrigerated Freezer ❑ Equipment Building <br /> Envelope Description <br /> Provide brief description of the project and <br /> relevant supporting documentation. <br /> If project includes multiple Target Insulation <br /> Allowance areas,and/or is demonstrating <br /> compliance as an Addition+Existing, <br /> Alteration+Existing,or <br /> Addition+Alteration +Existing project, <br /> provide a brief summary of the approach to <br /> whole building compliance. <br /> Air Barrier Testing 2 Air barrier testing per Section C402.5.1.2 included in project scope <br /> Air barrier testing is required for all new <br /> construction projects. Testing criteria is 0.40 ❑Additional Efficiency Package Option-C406.9 Reduced Air Infiltration <br /> cfm/ft2 under test pressure of 0.3 inch w.g. <br /> To comply with C406.9,demonstrate that ❑Testing not required. Explanation: <br /> measured air leakage of building envelope <br /> Compliance Documentation Scope and Method <br /> Scope of This Calculation ❑✓ New Building ❑ Addition ❑ Alteration ❑ No Envelope Scope <br /> Target Insulation Allowance ® Fully Conditioned-Commercial,Group R,Mixed Use <br /> Sets the title and calculations in the <br /> compliance forms. Selection required 0 Semi-heated Q Refrigerated Cooler Q Refrigerated Freezer <br /> to enable forms. If project includes more than one Target Insulation Allowance area,and/or if project includes <br /> addition and alteration areas complying independently,for each area complete an ENV-SUM form <br /> Rows 16-46 and either an ENV-PRESCRIPTIVE form,or ENV-UA+ENV-SHGC forms if <br /> demonstrating compliance via component performance. <br /> Envelope Compliance Path 0 Prescriptive QQ Component Performance <br /> Selection required to enable forms. <br /> Component Performance ❑ Change of Occupancy(C503.2)/Conditioning(C505)- 10%higher UA allowed <br /> Calculation Adjustments ❑ Additional Efficiency Package Option-C406.8 Enhanced Envelope-15%lower UA required <br /> Additions 0 Addition stand alone 0 Addition+Existing <br /> Addition stand alone-Complete Vertical Fenestration and Skylight Area Calculation.Enter total existing-to-remain wall,roof, vertical <br /> fenestration and skylight areas as EXISTING.Enter total addition envelope assembly areas as NEW.If resulting total building WWR exceeds <br /> 30%and/or SSR exceeds 5%,refer to C502.2.1 and C502.2.2 for prescriptive compliance alternatives.If complying via component performance, <br /> complete ENV-UA per instructions for addition stand alone projects. <br /> Addition+existing-Complete ENV-UA per instructions for addtion+existing projects. <br /> Alterations - ❑ Replacement windows only,or resulting ❑ Total building WWR increased by alteration <br /> total building WWR s original WWR <br /> Fenestration and Skylight <br /> ❑ Replacement skylights only,or resulting ❑ Total building SRR increased by alteration <br /> total building SRR s original SRR <br /> WWR and SRR not increased-Vertical Fenestration and Skylight Area Calculation not required. <br /> WWR and/or SRR increased-Complete Vertical Fenestration and Skylight Area Calculation.Enter total existing-to-remain wall,roof, vertical <br /> fenestration and skylight areas as EXISTING.Enter total altered envelope assembly areas as NEW.If resulting total building WWR exceeds 30% <br /> and/or SSR exceeds 5%,refer to C503.3.2 and C503.3.3 for prescriptive compliance alternatives.If complying via component performance, <br /> complete ENV-UA per instructions for alteration+existing projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.