<br /> 1.0 GENERAL REQUIREMENTS 6.0 THERMAL/MOISTURE PROTECTION 11.0 ELECTRICAL IRC CHAPTERS:34,35,36,37,38.39,40,&41
<br /> A DRAWINGS:THE DRAWINGS ARE INTENDED TO DESCRIBE THE OVERALL SCOPE OF WORK.CONTRACTOR A. ELECTRICAL WORK IS TO BE PERFORMED UNDER A SEPARATE PERMIT IN ACCORDANCE WITH THE NATIONAL I G
<br /> SHALL FIELD VERIFY EXISTING CONDITIONS AND ALERT THE ARCHITECT TO ANY UNFORSEEN CONSTRUCTION A ALL OPENINGS TO BE CAULKED,SEALED,OR WEATHER-STRIPPED.INCLUDES MECHANICAL EQUIPMENT ELECTRICAL CODE,ALL RELEVANT LOCAL CODES AND REGULATIONS AS WELL AS WORK REQUIREMENTS o
<br /> DIFFICULTIES BEFORE BEGINNING WORK.THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL ACCESS HATCHES&ALL EXTERIOR PENETRATIONS.MAINTAIN INSTALLED R-VALUE&SECURE INSULATION. INDICATED HEREIN&SUITABLE FOR THE INTENDED USES OF THE SPACES.
<br /> L EXISTING UTILITIES.EXISTING UTILITIES SHOWN HAVE BEEN OBTAINED FROM AVAILABLE RECORDS&ARE B. CAULK,SEAL,GASKET OR WEATHER-STRIP AT ALL OPENINGS BETWEEN HEATED&UNHEATED AREAS TO B. ELECTRICAL WORK SHALL BE COORDINATED BY THE GENERAL CONTRACTOR WITH THE WORK INDICATED L L
<br /> SHOWN FOR CONVINIENCE ONLY.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADDITIONAL UTILITY LIMIT AIR LEAKAGE INCLUDING AT THE FOLLOWING LOCATION. HEREIN.
<br /> LOCATIONS NOT SHOWN.CARE SHOULD BE TAKEN TO AVOID DAMAGE OR ANY MAJOR DISTURBANCE TO EXT.JOINTS AROUND WINDOWS&DOOR FRAMESlfRIM C. ELECTRICAL SERVICES REQUIRMENTS&WIRING TO BE IN ACCORDANCE WITH RECOMMENDED PRACTICES AS
<br /> EXISTING UTILITIES.(SEE STRUCTURAL,CIVIL,LANDSCAPE,MECHANICAL&ELECTRICAL DRAWINGS FOR b. OPENINGS BETWEEN WALLS&FOUNDATION,WALLS&ROOF,AS WELL AS BETWEEN WALL PANELS. PER CURRENTLY ADOPTED NATIONAL,STATE&LOCAL REGULATIONS.
<br /> ADDITIONAL NOTES,SYMBOLS AND DETAILS) c. OPENINGS AT PENETRATIONS OF UTILITY SERVICES THROUGH WALLS,FLOORS&ROOFS D. OVERHEAD ELECTRICAL SERVICES SHALL MAINTAIN A MINIMUM VERTICAL CLEARANCE OF:&FEET ABOVE
<br /> 6. JOINTS BETWEEN FACTORY BUILT FIREPLACES,VENTS,LOUVERS,INTAKES,SCREENS,PIPES,LIGHTS,
<br /> I B. PRE-CONSTRUCTION MEETING:PRIOR TO ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY THE SHROUDS,CANOPIES,MARQUEES,AWNINGS,HOSE BIBS.etc.AND ANY OTHER PENETRATIONS ROOFS,10-FEET AT BUILDING SERVICE ENTRANCE,12-FEET OVER RESIDENTIAL PROPERTIES,AND 18-FEET
<br /> OVER STREETS AND OTHER ROUTES SUBJECT TO TRUCK TRAFFIC.
<br /> CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING W/THE LOCAL BUILDING DEPT.AND/OR W
<br /> -jTHROUGHT INSULATED WALLS. E. IF RESIDENTIAL UNITS ARE TO BE HEATED WITH PACKAGED NC HEAT PUMPS.THE CONTRACTOR SHALL J
<br /> LOCAL PUBLIC WORKS DEPT.TO VERIFY WHICH AGENCY WOULD BE INVOLVED-DURING THIS MEETING THE 6 ALL OTHER OPENINGS BETWEEN UNITS.
<br /> CONTRACTOR WILL PROVIDE THE LOCAL INSPECTORS WITH A PROPOSED CONSTRUCTION SCHEDULE.THE C. APPLY NEOPRENE SEAL BETWEEN SOLE PLATES AND FLOOR(FOAM GASKET OR EQUIVALENT)AS INCLUDE&PROVIDE ALL POWER COMPANY'S COST TO INSTALL NECESSARY ELECTRICAL PROVISIONS& m
<br /> CONTRACTOR&INSPECTOR WILL TENTATIVELY SCHEDULE SEVERAL PHASED INSPECTIONS. SERVICE TO THE FACILITY.THESE COSTS SHOULD INCLUDE VAULTS,TRANSFORMERS,SERVICE LINES, 0
<br /> REQUIRED BY WASHINGTON RESIDENTIAL ENERGY STANDARDS. HANDHOLDS&ALL OTHER EQUIPMENT AND LABOR REQUIRED OR NECESSARY.THE CONTRACTOR SHALL W 2
<br /> C. ABBREVIATIONS.THROUGHOUT THE PLANS THERE ARE ABBREVIATIONS WHICH ARE IN COMMON USE.THE D. PROVIDE WEATHER PROTECTION PER(IRC E3501)INSTALL WEATHER RESISTANT BARRIER PROTECTING =O
<br /> ARCHITECT WILL DEFINE THE INTENT OF ANY IN QUESTION.ABBREVIATIONS OR PARTIAL CODE SECTIONS WALL STRUCTURE',FLASHING&COUNTER-FLASHING AT ALL OPENINGS TO MAKE THEM WEATHERPROOF. ALSO INCLUDE ALL OTHER COSTS TO PROVIDE ADEQUATE SRVICE FROM THE FACILITY TO THE POINT OF THE L)f
<br /> NOTED ON THIS PLAN&PLAN REVIEW LIST ARE INTENDED TO INDICATE THE NATURE OF THE PLANPOWER COMPANY'S TERMINATION. K N a
<br /> K E. ALL TEARS&JOINTS IN BATT INSULATION AT EXTERIOR WALLS&ROOF TO BE SEALED WITH TAPE. F. ELECTRICAL CONTRACTOR IS TO VERIFY ELECTRICAL OUTLETS.LIGHTING REQUIREMENTS&PANEL Z 07
<br /> 0.
<br /> �' DEFICIENCY OR GIVE ADDITIONAL INFORMATION.THE FULL TEXT OF THE CODE,AS INDICATED BY THE CODE F. ALL FLASHING&ARCHITECTURE SHEET METAL TO BE 23ga.GALVANIZED STEEL,AT 8'0"MIN.LENGHTS PER U
<br /> SECTION REFERENCE,ALWAYS APPLIES. SMACNA MANUAL UNLESS OTHERWISE NOTED.INSTALL AT ALL EXPOSED EXTERIOR OPENIINGS SO THAT LOCATIONS WITH OWNER. CI W
<br /> D. REPETITVE:TYPICAL WALL SECTIONS,FINISHES&DETAILS ARE NOT INDICATED EVERYWHERE AS THEY THEY ARE MADE WATERPROOF.CURB 8 PARAPATE FLASHING SHAH HAVE STADING SEEMS."ALL FLASHING a. PROVIDE ELECTRICAL OUTLETS PER IRC CHAPTER 39 YA p
<br /> OCCUR ON PLANS,ELEVATIONS&SECTIONS:REFER TO DETAILED DRAWINGS;CONTRACTOR TO PROVIDE AS CONNECTIONS TO BE SOLDERED" G. FOAM OUTLET GASKETS SHALL BE USED ON ALL RECEPTACLES,SWITCHES&OTHER UTILITY BOXES ON
<br /> IF DRAWN&INDICATED IN FULL EVERYWHERE. G. CAULKING AND SEALANT:USE POLYURETHANE SEALANT AT CONCRETE FLOOR AND SIDEWALK JOINTS,ALL EXTERIOR WALLS. W
<br /> E. CODES/PERMITS/REGULATIONS.WORK NOT PART OF THE WORK OF THE BUILDING WORK PERMIT AND TO OTHERS LOCATIONS USE SILICONE.USE PRIMER,BACKING ROD AND TAPES AS RECOMMENDED BY MFG. H. CAULK&SEAL OPENINGS IN BOX&WHERE BOXES MEET DRYWALL W/AN APPROVED SEALANT. Q-'
<br /> BE PERFORMED UNDER SEPARATE PERMIT INCLUDES,BUT NOT LIMITED TO:MECHANICAL&ELECTRICAL. H. PVA PRIMER PANT VAPOR BARRIER OR MEMBRAIN SHEET VAPOR BARRIER SHALL BE INSTALLED ON THE I. PROVIDE ELECTRICAL OUTLET BOXES AS REQUIRED BY IRC CHAPTER 39 OUTLET BOXES ON OPPOSITE SIDES
<br /> CONTRACTOR SHALL OBTAIN&PAY FOR ALL PERMITS NECESSARY,OTHER THAN THE BUILDING PERMIT. HEATED SIDE OF ALL EXTERIOR WALLS. OF THE COMMON WALL IN TOWNHOUSES SHALL BE SEPARATED BY A HORIZONTAL DISTANCE OF NOT LESS
<br /> THEY SHALL ALSO PAY FOR ALL THE FEES OR COSTS CHARGED BY THE BUILDING&CONSTRUCTION I. SEE G4.00 FOR LOCATION SPECIFIC AIR BARRIER REQUIREMENTS THAN 24
<br /> DEPARTMENTS,UTILITY AGENCIES,OR PRIVATE COMPANIES WHICH REQUIRE SUCH COSTS FOR,OR PRIOR J. ENCLOSED ATTICS&RAFTER SPACES RESULTING FROM CEILINGS APPLIED DIRECTLY TO THE UNDERSIDE J ELECTRICAL CONTRACTOR OR GENERAL CONTRACTOR SHALL STUB-OUT TO MEET CABLE TV,TELEPHONE
<br /> TO INSTALLATIONS.NOTHING IN THE DRAWINGS SHALL BE CONSTRUDED TO PERMIT AN INSTALLATION IN OF ROOF RAFTERS SHALL BE PROVIDED WITH A FREE VENTILATION AREA PER ROOF PLAN. AND POWER COMPANY SERVICES.
<br /> VIOLATION OF ANY APPLICABLE CODES AND/OR RESTRICTION.THE WORK TO BE PERFORMED UNDER THIS K. INSULATION:PROVIDE INSULATION AT ALL HEATED SPACES PER ENERGY CODE,SEE G4.00.ALL INSULATION K. CONTRACTOR SHALL PRE-WIRE BUILDING FOR TELEPHONE&CABLE T.AND PROVIDE JACKS FOR CAT-5,&
<br /> CONTRACT SHALL BE IN FULL ACCORDANCE W/THE LATEST RULES,REGULATIONS,RESTRICTIONS, TELEPHONE.PROVIDE THE APPROVED TELEPHONE CABINET PER SERVICE PROVIDER. 7
<br /> SHALL COMPLY WITH MANUFACTURER'S SPECIFICATIONS TO ACHIEVE PROPER DENSITIES,MAINTAIN
<br /> REQUIREMENTS&CODES-ALL WORK AS SHOWN ON THE CONTRUCTION DOCUMENTS IS PER THE IRC,AND L. ALL SMOKE DETECTORS SHALL BE POWERED BY THE BUILDINGS ELECTRICAL SYSTEM&HAVE A BACK-UP
<br /> CLEARANCES WHERE REQUIRED AND UNIFORM R-VALUES.EXTEND INSULATION OVER EACH FULL w
<br /> ITS AMENDMENTS PER THE STATE OF WASHINGTON AND THE AUTHORITY HAVING JURISDICTION THIS COMPONENT AREA TO INTENDED R-VALUE&ENSURE SUBSTANTIAL CONTACT OF INSULATION WITH EACH BATTERY FOR 90 MINUITES.
<br /> PROJECT FALLS UNDER ITS THE INTENT OF THESE DOCUMENTS TO COMPLY IN FULLY,AND ANY WORK SURFACE BEING INSULATED.INSTALL SO THAT REQUIRED VENTILATION IS NOT OBSTRUCTED.INSTALL WALL M. ELECTRICAL CONTRACTOR SHALL INSTALL RANGE HOODS&WIRE EXHAUST FANS PROVIDED BY OTHERS. m
<br /> PERFORMED IN VIOLATION TO THE IRC,LOCAL CODES OR ORDINANCES SHALL BE CORRECTED AT NO N. ELECTRICAL PANELBOARDS SHALL BE PROVIDED WITH A CLEAR WORKING SPACE NOT LESS THAN 30"WIDE S
<br /> EXPENSE TO THE OWNER. INSULATION SO THAT ENTIRE CAVITY IS FILLED,FACE STAPLE FACED INSULATION.INSTALL FLOOR BY 36'DEEP BY 6'-6"HIGH DIRECTLY IN FRONT OF THE PANEL _�
<br /> - F. CONFUCT IN CASE OF ANY CONFLICT WHEREIN THE METHODS OR STANDARS OF INSTALLATION OR THE INSULATION IN PERMANENT MANNER IN SUBSTANTIAL CONTACT WITH SURFACE BEING INSULATED',INSTALL O. RECESSED LIGHTING FIXTURES INSTALLED IN INSULATED AREAS SHALL CONFORM TO STATE ENERGY CODE.
<br /> MATERIALS SPECIFIED DON'T EQUAL OR EXCEED THE REQUIREMENTS OF THE LAW OR ORDINANCES,THE SUPPORTS @ 24"O.C.MAX.SEE G4.00 FOR LOCATION SPECIFIC INSULATION REQUIREMENTS P. PERFORM LOAD CALC'S.&DETERMINE TRANSFORMER&VAULT SIZE REQUIRED.COORDINATE VAULT DESIGN
<br /> LAWS OR ORDINACES SHALL GOVERN.NOTIFY ARCHITECT OF ALL CONFLICTS. L. ALL INSULATION MATERIAL INCLUDING FACINGS SUCH AS VAPOR BARRIERS OR BREATHABLE PAPERS AND ACCESS SCHEME W/ELECTRICAL CONTRACTOR,THE POWER UTILITY,THE CITY&THE ARCHITECT BASED
<br /> G. SHOP DRAWINGS:PROVIDE SHOPS DRAWINGS FOR THE ARCHITECTS APPROVAL AND AS REQUIRED BY THE INSTALLED WITHIN FLOOR-CEILING ASSEMBLIES,WALLS,CRAWL SPACES OR ATTICS SHALL COMPLY WITH ON LOADS
<br /> IRC N1102.2 AND HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25&A SMOKE DENSITY NOT TO EXCEED
<br /> CITY WITH JURISDICTION PRIOR TO CONSTRUCTION. 450 WHEN TESTED IN ACCORDANCE WITH ASTM E84.
<br /> H. SPECIAL INSPECTIONS:OWNER TO NOMINATE A TESTING LAB FOR SPECIAL INSPECTIONS AS REQUIRED BY M. ALL FOAM PLASTIC INSULATION USED IN THE BUILDING CONSTRUCTION SHALL BE INSTALLED IN 12.0 FIRE PROTECTION I
<br /> 1 THE CITY WITH JURISDICTION OVER THE PROJECT.INCLUDING THE FOLLOWING; ACCORDANCE WITH IRC R316.
<br /> a. A SPECIAL INSPECTOR SHALL BE PROVIDED DURING THE TAKING OF TEST SPECIMENS&THE PLACING OF a. CONRETE SLAB ON GRADE FLOORS OF HEATED SPACES SHALL BE INSULATED AT THE PERIMETER PER A THE BUILDING SHALL BE PROTECTED BY AN AUTOMATIC SPRINKLER SYSTEM PER IRC R313.THE SPRINKLER o
<br /> ALL REINFORCED CONRETE WITH A COMPRESSIVE STRENGTH SPECIFIED IN THE STRUCTURAL PORTION 6.4
<br /> REQUIREMENTS ON G4.00 SYSTEM SHALL CONFORM TO NFPA 13D OR P2904.RESIDENTIAL-TYPE SPRINKLER HEADS SHALL BE USED INDS
<br /> OF THESE DRAWINGS OF 3000pci AND GREATER.INCLUDING THE PLACING OF REINFORCED STEEL N. PERIMETER FOUNDATION INSULATION WITHIN CRAWL SPACE AREA MUST BE AN APPROVED PRODUCT. ALL HABITABLE SPACES IN EACH DWELLING UNIT.SPRINKLER SYSTEM SHALL BE SUBMITTED TO FIRE m
<br /> b. A SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON WHO SHALL SHOW COMPETENCE TO THE TO VERIFY WITH THE BUILDING INSPECTOR OR DEPARTMENT PRIOR TO INSTALLATION. DEPARTMENT FOR REVIEW.PROVIDE QUICK-RESPONSE SPRINKLER HEADS AS ALLOWED BY THE CODE a
<br /> SATISFACTION OF THE BUILDING OFFICIAL FOR THE PARTICULAR OPERATION.ALL INSPECTION REPORTS O. UNDER FLOOR AREAS SHALL BE VENTILATED BY AN APPROVED MECHANICAL MEANS OR BY OPENINGS IN STANDARDS. Z �!
<br /> _ SHALL BE SUBMITTED TO THE BUILDING DEPARTMENT WITH THE PROJECT NAME AND ADDRESS. INC( EXTERIOR FOUNDATION WALLS. B. EXTEND FIRE RESISTIVE WALL PROTECTION TO THE SOLE PLATE BEHIND THE TUBS&SHOWERS IN UNITS FF
<br /> R109.2) P. LINE DIRT AREAS UNDER HEATED FLOORS W/6-MIL MIN.BLACK POLYETHYLENE GROUND COVER.OVERLAP THAT ABUT A FIRE RATED WALL. . F
<br /> I. CHANGE ORDERS:ALL CONSTRUCTION ADDENDA,CHANGE ORDERS,OR DESIGN CLARIFICATIONS MUST BE AND TAPE ALL JOINTS 17'&EXTEND TO ALL FOUNDATION WALLS. C. MAINTAIN FIRE RESISTANCE&SOUND CONTROL VALUE AT ALL PERIMETER EDGES OF WALLS IN CONTACT
<br /> SUBMITTED TO THE BUILDING DEPT.OFFICE STAFF FOR REVIEW&APPROVAL PRIOR TO CONSTRUCTION IN Q. EXTERIOR GYPSUM SHEATHING AS REQUIRED BY WALL ASSEMBLY SHALL BE MOLD-RESISTANT 5/6'TYPE'X' WITH FLOORS,CEILINGS,BEAMS.etc.
<br /> W
<br /> THE FIELD.THE FIELD INSPECTOR WILL NOT APPROVE CHANGES TO THIS APPROVED PLAN& FIBERGLASS-REINFORCED EXTERIOR GYPSUM SHEATHING(DENS GLASS GOLD)U.N.O. D. PROVIDE FIRE EXTINGUISHERS AT EACH UNIT AS REQUIRED BY THE(IFC STANDARD 10-1)
<br /> K
<br /> 0 1
<br /> SPECIFICATIONS. E. FIRE DEPARTMENT REQUIRES WATER-MAINS,FIRE HYDRANTS&TEMPORARY FIRE DEPARTMENT ACCESS BE Z W
<br /> H J CONDITIONS ON CONSTRUCTION ACIVITY'.THE CONTRACTOR AND/OR RESPONSIBLE PARTY(S)SHALL LIMIT INSTALLED.INSPECTION AND APPROVAL MUST BE OBTAINED FROM THE FIRE MASHAL OF JURISDICTION H K _
<br /> THE WORKING HOURS OF ANY CONSTRUCTION ACITVITY NOT CONDUCTED ENTIRELY WITHIN AN ENCLOSED 7.0 ENERGY CODE PRIOR TO COMMENCEMENT OF COMBUSTIABLE CONSTRUCTION. 0 F
<br /> STRUCTURE TO NON-HOLIDAYS,AND WEEKDAYS WITH WORKING TIMES ALLOWED BY THE AUTORITY HAVING A.CONFORM TO THE CURRENT WASHINGTON STATE ENERGY CODE&ANY OTHER JURISDICTIONAL F. WALLS,CEILINGS&FLOOR/CEILING ASSEMBLIES REQUIRED TO BE FIRE PROTECTED SHALL HAVE ALL
<br /> JURISDICTION OVER THE PROJECT. OPENINGS AND PENETRATIONS INSTALLED/PROTECTED PER THE REQUIREMENTS OF(IBC CHAPTER 7.)
<br /> K. DIMENSIONS'.SURVEY DIMENSIONS OF SITE CONDITIONS ARE BY OTHERS.ARCHITECT BEARS NO REGULATIONS THAT APPLY. Z
<br /> G. FIRE BLOCKING ARE REQUIRED IN CONCEALED SPACES AT FLOOR AND CEILING LEVELS AND AT 10K.
<br /> RESPONSIBILITY FOR ACCURACY OF SAME.DIMENSIONS IN GENERAL ARE SHOWN PER THE GENERAL NOTES SEE G4.00 FOR PROJECT REQUIREMENTS INTERVALS BOTH VERTICAL&HORIZONTAL ALONG THE LENGTH OF THE WALLS IN COMBUSTIABLE 0 Dj
<br /> ON THE COVERSHEET CONSTRUCTION(IRC R302.11) ` W to
<br /> H. THE MAXIMUM FLAME SPREAD INDEX OF INSULATION SHALL NOT EXCEED 25 Y is8.0 DOORS/WINDOWS a. INSULATION SMOKE-DEVELOP INDEX SHALL NOT EXCEED 450 WHEN TESTED IN ACCORDANCE WITH ASTM Q Q
<br /> 2.0 SITEWORK A NOT LESS THAN ONE EGRESS DOOR SHALL BE PROVIDED THAT IS SIDE HINGED,SWINGING ADN SHALL E84
<br /> A HAZARDOUS MATERIAL:DISCOVERY OF ANY HAZARDOUS MATERIAL(ASBESTOS,CHEMICAL PESTICIDES,etc.) PROVIDE A CLEAR WIDTH OF 32 INCHES WHEN OPEN 90 DEGREES.WITH A CLEAR HEIGHT OF 78 INCHES. I. SEPARATION BETWEEN THE GARAGE AND THE DWELLING UNIT SHALL BE IN ACCORDANCE WITH TABLE R302.6 I 0
<br /> SHALL BE REPORTED IMMEDIATELY TO THE OWNER.CONTRACTOR IS RESPONSIBLE FOR APPROVALS, EGRESS DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL AND SHALL BE NOT LESS THAN 12"TYPE'X'GYPSUM WALL BOARD(GWB)ON THE WALLS AND 5/8"TYPE'X of
<br /> REMOVALS,DISPOSAL&CERTIFICATION AS REQUIRED BY LAW(OWNER TO ADVICE OF KNOWN EXISTENCE) KNOWLEDGE OR EFFORT(IRC R311.2) GWB ON THE CEILING WHERE HABITABLE SPACE IS ABOVE THE GARAGE
<br /> C B. LANDSCAPE:CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS&APPROVALS.EXCEPT BUILDING B. EGRESS DOORS SHALL BE PROVIDED WITH A LANDING ON EACH SIDE OF THE DOOR AT LEAST 36'MEASURED J. ENCLOSED SPACE UNDER STAIRS THAT IS ACCESSED BY A DOOR OR ACCESS PANEL SHALL HAVE WALLS G N
<br /> PERMIT. IN THE DIRECTION OF TRAVEL WITH A SLOPE NOT GREATER THAN 200 IN ANY DIRECTION(IRC R311.3) AND THE SURFACE UNDER THE STAIRS PROTECTED ON THE ENCLOSED SIDE WITH 1!7'GYPSUM WALL
<br /> C. SOIL CONDITIONS:THE ARCHITECT ASSUME NO RESPONSIBILITY AS TO THE PHYSICAL CHARACTER OF THE C. DOORS OTHER THAN THE REQUIRED EGRESS DOOR SHALL BE PROVIDED WITH LANDINGS OR FLOORS NOT K. BOARD.
<br /> ARE REQUIRED TO HAVE A FIRE-RESISTANCE RATING ALL RECESSED FIXTURES SHALL BE
<br /> SOIL NOR ACCURACY OF ENGINEERING DATA SUPPLIED OR INDICATED ON THE SOIL REPORTS MORE THAN 7 3/4"BELOW THE TOP OF THE THRESHOLD(IRC R311.3.2) WHERE WALLS THAT THE IRE TO FIRE-RESISTANCEAFIE-REST RATING NOT BE REDUCED.
<br /> D. PERMITS:CONTRACTOR TO MAKE NECESSARY ARRANGEMENTS OR SECURE NECESSARY PERMITS WITH THE a A TOP LANDING IS NOT REQUIRED WHERE A STAIR OF NOT MORE THAN(2)RISERS IS LOCATED ON THE L. INS PENETRATIONS IN FIRE-RESISTANCE RATED WALLS SHALL BE INSTALLED AS TESTED IN THE SPECIFIED _
<br /> GOVERNING AGENCY WHERE REQUIRED FOR SITE WORK OR TO BLOCK SIDEWALKS OR STREETS DUE TO EXTERIOR,PROVIDED THE DOOR DOES NOT SWING OVER THE STAIRS. -.
<br /> CONSTRUCTION. D. GLAZING IN LOCATIONS SUBJECT TO HUMAN IMPACT SHALL BE SAFETY GLAZING PER(IRC R308.3) APPROVED FIRE-RESISTANCE RATED ASSEMBLY I
<br /> a. REMOVE ALL SURPLUS FILL MATERIAL FROM THE SITE&LEGALLY DISPOSE OF THE DEBRIS. E. GLAZING'.PROVIDE GLAZING PER IRC&CURRENT WASHINGTON STATE ENERGY CODE(REFER TO 7.0 ABOVE) M. EXTERIOR WALLS AND ELEMENTS SHALL BE PROVIDED WITH A FIRE-RESISTANCE RATING AS SPECIFIED IN
<br /> _ E. SETBACKS:ALL SETBACKS TO BE CLEARLY MARKET ON SITE AND VERIFIED BY THE BUILDING INSPECTOR F. GLAZING IN HAZARDOUS LOCATIONS SHALL BE SAFETY GLASS AND COMPLY WITH(IRC R308.4) TABLE R302.1(1)OR R302.1(2) -
<br /> BEFORE THE POURING OF ANY CONCRETE. G. PROVIDE DOORPMNDOW HARDWARE AT ALL OPERABLE WINDOWS&DOORS.HARDWARE TO BE WITHIN 48"
<br /> F. SAFETY:THE CONTRACTOR SHALL PROVIDE COMPLETE SAFETY PRECAUTIONS AND MEASURES ON THE I OF THE ADJACENT INTERIOR FLOOR SURFACE. G
<br /> ENTIRE SITE,YARDS AND PASSAGEWAYS.IF SHORING IS REQUIRED;PROVIDE AUTO BARRIERS&PEDESTRIAN H. ENTRY&PATIO DOORS SHALL HAVE A THERMALLY BROKEN THRESHOLD.MAXIMUM 1/7'MIN.GRADE CHANGE 13.0 MISCELLANEOUS F 0
<br /> F PROTECTION TO ENSURE SAFETY&FALL PROTECTION RELATED TO THE EXCAVATION.COORDINATE DOWN TO EXTERIOR. 6NECESSARY PERMITS AND PRECONSTRUCTION MEETINGS WITH THE CITY DEPARTMENTS WITH JURISDICTION I. DOORS&WINDOWS BETWEEN HEATED&UNHEATED SPACES SHALL BE WEATHER-STRIPPED AROUND THEIR
<br /> OVER THE PROJECT. PERIMETER TO LIMIT AIR LEAKAGE WHEN CLOSED AND SHALL MEET THE REQUIREMENTS ON SHEET G4.00. _ w
<br /> G. SIGNAGE:THE CONTRACTOR IS TO INSTALL ADDRESS NUMBERS A MIN OF 4"IN HEIGHT IN ACCORDANCE J. AN ATTIC ACCESS OPENING SHALL BE PROVIDED TO ATTICS OF BUILDINGS WITH COMBUSTIBLE CEILINGS OR f->n =
<br /> WITH(IRC R319),COORDINATE WITH CITY OFFICIAL PRIOR TO REQUESTING FINAL INSPECTION. ROOF CONSTRUCTION(IRC R807) - e
<br /> V 5- N
<br /> -1 3.0 CONCRETE 9.0 FINISHES
<br /> INLI w w Al a
<br /> A CHAMPFER EXTERNAL CONRNERS ON EXPOSED EXTERIOR CONCRETE,3/4",EXCEPT WHERE FLUSH WALLS A THE CONTRACTOR SHALL BE BOUND TO THE FINISH SCHEDULE PROVIDED FOR ROOMS&SPACES,BUT
<br /> ARE DETAILED TO ABUT&WHERE SURFACES ARE INDICATED TO BE OTHERWISE FINISHED. SHALL ALSO BE RESPOSIBLE FOR PROVIDING OTHER MATERIALS NOT DESIGNATED IN THE ARCHITECTURAL I-Z N b N
<br /> B. FOUNDATION WALLS ENCLOSING A BASEMENT BELOW FINISHED GRADE SHALL BE DAMP-PROOFED ON THE SCHEDULE,IF REQUIRED IN THE FIELD TO CREATE A FINISHED PROJECT;SUCH AS AT WALKWAYS,FLOORS, Z W-m rn
<br /> OUTSIDE BY APPROVED METHODS AND MATERIALS. CEILINGS,DOORS,WINDOWS.SOFFITS,TREADS,FURRING,etc.PROVIDE LEVELING AND PATCHING WHERE12:11 25
<br /> E C. FOUNDATION ELEVATION HEIGHT TO BE SUFFICIENT TO ALLOW ADEQUATE SLOPE FOR DRAINAGE AWAY REQUIRED. E =Z m a 2
<br /> FROM THE FOUNDATION/BUILDING. B. ALL SHOWER AREAS SHALL BE FINISHED WITH A SMOOTH NON-ABSORBENT MATERIAL TO A HEIGHT OF NOT S
<br /> D. RECESS CONCRETE WHERE BRICK,TILE,STONE VENEER,etc.IS SHOWN SO THAT THE FINISH SURFACES LESS THAN 6-0'ABOVE DRAIN INLET THIS MATERIAL SHALL BE INSTALLED OVER WATER RESISTANT GYPSUM V J C
<br /> ALIGN WALL BOARD(MOLD-RESISTANT AS WELL)(INC R307) ill
<br /> E. ALL CONRETE FLOOR LEFT EXPOSED SHALL HAVE HARD-TROWELED OR BROOM FINISH(NON-SLIP)U N.O. C. INTERIOR FINISHES SHALL BE A FLAME SPREAD INDEX NOT GREATER THAN 200 AND A SMOKE-DEVELOPED
<br /> F. ALL EXTERIOR FLAT WORK,DECKS,DRIVES,ENTRIES,SIDEWALKS,WALKWAYS,TRASH-ROOMS,PORTE- INDEX OF NOT GREATER THAN 450(IRC R302.9) L7 CC a C E.G
<br /> COCHERE,COURTYARDS AND PATIOS SHALL SLOPE AWAY FROM THE BUILDING&INTO DRAINS.THE TOP D. GM:INSTALL PER RECOMMENDED SPECIFICATIONS FOR THE APPLICATION&FINISHING OF GYPSUM WALL
<br /> Q N L
<br /> - SURFACES OF THESE AREAS ARE TO BE BELOW THE ADJACENT INTERIOR FLOOR LEVEL AND SLOPE AWAY BOARD,PER ASTM C840-99AGWB SPECIFIED BY NAME IN WALL ASSSEMBIES SHALL BE USED PER 03 0
<br /> FROM THE BUILDING. MANUFACTURER SPECIFIED.
<br /> G. ARCHITECTURE REVEALS&RUSTICATIONS IN THE EXTERIOR CONCRETE WALLS SHALL BE 7'MIN.IN HEIGHT
<br /> I AND 1"MIN.DEPTH UNLESS DETAILED OTHERWISE. G a
<br /> H. EXPOSED EXTERIOR CONCRETE WALLS SHALL HAVE A SMOOTH,ARCHITECTURAL SURFACE&BE COVERED 10.0 MECHANICAL IRC CHAPTERS.14.15.16,17,18,&19
<br /> D N
<br /> WITH SAND TEXTURED,TROWELED-ON ACRYLIC FINISH,(COLOR BY ARCHITECT/OWNER) N/
<br /> D j I. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 2,500 PSI,EXCEPT WHERE VERTICAL A MECHANICAL WORK IS TO BE PERFORMED UNDER A SEPARATE PERMIT&IS TO CONFORM TO RELEVANT li
<br /> is
<br /> I CONCRETE(FOUNDATIONS AND WALLS)ARE EXPOSED TO THE WEATHER,AND WHERE PORCHES,CARPORT CODE®ULATIONS OF WORK/REQUIREMENTS INDICATED HEREIN. PERMIT APPROVAL STAMPS •
<br /> SLABS AND STARS ARE EXPOSED TO THE WEATHER.CONCRETE USED IN THESE LOCATIONS SHALL BE 3,000 B. MECHANICAL WORK SHOULD BE COORDINATED BY GENERAL CONTRACTOR WITH ALL OTHER WORK BONE ta
<br /> I PSI(R402.2) BY OTHER SUBCONTRACTOR/TRADES. N
<br /> a. GARAGE FLOOR SLABS SHALL BE 3,000 PSI(R402.2) C. PLUMBING&SEWER PIPE SIZING,GAS&MECHANICAL SIZING TO BE IN ACCORDANCE W/RECOMMENDED
<br /> J. MONOLITHIC SLABS-ON-GRADE WITH TURN-DOWN FOOTINGS SHALL HAVE NO FEWER THAN(1)#4 BAR AT PRACTICES AS PER CURRENTLY ADOPTED NATIONAL,STATE&LOCAL REGULATIONS.FLOOR DRAINS IN
<br /> THE TOP AND BOTTOM OF THE FOOTING PARKING GARAGE SHALL BE PROVIDED W/APPROVED OIL/WATER SEPARATOR IF REQUIRED BY LOCAL
<br /> K SLABS-ON-GRADE THAT ARE NOT CAST MONOLITHICALLY WITH THE FOOTING SHALL HAVE B3 OR LARGER JURISDICTION,AND CONNECTED TO SEWER IN ACCORDANCE W/PLUMBING CODES.
<br /> DOWELS WITH STANDARD HOOKS ON EACH END INSTALLED AT NO MORE THAN 4'ON CENTER D. ALL SERVICE WATER PIPING SHALL BE THERMALLY INSULATED AS REQUIRED BY IRC AND WASHINGTON
<br /> I STATE ENERGY CODE. o.-�--•
<br /> 4.0 METALS E ALL PIPING,CONDUITS,DUCTS.etc SHALL BE FURRED IN AT ALL FINISHED ROOMS,(U N.0) ', e
<br /> A GALVANIC INSULATION BETWEEN DISSIMILAR MATERIALS. F. ISOLATE ALL CONDUIT,DUCTS,PIPES,AND VENTS;FULLY SEAL ALL OPENINGS THROUGHT WHICH THEY _ my
<br /> C A PROVIDEORMED STEEL WALL FRAMING SHALL BE IN ACCORDANCE WITH IRC R603 PASS.USE RESILIENT SLEEVES,MOUNTS ORAND FIRE
<br /> UNDERLAYMENTS AS NECESSARY TO PREVENT THE PASSAGE C 1`o
<br /> OF SOUND BY THE MECHANICAL,ELECTRICAL AND FI SUPPRESSION SYSTEMS.INSULATE WASTE LINES TO
<br /> C. PROVIDE COLD-FORMED STEEL FRAMING,STRAPPING,OR BLOCKING REQUIRED FOR INSTALLATION& PREVENT THE PASSAGE OF SOUND FROM CONCEALED PLUMBING INTO ADJACENT LIVING SPACES&
<br /> ATTACHMENT OF WORK OF ALL OTHER TRADES. CORRIDORS(ALL INTERIOR ROOMS&CLOSETS)
<br /> D. ALL BEARING STUDS SHALL BE LATERALLY SUPPORTED G. ALL PIPING IN CEILINGS&EXTERIOR WALL SHALL BE ON THE WARM SIDE OF THE THERMAL INSULATION. ��
<br /> E. ALL MTL.STUD PARTITIONS ARE TO EXTEND TO UNDERSIDE OF STRUCTURE(U.N.O.IN DRAWINGS)WHERE H. CONTRACTOR TO FRAME OPENING IN WALLS,CEILINGS&FLOORS FOR MECHANICAL OR ELECTRICAL WORK
<br /> THEY CAN'T DO SO,DUE TO INTERFERANCES W/DUCTS,PIPING..ecl.PROVIDE BRACING TO STRUCTURE WHERE REQUIRED AND NOT OTHERWISE SHOWN ON THE PLANS.
<br /> - ABOVE TO PROVIDE EQUIVLENT SUPPORT TO WALL/PARTITION. I. PLACE NO MAINS.PIPING,CONDUITS OR ANY MECHANICAL OBSTRUCTIONS OF ANY KIND THAT MIGHT IMPAIR
<br /> lawma
<br /> F. CONTRACTOR SHALL PRIME&PAINT THE INTENDED PAINTABLE METAL STACKS.BEAMS/POST CONNECTIONS, GIVEN CEILINGS HEIGHT AND CLEARANCES. PROJ.NO:
<br /> VENTS,GRILLS OR LOUVERS WHICH PROJECT THROUGH WALLS OR ROOF AND IN VIEW(COLOR BY J. ALL SURFACE ATTACHED LADDERS USED ONLY TO ATTEND EQUIPMENT SHALL COMPLY WITH O.S.H.A
<br /> ARCHITECT) REGULATIONS 22006
<br /> G. ALL STRUCTURAL METAL AND BEAM SEATS SHALL BE NON-CORROSIVE FINISHED AFTER FABRICATION. K. HEATING SYSTEM SHALL COMPLY WITH ALL APPLICABLE CODES.
<br /> H. DECK RAILS,STAIR RAILS AND GUARDRAILS SHALL BE POWDER-COATED.CANOPY STRUCTURES SHALL BE L. PROVIDE WHOLE HOUSE VENTILATION SYSTEM FOR EACH DWELLING UNIT PER WA.STATE VIAQT,WITH PERMIT
<br /> B
<br /> B HOT-DIPPED GALVANIZED AND PAINTED MINIMUM SOURCE VENTILATION CLOSETCAPACITYREQUIREMENTS
<br /> COMPARTMENTS,AND LAUNDRY ROOMS SHALL BE PROVIDED WITH NATURAL
<br /> VENTILATION CHECKED BY:MJG
<br /> 5.0 WOOD/PLASTIC N. THE DISCHARGE OF EXHAUST AIR SHALL BE MIN OF 3ft.FROM ANY OPENING INTO THE BUILDING&A MINIMUM ISSUE DATE:09/13118
<br /> A ALL WOOD IN CONTACT W/CONRETE TO BE PRESSURE TREATED PER(IRC R317.1).USE SILL-SEAL UNDER OF 10R.FROM ANY AIR INTAKE. SCALE:1/T'=1'-P
<br /> EXTERIOR SOLE PLATES.WOOD STRUCTURAL PANELS SHALL BE IN ACCORDANCE WITH IRC R602.1.8. O. KITCHEN RANGE,DRYER,BATHROOM AND LAUNDRY ROOM VENTILATION DUCTS SHALL HAVE SMOOTH NON-
<br /> B. WOOD MEMBERS TO BE FASTENED PER TABLE R602.3(1)OR R602 3(2 - DRYER.COMBUSTIABLE,NON-ABSORBENT SURFACE AND SHALL BE EQUIPPED WITH A BACK-DRAFT DAMPER. a
<br /> P. DRYER,KITCHEN&BATH FANS&GAS FIRED WATER HEATERS ARE ALL TO BE VENTED TO THE OUTSIDE.
<br /> C. ALL RECESSED ELECTRICAL PANELS,CABINETS AND OTHER RECESSED CABINETRY SHALL BE BACKED WITH Q. TOILET ROOMS SHALL BE PROVIDED WITH A MECHANICAL OPERATED EXHAUST SYSTEM WHICH IS CAPABLE IRC GENERAL o
<br /> GYPSUM WALL BOARD TO MAINTAIN THE FIRE RESISTIVE RATING OF THE WALL/PARTITION IN WHICH THE UNIT OF PROVIDING A COMPLETE CHANGE OF AR EVERY 15 MINUTES.SUCH SYSTEM SHALL BE CONNECTED TO REQUIREMENTS ,ODI
<br /> IS BEING INSTALLED THE OUTSIDE&THE POINT OF DISCHARGE SHALL NOT BE LESS THAN 3ft.FROM ANY OPERABLE WINDOW.
<br /> D. THE CONTRACTOR SHALL BUILD IN ALL ROUGH BUCKS FOR GRILLS,REGISTERS etc.WHERE REQUIRED. R. WATER HEATERS SHALL BE PROVIDED W/SEISMIC STRAPPING/BRACING PER CODE.
<br /> E. PROVIDE BLOCKING/BACKING FOR ALL WALL HUNG CABINETS,FIXTURES,HARDWARE AND EQUIPMENT. GNITION SOURCES IN THE GARAGE SHALL BE ELEVATED AT LEAST 18"ABOVE FINISH FLOOR(IRC A
<br /> A S. ANY I F. PROVIDE SOFFITS AS NECESSARY TO CONCEAL EQUIPMENT AND DUCTS,ESPECIALLY AS NECESSARY FOR ANYM13 3) N
<br /> VENTINGMVAC. T. EACH CONTRACTOR IS RESPONSIBLE TO REVIEW THE MECHANICAL&ELECTRICAL DRAWINGS FOR CUTTING ,4
<br /> 0
<br /> AND PATCHING WORK BEYOND THE LIMITS OF THE PROJECT SHOWN ON THE ARCHITECTURE DRAWINGS. G I.00 El
<br /> J `..:1‘-
<br /> :le 16 I 14 1 13 12 I 11 1 10 I 9 8 I 7 1 6 1 5 4 I -I IF UNE DOES NOT MEASURE 1"SHEET IS NOT TO SCALE
<br /> IF ANY DISCREPENCIES ARE FOUND,NOTIFY ARCHITECT IMMEDIATELY.VERIFY CONDITIONS AND DIMENSIONS IN FIELD.
<br />
|