Laserfiche WebLink
Catagorie Labor Materials Total <br /> Planning $4,000.00 $4,000.00 <br /> "IP26:\ <br /> C)4 <br /> Site prep $1,250.00 $1,250.00 <br /> Excavation 111 $1,200.00 $650.00 $1,850.00 • <br /> Foundation $6,500.00 $6,500.00 <br /> Framing $4,000.00 $5,000.00 $9,000.00 <br /> Drains $350.00 $200.00 $550.00 <br /> Backfill $1,200.00 $200.00 $1,400.00 <br /> Roof $4,000.00 $4,000.00 <br /> Windows/Doors $1,500.00 $2,500.00 $4,000.00 <br /> Plumbing/Mechanical $4,000.00 $2,500.00 $6,500.00 <br /> Electrical $6,000.00 $2,000.00 $8,000.00 <br /> Insulation $5,500.00 $5,500.00 <br /> Drywall/Paneling $2,500.00 $3,500.00 $6,000.00 <br /> Paint $4,500.00 $4,500.00 <br /> Floor coverings $1,500.00 $2,500.00 $4,000.00 <br /> Floor heat $1,000.00 $1,250.00 $2,250.00 <br /> Tile $4,000.00 $2,500.00 $6,500.00 <br /> Cabinets/counters $1,250.00 $3,500.00 $4,750.00 <br /> Appliances $250.00 $1,400.00 $1,650.00 <br /> Trim & Finish $1,400.00 $2,500.00 $3,900.00 <br /> Mics. 5900 1350 — <br /> Totals $61,800.00 $31,550 $93,350.00 <br />