Laserfiche WebLink
P 503.224.9560 • 503.22 8.1285 . VV MCKNZE.CO <br /> RiverEast Center,1515 SE Water Avenue,#100,Portland.OR 97214 <br /> Portland.Oregon ■ Vanco3ver,Washington . Seattle,s lashington <br /> FM 458 MILL CREEK—PERMIT SET NARRATIVE—02.17.2020 <br /> • This 2020 minor within the wall remodel project is a tier one remodel for Fred Meyer <br /> • Key objectives of this project include "Space Optimization" of grocery, and the incorporation of key "Restock" <br /> initiatives along with interior paint and new Artisan decor <br /> • "Restock" initiatives include: Increase grocery sales area 20%while reducing home sales area 20% <br /> • Apparel Sales,Pharmacy Sales,Jewelry Sales,Photo Electronics and Music Sales departments to remain as is other <br /> than receiving new paint and Artisan decor. <br /> • Playland conversation to Storage with demolition of existing fixtures and construction of new wall with <br /> coordination of existing electrical and mechanical.Sheets:AD1.1.0,A1.1, and A1.6 <br /> • New under slab plumbing for new refrigerated cases floor sinks at Bakery, Deli and Produce Prep kiosk. Sheets: <br /> P1.1.2 and P1.4.2. <br /> • New specialty lighting at Meat, Bakery, Deli,Adult Beverage and Housewares. Sheets: E1.2.1 and E1.2.2. <br /> • New power for fixtures in multiple locations. Sheets: E1.3.1, E1.3.2, E1.3.4, E1.3.5, E1.3.5, E1.3.6, E1.3.7 and <br /> E1.3.8. <br /> • New Refrigerated case power in Bakery, Deli, Produce and Produce Prep. Sheets: E1.3.1.1 and E1.3.1.2. <br /> • There is no exterior work associated with this remodel. <br />