SCOPE OF WORK GOVERNING CODES SYSTEM RATING PHOTOVOLTAIC SYSTEM FIRE
<br /> TO INSTALL A ROOF MOUNTED SOLAR PHOTOVOLTAIC SYSTEM AT THE OWNER RESIDENCE CLASSIFICATION LISTING IN 000 kWDC 14. Lumio
<br /> LOCATED AT 2502 VICTOR PL, EVERETT, WA 98201, USA. 2020 NATIONAL ELECTRICAL CODE ACCORDANCE WITH UL 1703
<br /> THE POWER GENERATED BY THE PV SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY 2018 INTERNATIONAL FIRE CODE 10.500 kWAC STANDARD.
<br /> GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT. 2018 INTERNATIONAL BUILDING CODE SMART ENERGYTODAY
<br /> THE PV SYSTEM DOES NOT INCLUDE STORAGE BATTERIES. 2018 INTERNATIONAL RESIDENTIAL CODE SHEET INDEX 1550 DIGITAL DR,LEHI,UT
<br /> WASHINGTON ADMINISTRATIVE CODE (WAC) PV1 COVER PAGE 84043,USA
<br /> EQUIPMENT SUMMARY AHJ NAME : CITY OF EVERETT PV2 SITE PLAN
<br /> 35 Q CELLS Q.PEAK DUO BLK ML-G10+ (400W) MODULES WIRING AND CONDUIT NOTES PV3 ROOF PLAN
<br /> 35 ENPHASE IQ8PLUS-72-2-US (240V) MICROINVERTERS • ALL CONDUIT SIZES AND TYPES SHALL BE LISTED FOR ITS PURPOSE AND PV4 STRING LAYOUT&BOM
<br /> APPROVAL FOR THE SITE APPLICATIONS
<br /> GENERAL NOTES - ALL
<br /> ATTACHMENT DETAILS
<br /> CABLING
<br /> • THESE CONSTRUCTION DOCUMENTS HAVE BEEN BASED ON FIELD INSPECTIONS AND ALL PV CABLES AND WIRES BE#1 ,USE 2, PV WIRE, OR PV7 ELECTRICAL LINE&CALCS.
<br /> OTHER INFORMATION AVAILABLE AT THE TIME. ACTUAL FIELD CONDITIONS MAY REQUIRE PROPRIETARY SOLAR CABLING SPECIFIED BYYAWG MFR, OR EQUIVALENT; ROUTED TO SYSTEM INFO
<br /> MODIFICATIONS IN CONSTRUCTION DETAILS. SOURCE CIRCUIT COMBINER BOXES AS REQUIRED PV8 SPECIFICATIONS&NOTES
<br /> (35)Q CELLS
<br /> • ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE PV9-PV10 SIGNAGE Q.PEAK DUO BLK ML-G10+
<br /> • ARCHITECT HAS NOT BEEN RETAINED TO SUPERVISE ANY CONSTRUCTION OR DERATED ACCORDING TO AS PER LATEST NEC CODE. (40OW)
<br /> INSTALLATION OF ANY EQUIPMENT AT SITE. PV11 JOB SAFETY PLAN
<br /> EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE-2, 90'C RATED, WET AND UV (35)ENPHASE
<br /> • CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TOOLS, OBTAINS ALL RESISTANT,AND UL LISTED RATED FOR 600V, UV RATED SPIRAL WRAP SHALL BE PV12-PV21 EQUIPMENT SPECIFICATIONS SYSTEM
<br /> SIZE-US(00 k
<br /> PERMITS, LICENSES AND PAY ALL REQUIRED FEES AND COMPLETE INSTALLATION. USED TO PROTECT WIRE FROM SHARP EDGES DC SYSTEM SIZE:14.000 kWDC
<br /> • CONTRACTOR HAS THE FULL RESPONSIBILITY TO CHECK AND VERIFY ALL DIMENSIONS PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHN/THWN-2 PROJECT SITE AC SYSTEM SIZE:10.500 kWAC
<br /> AND EXISTING CONDITIONS. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER INSULATED, 90'C RATED, WET AND UV RESISTANT, RATED FOR 1000V AS PER
<br /> BEFORE PROCEEDING WITH THE WORK. ANY WORK STARTED BEFORE CONSULTATION AND APPLICABLE NEC
<br /> ACCEPTANCE BY THE ENGINEER SHALL BE THE SOLE RESPONSIBILITY OF THE _ re
<br /> CONTRACTOR AND SHALL BE SUBJECT TO CORRECTION BY THEM WITHOUT ADDITIONAL • 4-WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER \• �"s"'" REVISIONS
<br /> COMPENSATION. VOLTAGE TO GROUND MARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE
<br /> MEANS DESCRIPTION DATE REV
<br /> • DAMAGE CAUSED TO THE EXISTING STRUCTURE, PIPES, DUCTS, WINDOWS, WALL, FLOORS, REVISION 12/16/2022 A
<br /> ETC. SHALL BE REPAIRED TO THE ORIGINAL CONDITION OR REPLACED BY THE ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION
<br /> CONTRACTOR AT NO ADDITIONAL COST. • VOLTAGE DROP LIMITED TO 2% '
<br /> • THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE PROPER INSTALLATION AND . AC CONDUCTORS>4AWG COLOR CODED OR MARKED: PHASE A OR L1- BLACK, _ r
<br /> COMPLETION OF THE WORK WITH APPROVED MATERIALS. PHASE B OR L2- RED, PHASE C OR L3- BLUE, NEUTRAL-WHITE/GRAY
<br /> • NO CHANGES ARE TO BE MADE WITHOUT THE CONSULTATION AND APPROVAL OF THE • VOLTAGE DROP LIMITED TO 2% PROJECT NAME&ADDRESS
<br /> ARCHITECT. ., ►
<br /> • CONTRACTOR SHALL OBTAIN BOLDING PERMIT. NO WORK TO START UNLESS BUILDING • AC CONDUCTORS>4AWG COLOR CODED OR MARKED: PHASE AOR L1-BLACK,
<br /> PERMIT IS PROPERLY DISPLAYED. PHASE B OR L2- RED, PHASE C OR L3- BLUE, NEUTRAL-WHITE/GRAY Q
<br /> • ALL WORKMANSHIP AND MATERIALS SHALL BE OF FIRST QUALITY AND IN COMPLIANCE U)
<br /> WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE, THE DEPARTMENT OF
<br /> ENVIRONMENTAL PROTECTION AND ALL PERTINENT AGENCIES. �, o
<br /> • IT 1 S ESSENTIAL THAT ALL WORK PROCEED WITH THE MAXIMUM COOPERATION OF ALL — 00
<br /> N
<br /> PARTIES AND WITH MINIMUM INTERFERENCE TO THE OCCUPANTS WITHIN THE BUILDING. _ 0') CD
<br /> THE OWNER'S DIRECTIONS IN THIS REGARD SHALL BE FULLY COMPLIED WITH. U) Q
<br /> • ALL EXPOSED PLUMBING, HVAC, ELECTRICAL DUCTWORK, PIPING AND CONDUITS ARE TO . • - y 3 o
<br /> BE PAINTED BY GENERAL CONTRACTOR. a Data ; Terms or:Jse Report a map error � U o
<br /> • THE CONTRACTOR SHALL PERFORM THE WORK IN STRICT CONFORMANCE WITH THE HOUSE PHOTO SCALE:NTS z W
<br /> LOCAL LAWS, REGULATIONS AND THE NATIONAL ELECTRIC CODE. W c+)
<br /> • THE CONTRACTOR SHALL OBTAIN ALL PERMITS, APPROVALS, AFFIDAVITS, CERTIFICATIONS, PROJECT SITE m Cl W �
<br /> ETC.AND PAY ALL FEES AS REQUIRED BY THE LOCAL AUTHORITIES. Z W W CD
<br /> • CONTRACTORS SHALL OBTAIN FIRE CERTIF. UPON COMPLETION OF WORK. Q
<br /> 19 d
<br /> ELECTRICAL NOTES 8y U O d
<br /> • ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION.
<br /> _U
<br /> • ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90 DEGREE C WET 19th St >
<br /> ENVIRONMENT.
<br /> N
<br /> • WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY
<br /> Ln
<br /> TO,AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. N
<br /> • WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL
<br /> COMPLY WITH NEC 110.26.
<br /> • WHERE SIZES OF JUNCTION BOXES, RACEWAYS,AND CONDUITS ARE NOT SPECIFIED, THE Dutch Bros Coffee DATE: 12/16/2022
<br /> CONTRACTOR SHALL SIZE THEM ACCORDINGLY.
<br /> SHEET NAME
<br /> • ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. OVER PAGE
<br /> • MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE
<br /> SUPPORT RAIL, PER THE GROUNDING CLIP MANUFACTURERS INSTRUCTION. c
<br /> • MODULE SUPPORT RAIL SHALL BE BONDED TO THE MODULE N SHEET SIZE
<br /> 5%o- le RIVERSIDE ANSI B
<br /> ti,ap Data Terms of Use Report a map error 11 X 17
<br /> VICINITY MAP SCALE:NTS
<br /> SHEET NUMBER
<br /> PV-1
<br />
|