My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2502 VICTOR PL 2023-04-28
>
Address Records
>
VICTOR PL
>
2502
>
2502 VICTOR PL 2023-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 8:46:50 AM
Creation date
4/11/2023 6:14:20 AM
Metadata
Fields
Template:
Address Document
Street Name
VICTOR PL
Street Number
2502
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (35)O CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (400W) <br /> (35)ENPHASE <br /> I108PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:14.000 kWDC <br /> son SM SOLAR BONDING CONNECTION GROUND PATHS ; ■ .;; SOLAR ENDCLAMP, FIRST MODULE AC SYSTEM SIZE 10500kWAC <br /> ■� MOUNT INSTALLATION PAGE an MOUNT INSTALLATION PAGE <br /> -------_----------------------------------------------------------------------------------------------_----------------------GUIDE--:-------- _ -------- ---------------------------------------------------------------------------------------------------------------------------GUIDE-:-------- - -------- <br /> �/ REVISIONS <br /> A M B / ISt� 'sr - O © © I DESCRIPTION DATE REV <br /> A,00 0004 Ra //Y/ �' �� �s 1 REVISION 12/16/2022 A <br /> FFF a Oj►�` IA <br /> 'to <br /> T.B <br /> R^_ 0 Or <br /> vol <br /> J r <br /> . � � � PROJECT NAME&ADDRESS <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOTw/BONDING T-BOLT INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: NOTE:To assist insertioil of clamp into <br /> Bonding Hardware creates bond between Splrce ©serrated flange no removes Lfoot i modiration clamp is supplied as an assembly with a 1/2' Slide end clamp on to rail by Slide end clamp assembly rail slot,Pressure may be applied to <br /> ®Aluminum mid clamp with stainless steel bonding pins that pierce module frame Q bar and each rad section to bond LFoot to stainless steel T-born Q <br /> anodization to bond module to module through clamp hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side of bracket as shown.Do U) <br /> y�Aluminum splice bar spans across rail gap to Serrated T-bolt head penetrates ail anodization <br /> V create rad to rail bond.Rail on at least one Side grounded rails.The clamp should be installed on the with the top slat of the rails. engages with end of rail tial force clamp into rail by pushing <br /> Stainless steel nut bonds aluminum damp to stainless steel T-bolt m Mord T-Dolt.nut,and L-root ro <br /> of splice wnl be grounded SM rail rails prior to installing end modules. boU is extended as far as possiule End clamps are positioned on on bolt with excessive force. _ <br /> Serrated T-bolt head penetrates rail amortization to bond T-bolt,nut,clamp,and - so that clamp is positioned at max, rails prior to the first end <br /> modules to SM rail O <br /> distance from end of rail, module and prior to the Last N <br /> end module. 00 <br /> O O <br /> _ W Q O <br /> r <br /> - E > O <br /> -. _ _ N__ - BONDIN@�Lj� �' CO ,p V D t O rt O W 00 <br /> T-BOLTI 0 � Z W O <br /> E AA jIB 1 0 <br /> CK•SY67lM 7 BONDING BONDING <br /> BA0.IL lA� © /©� m 0 W LO <br /> OUND ♦ MOUNTMICROINVERTE0. W r^ > O <br /> / WEEBLUG(OR ILSCO LUG) ® z W W O <br /> _ 4� <br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with = Z <br /> Mex nut with capt"tock washer Wnds mesal wEEB washer mm les pierce eno0lzrd ted to Install the first end module for best appearance, <br /> [� () v flange in full contact with rail,rotate end clamp bolt until Cn O' <br /> II 4 microinverter mange to stainless steel T-bolt `-a create bond between rad and lug position module flush O 0- <br /> BONDING MIDCLA tv onto rails with the flange of clamp engages with flange to provide clamp force. with ends of rails.Rails Q <br /> 4 to bon d T-bolt head penetrates it anpduation <br /> ASSEMBLY - — ©Solid copper mreconneaedto lug isromedlo the module frame positioned To ensure bolt is not over-torqued,use low torque setting should not extend more <br /> to bond T-Doll nut,and L-loot tp grounded pyla final <br /> A SM rail,,.- m system ground connection. between end clamps an ends on drill or If using an impact driver,stop rotation as soon as �s than 1/2.beyond module. U <br /> nW,m.,.ryvsn,evnun®f,m.n,n ter- 1'ii:ic..�q r„n.t•z ce,�:,nr.:e:..ww 1 Module must be fully <br /> tr►nnu�,t„r._„ ars wto of rails. impact action of driver begins. supported by rails and <br /> IWLTO LFOUT d aoprolw rMmArwartar Mrnr.'w 1yn IN OT g <br /> -WAO"0INGT-BOLT '.`.t. -ir QUE VALUE($fE t.._. r..; �;,I..;o� ... �� cannot overhang ends N <br /> End clamp bolt to 5 ft-lbs.No anti-seize of rails. O <br /> LID <br /> N <br /> DATE: 12/16/2022 <br /> SHEET NAME <br /> EQUIPMENT <br /> SPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.