Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2212-126 Description: Rooftop Solar <br /> Applied: 12/16/2022 Approved: 12/20/2022 Site Address: 2502 VICTOR PL <br /> Issued: 12/20/2022 Finaled: 3/28/2023 City,State Zip Code: EVERETT,WA 98201 <br /> Status: FINALED Applicant: LUMIO HX(ELEC) INC <br /> Parent Permit: B2212-051 Owner: BURROWS SHAYNE T&BARBARA E <br /> Parent Project: Contractor: LUMIO HX(ELEC) INC <br /> Details: <br /> 35 Panel QTY IQ8 Inverter <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 2/7/2023 2/7/2023 ELEC 10-FINAL STEVE BANKS CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 2/3/2023 12:56 PM LUMIO HX(ELEC)INC <br /> Please call homeowner 360-305-9116.30 mins prior to arrival and to ensure access to the property.Thank you! If you have any questions please contact <br /> Install Manager Damon Jegg 360-269-4400. <br /> Contact Name:Shayne Burrows <br /> Site Address:2502 VICTOR PL <br /> Phone:3603059116 <br /> e-Mail:brennan.kelley@lumio.com <br /> The grounding electrode conductor and the bonding jumper must land on the grounded buss.The grounding electrode conductor cannot land on the <br /> can,and rely on the two threads of the bonding screw to ground the ground conductor. Install line installation protectors on the top side of the service <br /> entrance conductor terminals in the disconnect. <br /> 2/21/2023 2/21/2023 ELEC 10-FINAL STEVE BANKS CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 2/17/2023 12:17 PM LUMIO HX(ELEC)INC <br /> Please call homeowner 360-305-9116.30 mins prior to arrival and to ensure access to the property.Thank you! If you have any questions please contact <br /> Install Manager Damen Jeg 360-269-4400. <br /> Contact Name:Shayne Burrows <br /> Site Address:2502 VICTOR PL <br /> Phone:3603059116 <br /> e-Mail:pnw.permitting@lumio.com <br /> You cannot double lug in a single lug,and you cannot double lug a solid and standard connector together. <br /> I <br /> Printed:Tuesday,28 March,2023 1 of 2 rk <br /> SUPERION <br />