Laserfiche WebLink
2022 Stormwater System Development Fee Calculations <br /> Permit#: B2209-051 Additional Notes: <br /> Project Address: 2405 STATE ST Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: NEW GARAGE W/DADU calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: TAWNYA HERMAN Date: 2/1/2023 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: "7 w 7.. Date: 2 1 o 1/Z� <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> Permit#: B2209-051 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 880 SF <br /> Stormwater System Dev Fee: $235.66 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: PW2302-001 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 400 SF <br /> Stormwater System Dev Fee: $107.12 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />