Laserfiche WebLink
VERETT <br />0 <br />Permit Number: B2302-099 <br />Applied: 2/22/2023 <br />Issued: 2/27/2023 <br />Status: FINALED <br />Parent Permit: <br />Parent Project: <br />Details: <br />Roof replacement <br />Permit Inspections <br />City of Everett <br />Approved:2/23/2023 <br />Finaled: 3/8/2023 <br />Description: New roofs for homes, new roofs for existing home. <br />Site Address: 3417 LOMBARD AVE <br />City, State Zip Code: EVERETT, WA 98201 <br />Applicant: VICTOR RAMIREZ <br />Owner: Jeff Christensen <br />Contractor: ROOFING N RAMIREZ BOYS LLC <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />3/7/2023 <br />3/7/2023 <br />BLDG 16-FINAL <br />RAKEEB KHAN <br />APPRVD-PERMIT <br />as noted <br />FINAL <br />Notes: <br />3/1/2023 4:35 PM ROOFING N RAMIREZ BOYS LLC <br />Contact Name: Jeff Christensen <br />Site Address: 3417 LOMBARD AVE <br />Phone:5096389425 <br />e-Mail: jeffc9122@gmail.com <br />rfk changed Inspection Type from BLDG 14-ROOF NAILING to BLDG 16-FINAL <br />Inspected from the ground. Add back splash blocks. Add South side gutter downspout. Note rear detached garage roofing also replaced. <br />I <br />Printed: Wednesday, 08 March, 2023 1 of 1 rk <br />SUPERION <br />