My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Urban Artworks 1/19/2023
>
Contracts
>
6 Years Then Destroy
>
2023
>
Urban Artworks 1/19/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 10:11:09 AM
Creation date
4/12/2023 10:10:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Urban Artworks
Approval Date
1/19/2023
End Date
12/31/2023
Department
Economic Development
Department Project Manager
Tyler Chism
Subject / Project Title
Pacific Avenue Underpass Mural
Tracking Number
0003604
Total Compensation
$12,500.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />EXHIBIT A <br />SCOPE OF WORK <br /> <br />A. Project Description: <br />The goal of this project is to facilitate and provide materials for a public art painting project <br />to be sited at Pacific Avenue Bridge underpass, Everett, Washington. <br /> <br />B. Requirements: <br /> <br />1. The Artist agrees that an essential element of this agreement is the skill and creativity of <br />the Artist. The Artist, therefore, shall not assign the creative or artistic portions of the <br />Work to another party without the consent of the City. <br />2. In the event that the Artist must make changes to the design during construction, the <br />Artist shall present any changes in the scope, design, character, medium, structure or <br />installation of the project to the City for approval. <br />3. The Artist will provide information to the City regarding materials and finishes to be used <br />in the creation of the Work. Substitutions may be requested by the City in the event that <br />the proposed materials do not comply with health and safety issues. <br />4. The Artist shall acknowledge the City’s role in funding the Work in all public <br />presentations and written, printed or electronic publication of information regarding the <br />Work. <br />5. Facilitate and contribute to discussion with Everett Station District (ESD) Community <br />Advisory Group (CAG) to determine artwork theme and aesthetic <br />6. Issue a call to artists for sub-contracted artist(s) to assist with the project <br />7. Consolidate and present artist responses to call to artists to CAG <br />8. Work with subcontracted artist(s) to develop and finalize design based on feedback from <br />the City and CAG <br />9. Oversee artist communication, project management, production, and installation of the <br />mural <br />10. Handle call for volunteers and oversee community participation activities <br />11. Be present on site for painting of mural and ensure safe working environment <br />12. Provide materials and support to artist as needed for executing painting <br /> <br />C. Consultation: <br />The Artist will consult as necessary with the City’s Project Manager (or design staff and/or <br />sub-consultants) in order to complete the Scope of Work specified in this Agreement. <br /> <br />D. Art Work Description: <br />Painted mural(s) on the Pacific Avenue Bridge underpass. Style and form to be determined <br />following community advisory input and subcontracted artist(s) proposals <br /> <br />E. Technical Specifications: <br />Materials to be approved by City of Everett prior to application
The URL can be used to link to this page
Your browser does not support the video tag.