My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Urban Artworks 2/9/2023 (2)
>
Contracts
>
6 Years Then Destroy
>
2023
>
Urban Artworks 2/9/2023 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 10:47:13 AM
Creation date
4/12/2023 10:46:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Urban Artworks
Approval Date
2/9/2023
End Date
12/31/2023
Department
Economic Development
Department Project Manager
Tyler Chism
Subject / Project Title
printed vinyl mural in Everett Station District
Tracking Number
0003611
Total Compensation
$2,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF WORK <br />A.Project Description: <br />The goal of this project is to facilitate all steps and provide digital artwork to be installed on <br />donated billboard space in the Everett Station District in Everett, Washington <br />B.Requirements: <br />1.The Artist agrees that an essential element of this agreement is the skill and creativity of <br />the Artist. The Artist, therefore, shall not assign the creative or artistic portions of the <br />Work to another party without the consent of the City. <br />2.In the event that the Artist must make changes to the design during construction, the Artist <br />shall present any changes in the scope, design, character, medium, structure or installation <br />of the project to the City for approval. <br />3.The Artist shall acknowledge the City’s role in funding the Work in all public <br />presentations and written, printed or electronic publication of information regarding the <br />Work. <br />4.Facilitate and contribute to discussion with Everett Station District (ESD) Community <br />Advisory Group (CAG) to determine artwork theme and aesthetic <br />5.Issue a call to artists for sub-contracted artist(s) to assist with the project <br />6.Consolidate and present artist responses to call to artists to CAG <br />7.Work with subcontracted artist(s) to develop and finalize design based on feedback from <br />the City and CAG <br />8.Oversee artist communication and file transfer of final art <br />C.Consultation: <br />The Artist will consult as necessary with the City’s Project Manager (or design staff and/or <br />sub-consultants) in order to complete the Scope of Work specified in this Agreement. <br />D.Art Work Description: <br />Digital, print-ready art to be printed and installed on billboard in Everett Station District
The URL can be used to link to this page
Your browser does not support the video tag.