My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/04/12 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/04/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2023 9:34:23 AM
Creation date
4/13/2023 11:45:03 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br />Project title: Award the Contract for the WPCF TFI Bar Screen Upgrades Project to McClure and Sons Inc. <br />City Council Agenda Item Cover Sheet <br />Council Bill # <br />Agenda dates requested: <br />04/12/2023 <br />Briefing <br />Proposed action <br />Consent <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />x No <br />Budget amendment: <br />Yes x No <br />PowerPoint presentation: <br />Yes x No <br />Attachments: <br />Bid Summary <br />Department(s) involved: <br />Public Works, Legal <br />Contact person: <br />John Nottingham <br />Phone number: <br />425 257 8844 <br />Email: <br />jnottingham@everettwa.gov <br />Initialed by: <br />2 LS <br />Department head <br />Administration <br />Council President <br />Consideration: Award of Contract <br />Project: WPCF TFI Bar Screen Upgrades Project <br />Partner/Supplier: McClure and Sons Inc. <br />Location: Water Pollution Control Facility (WPCF) <br />Preceding action: Call for Bids — February 8, 2023 <br />Fund: Fund 336 — Water & Sewer System Improvements Fund <br />Fiscal summary statement: <br />The funding source for this project is Fund 336 — Water & Sewer System improvements. <br />The programmed available funding for the improvements to the WPCF TFI Bar Screen <br />Upgrades Project is $3,200,000. <br />Project summary statement: <br />During the review of the WPCF for the 2020 Facilities Plan assessments, the TF/SC <br />bypass structure and trickling filter Influent bar screens were found to be in poor <br />condition and lacking isolation controls. Replacement and improvements are needed to <br />ensure reliable WPCF operations and flow control. The TFI Bar Screen Upgrades Project <br />includes the rehabilitation of the secondary clarifier bypass structure and the installation <br />of a permanent bypass pipeline and structure to bypass the existing Trickling Filter bar <br />screens. <br />Bids were opened on March 14, 2023 with 2 bids received for the construction of the <br />proposed project. McClure and Sons Inc. submitted the lowest responsive bid in the <br />amount of $2,275,712.49, including sales tax. The Engineer's Opinion of Probable <br />Construction Cost was $1,700,000 including sales tax. Public Works staff recommends <br />that McClure and Sons Inc. be awarded the construction contract for the WPCF TFI Bar <br />Screen Upgrades Project in the amount of $2,275,712.49 <br />Recommendation (exact action requested of Council): <br />Award the Contract for the WPCF TFI Bar Screen Upgrades Project to McClure and Sons <br />Inc. in the amount of $2,275,712.49, which includes Washington State Sales Tax. <br />
The URL can be used to link to this page
Your browser does not support the video tag.