My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Communities, LLC 1/27/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
Planning Communities, LLC 1/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2023 10:49:12 AM
Creation date
4/14/2023 10:42:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Planning Communities, LLC
Approval Date
1/27/2023
Council Approval Date
1/1/1999
End Date
2/10/2024
Department
Information Technology
Department Project Manager
Vince Bruscas
Subject / Project Title
Fleet Electrification Transition Plan
Tracking Number
RFP 2022-109
Total Compensation
$906,530.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
challenges of using alternative fuels such as electricity and hydrogen fuel cells for day-to-day fleet operations and transit <br />agency vehicles. Parameters such as lifecycle costs of fleets, vehicle purchase costs, maintenance costs, fuel costs, drive <br />ranges, emissions and noise levels will be compared across the various alternative fuels. <br />Detailed Future Fleet Scenarios <br />The findings of the route modeling and battery sizing analysis will be integrated with an assessment of the related impacts <br />and broader benefits of transitioning to ZEVs in Everett. Our team will evaluate scenarios to compare emissions reductions; <br />community health and equity benefits; infrastructure requirements; and direct and indirect costs associated with various <br />scenarios. We can incorporate analysis of life cycle emissions, including emissions associated with energy production and <br />changes over time associated with the greening of the grid. Additional factors to be considered include funding availability, <br />skill development requirements, changes in maintenance equipment or schedules, and social and environmental benefits <br />and burdens. <br />Long-Term Fleet Management Plan <br />The Long-Term Fleet Management Plan will incorporate the fleet inventory, modeling, and analysis with an evaluation of <br />ZEV technologies available to develop a feasible and cost-effective long-term strategy for Everett Transit's fleet. <br />19 <br />19
The URL can be used to link to this page
Your browser does not support the video tag.