My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 75TH ST SW 2019 Plans 2023-04-19
>
Address Records
>
75TH ST SW
>
1802
>
Plans
>
1802 75TH ST SW 2019 Plans 2023-04-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 3:54:24 PM
Creation date
4/19/2023 2:04:13 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1802
Permit
B1904-010
Year
2019
Notes
ROOF REPAIR
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Location <br /> 1802 75th Street SW <br /> Everett,WA 98203 <br /> Project Description/Scope <br /> The Snohomish PUD Pump&Clean building is a 84'-0"x 38'-6"open structure framed with TJL truss <br /> joists,glulam beams, and concrete columns. A portion of the roof structure was recently damaged <br /> and removed. This scope of work includes the design for the replacement of the portion of the roof <br /> that was removed. The roof area that was removed is approximately 14'-0"x 38'-6"and will be <br /> replaced with new pre-engineered trusses @ 2'-0"OC and new sheathing. The new trusses and <br /> sheathing will attach to the existing undamaged roof support system. <br /> Scope of Work <br /> Provide structural calculations and drawings in accordance with the current building code. <br /> • <br /> Basis of Design <br /> Roof Loads Dead 13.5 psf <br /> Snow 25 psf <br /> Seismic Parameters <br /> V=Wp*[Sds/(R/le)]=Cs*Wp <br /> Sds=.962 (per USGS seismic response map) <br /> R=1.5 (intermediate moment frames) <br /> le=1.0 (non-essential facility) <br /> Wp=Seismic Dead Weight of Structure <br /> *note:Seismic loads govern over wind <br /> Summary of Structural Components <br /> The roof weight and wind area will be essentially the same as the original building configuration,and <br /> therefore the existing gravity and lateral loading of the structure will remain nearly the same. The <br /> damage to the structure was not caused by a wind or seismic event nor did it affect any vertical <br /> gravity or vertical lateral resisting elements. Per IEBC,the structue has not experienced substantial <br /> structural damage so repairs can be made in conformance with the intent of the original design. <br /> Description By Checked <br /> d Date 9/21/2018 <br /> Checked Date <br /> 0 Project Summary <br /> ENGINEERING Scale NTS Sheet No. <br /> 250 4th Ave South Project Job No. <br /> Suite 200 Sno PUD-Pump&Clean Building 19a10 d0 [� I <br /> Edmonds,WA 98020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.