My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/04/19 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/04/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2023 9:00:24 AM
Creation date
4/20/2023 9:21:40 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1 <br />City of Everett <br />Water Main Replacement "Y" Improvements <br />Consultant Project # 21001A <br />Scope of Services <br />March 23, 2023 <br />Project Description <br />The city (Client) has determined that certain segments of their existing water main system are prone to <br />breaks and the consequence of a potential failure in these areas would be high. Upgrading of these water <br />mains will ensure reliability of water service and adequate fire flow (per the 2020 Comprehensive Water <br />Plan) is provided to existing and future customers. <br />The city desires to design waterline replacement of these segments and bundle into a single <br />bid/construction package titled "Water Main Replacement "Y" improvement to be constructed in 2024. <br />The proposed segments of existing water main to be replaced are as follows: <br />1. Beverly Lane (74th St. SE to 76th St. SE) <br />Replace approximately 920 LF of existing 8-inch asbestos cement with new 8-inch ductile <br />iron water main. <br />2. 75th Street SE and Evergreen Way intersection <br />Replace approximately 110 LF of existing 8-inch asbestos cement pipe with new 8-inch <br />ductile iron water main. <br />3. Evergreen Way (south of 52nd St. SE) <br />Replace and upsize approximately 525 LF of existing 6-inch asbestos cement with 8-inch <br />ductile iron water main. <br />4. Interstate 5 bridge (E. Grand Ave. to 4th St. SE) <br />Replace and upsize approximately 800LF of existing 8-inch ductile iron suspended on 1-5 <br />bridge with new 12-inch ductile iron water main. <br />5. Madrona Avenue (W Mukilteo Blvd to Seahurst Ave.) <br />Replace and upsize approximately 2,200 LF of existing 6-inch cast iron with new 8-inch <br />ductile iron water main. <br />Scope of Services <br />Otak, Inc. (Consultant) proposes to provide the following services: <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.