My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/04/19 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/04/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2023 9:00:24 AM
Creation date
4/20/2023 9:21:40 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEVERETT <br />Project title: <br />An Ordinance Creating a Special Improvement Project Entitled "Parks Restrooms <br />Renovation Project", Fund 354, Program 088, to Accumulate Design Costs in the Amount <br />of $240,000 <br />Council Bill # interoffice use <br />CB 2304 — 25 <br />Agenda dates requested: <br />4/19, 4/26 and 5/3 <br />Briefing <br />Proposed action 4/19/2023 <br />Proposed action 4/26/2023 <br />Consent <br />Action 5/3/2023 <br />Ordinance <br />Public hearing <br />Yes X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Department(s) involved: <br />Parks & Facilities <br />Contact person: <br />Bob Leonard <br />Phone number: <br />425-257-8335 <br />Email: <br />bleonard@everettwa.gov <br />Initialed by: <br />2ML <br />Department head <br />Administration <br />Council President <br />Project: Parks Restrooms Renovation Project <br />Partner/Supplier: BCRA <br />Location: Howarth, Legion, TA Sullivan, and Forest Park <br />Preceding action: None <br />Fund: Fund 354, Program 088, (CIP-3) <br />Fiscal summary statement: <br />The proposed Ordinance will fund design for the Parks Restrooms Renovation Project. <br />Parks plans to renovate restrooms at four Everett parks locations (Howarth Park, Legion <br />Memorial Park, T.A. Sullivan Park and Forest Park). The design work will include an <br />engineer's estimate for the project construction. <br />Total project design cost is $240,000.00 <br />Project summary statement: <br />Based on the Facilities Condition Assessment report, the restrooms at Howarth, Legion, <br />TA Sullivan, and Forest Park are at their end of useful life. <br />Architectural & Engineering consultant services will be contracted to develop schematic <br />design, bid documents, construction drawings, and assist with bidding and construction <br />administration for the restroom renovation project. The Schematic Design will establish <br />the general scope, conceptual design, scale, and relationships among the components of <br />the project. The primary objective is to arrive at a clearly defined, feasible concept <br />while exploring the most promising alternative design solutions. This will allow the City <br />to make informed design decisions based on cost estimates which will determine the <br />project scope of work. <br />Upon completion of the design plans, specifications, and engineer's estimate, staff will <br />return and amend the Ordinance to capture all project costs. <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a special improvement project entitled "Parks Restrooms <br />Renovation Project", Fund 354, Program 088, to accumulate design costs in the Amount <br />of $240,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.