Laserfiche WebLink
`� COMMERCIA L BY DESIGN io���.w ��„t+ro�,w� 9es�s <br /> n.t t�n c���� <br /> To:. City of Everett (Public Works) � 6/8/04 <br /> 3200 Ceder Street <br /> Everett, Wa. 98201 <br /> Re' ProjecYsummaryfor 'The Hop Building'-Plan Check#B0405-0U5. <br /> The following is a response letter to comments dated May 18, 2004 for the <br /> proposed project shown above. <br /> 1. Plans have been updated. <br /> 2. Plans have been updated. <br /> 3. Plans have been revised ro show opening size (T2/2). ' <br /> 4. Occup. changed to R-3. - <br /> 5. Occup. changed to A-3. <br /> 6. Engineering provided for stair landings. � <br /> 7. Plans have been updated. <br /> 8. Plans have beeo updated. <br /> 9. Plans have been updated. <br /> 10. Ex. Duct and shaft are located on floor plans as Vent. <br /> 11. See note T2/2. <br /> 12. See T212. <br /> 13. Calc's. provided. <br /> I hope that our proposal will meet with your approval. Please let me know if <br /> you are in need of any further information or clarification. <br /> Respe ally Yours, - <br /> ��ick Kearney, CBD <br /> 0230 48th Ave. W. <br /> Mukilteo, Wa. 98275 <br /> Ph#(425) 349-8919 <br />