Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2302-055 Description: SFR-SOLAR INSTALLATION-(1)circuit,3.60 kW,MPU <br /> Applied:2/6/2023 Approved: 2/9/2023 Site Address: 318 VIEW RIDGE DR <br /> Issued:2/9/2023 Finaled:4/11/2023 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant:SOLGEN POWER(ELEC)LLC <br /> Parent Permit: B2302-019 Owner:JACOBSON PAMELA J <br /> Parent Project: Contractor:SOLGEN POWER(ELEC)LLC <br /> Details: <br /> PV Solar Roof Mount Installation, 1 circuit,3.60 kW,MPU <br /> LIST OF INSPE <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 4/10/2023 4/10/2023 ELEC 10-FINAL MIKE BEARDA APPRVD-PERMIT eTRAKiT Inspection Request <br /> FINAL <br /> Notes: <br /> 4/5/2023 10:58 AM SOLGEN POWER(ELEC)LLC <br /> PM Inspection preferred <br /> Contact Name:Micah A. <br /> Site Address:318 VIEW RIDGE DR <br /> Phone:4254426657 <br /> e-Mail:PERMITTING@SOLGENPOWER.COM <br /> MCB changed Inspection Type from ELEC 05-SERVICE to ELEC 10-FINAL <br /> I_ <br /> Printed:Tuesday, 11 April,2023 1 of 1 F� <br /> SUPERION <br />