|
16 24"Plastic Crosswalk Line SF 2,940 $ 14 . oo $ 41,16o,00
<br /> 17 24"Plastic Stop Bar IF 465 $ 17 ,oo $ 7,905 ,o0
<br /> 42,814
<br /> 18 Plastic Line LF 40, G• $ 2 . 50 $ 107,035. 00
<br /> 19 24"Plastic Green Bike Lane Extension Line SF 996 $ 17,oo $ 16,932 00
<br /> 20 Bike Lane Green Zones SF 2,363 $ 17 .O0 $ 40,171 .00
<br /> 21 Plastic Access Parking Space Symbol EA 4 $ 57o , oo $ 2,28o ,00
<br /> 22 Plastic Bike Turn Box with Green Background EA 1 $ 2,900,oo $ 2,900 ,o0
<br /> 23 Plastic Bicycle Lane Symbol with Arrow EA 12 $ 37o , oa $ 4,440 .00
<br /> 24 Plastic Bicycle Lane Symbol EA 80 $ 257 . O0 $ 20,560 00
<br /> Per
<br /> 25 Raised Pavement Markers,Type 2 Hund 4 $ 742, coo $ 2,968 . 00
<br /> 26 Temporary Pavement Markings IF 28,376 $ o . 5o $ 14,188 , 00
<br /> 1,315
<br /> 27 Vehicle Loop Detectors LF 2,162 $ 32 , 00 $ 42,08o 00
<br /> 28 Spill Prevention Control Plan LS 1 $ 755 .oo $ 755 00
<br /> Per
<br /> 29 Resolve Above Ground Conflicts EST 1 $ 3,000.00 $ 3,000.00
<br /> Per
<br /> 30 Erosion/Water Pollution Control EST 1 $ 5,000.00 $ 5,000.00
<br /> Per
<br /> 31 Asphalt Cost Price Adjustment CALC 1 $ 9,347.00 $ 9,347.00
<br /> 32 Removing Plastic Traffic Marking EA 3 $ 171 , 00 $ 513 ,00
<br /> 33 Removing Plastic Line IF 1,800 $ 2 00 $ 3,600 00
<br /> Removing 24" Plastic Crosswalk Line (Stop
<br /> 34 Bar) SF 50 $ 12.00 $ 600 . ao
<br /> 35 Type C Concrete Curb LF 204 $ 46 00 $ 9,384 00
<br /> 36 I Video Detection System I LS 1 $ 37,700. 00 $ 37,700.00
<br /> Total Bid Amount $ 1,616,161 . 61
<br /> 2023 PAVEMENT MAINTENANCE OVERLAY
<br /> WO#3789 February 14,2023 86
<br /> Provided to Suilders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
<br />
|